动态水库规则曲线--其创建和利用

IF 3.1 Q2 GEOSCIENCES, MULTIDISCIPLINARY
Nesa Ilich
{"title":"动态水库规则曲线--其创建和利用","authors":"Nesa Ilich","doi":"10.1016/j.hydroa.2023.100166","DOIUrl":null,"url":null,"abstract":"<div><p>This paper presents a methodology for the creation of dynamic reservoir rule curves on the basis of the results of implicit stochastic optimization coupled with optimized demand hedging embedded as constraints to optimization. The novelty of the method is a dynamic rule curve that always starts from the current storage level and projects a range of anticipated target levels in the immediate future based on the statistical analyses of the results of implicit stochastic optimization. The method is particularly useful in dry years when storage is not completely filled at the end of wet seasons. Such situations cannot be addressed with standard traditional rule curves, thus causing reservoir operators to base their decisions on mere judgment. The proposed method can be helpful in such situations. The method has been demonstrated on the Tawa reservoir in the Narmada River Basin in India.</p></div>","PeriodicalId":36948,"journal":{"name":"Journal of Hydrology X","volume":null,"pages":null},"PeriodicalIF":3.1000,"publicationDate":"2024-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"https://www.sciencedirect.com/science/article/pii/S2589915523000202/pdfft?md5=bf7c35088f989619546d164e0ec600bf&pid=1-s2.0-S2589915523000202-main.pdf","citationCount":"0","resultStr":"{\"title\":\"Dynamic reservoir rule curves – Their creation and utilization\",\"authors\":\"Nesa Ilich\",\"doi\":\"10.1016/j.hydroa.2023.100166\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"<div><p>This paper presents a methodology for the creation of dynamic reservoir rule curves on the basis of the results of implicit stochastic optimization coupled with optimized demand hedging embedded as constraints to optimization. The novelty of the method is a dynamic rule curve that always starts from the current storage level and projects a range of anticipated target levels in the immediate future based on the statistical analyses of the results of implicit stochastic optimization. The method is particularly useful in dry years when storage is not completely filled at the end of wet seasons. Such situations cannot be addressed with standard traditional rule curves, thus causing reservoir operators to base their decisions on mere judgment. The proposed method can be helpful in such situations. The method has been demonstrated on the Tawa reservoir in the Narmada River Basin in India.</p></div>\",\"PeriodicalId\":36948,\"journal\":{\"name\":\"Journal of Hydrology X\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":3.1000,\"publicationDate\":\"2024-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"https://www.sciencedirect.com/science/article/pii/S2589915523000202/pdfft?md5=bf7c35088f989619546d164e0ec600bf&pid=1-s2.0-S2589915523000202-main.pdf\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of Hydrology X\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://www.sciencedirect.com/science/article/pii/S2589915523000202\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"GEOSCIENCES, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Hydrology X","FirstCategoryId":"1085","ListUrlMain":"https://www.sciencedirect.com/science/article/pii/S2589915523000202","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"GEOSCIENCES, MULTIDISCIPLINARY","Score":null,"Total":0}
引用次数: 0

摘要

本文介绍了一种在隐式随机优化结果的基础上创建动态水库规则曲线的方法,并将优化需求对冲作为优化的约束条件嵌入其中。该方法的新颖之处在于,动态规则曲线总是从当前的储量水平出发,并根据隐式随机优化结果的统计分析,预测出近期的预期目标水平范围。这种方法在干旱年份特别有用,因为在雨季结束时,蓄水并没有完全蓄满。这种情况无法用标准的传统规则曲线来解决,从而导致水库运营商仅凭判断做出决策。所提出的方法在这种情况下很有帮助。该方法已在印度纳尔马达河流域的塔瓦水库得到验证。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Dynamic reservoir rule curves – Their creation and utilization

This paper presents a methodology for the creation of dynamic reservoir rule curves on the basis of the results of implicit stochastic optimization coupled with optimized demand hedging embedded as constraints to optimization. The novelty of the method is a dynamic rule curve that always starts from the current storage level and projects a range of anticipated target levels in the immediate future based on the statistical analyses of the results of implicit stochastic optimization. The method is particularly useful in dry years when storage is not completely filled at the end of wet seasons. Such situations cannot be addressed with standard traditional rule curves, thus causing reservoir operators to base their decisions on mere judgment. The proposed method can be helpful in such situations. The method has been demonstrated on the Tawa reservoir in the Narmada River Basin in India.

求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Journal of Hydrology X
Journal of Hydrology X Environmental Science-Water Science and Technology
CiteScore
7.00
自引率
2.50%
发文量
20
审稿时长
25 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信