{"title":"评估一般合同条件中返工条款的混合方法","authors":"R. Asadi, Suzanne Wilkinson, J. Rotimi","doi":"10.5130/ajceb.v23i3/4.8617","DOIUrl":null,"url":null,"abstract":"Rework in construction contracts is an interesting topic as it influences contractual claims and disputes. Changes in design, work scope, and construction turn into rework and affect the contract sum, the project completion date and project performance. Thus, clear responsibility to manage rework is essential for construction contracts. Contractual rework provisions are difficult to trace as they are written indirectly or in a complex context. A well-defined contract with clear responsibilities before the project commencement will safeguard the contract from unforeseen circumstances. In this study, the stipulated provisions related to the causes of rework are reviewed and analysed in New Zealand standard form of contract. The research uses a mixed quantitative and qualitative method for data collection and analysis. This paper collects a list of rework causes, assesses each rework cause in the general contract conditions, and explores relevant rework clauses of NZS3910 contract. The study revealed five significant causes of rework that have been addressed in the contract conditions. Further investigation into the reminder causes during contract negotiation enables contract parties to manage their obligations under rework events. Properly addressing the causes of rework in the contract conditions improves the overall project performance and reduces contractual claims and disputes.","PeriodicalId":51729,"journal":{"name":"Construction Economics and Building","volume":null,"pages":null},"PeriodicalIF":1.8000,"publicationDate":"2023-12-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Mixed-method approach to the evaluation of rework provisions within general contract conditions\",\"authors\":\"R. Asadi, Suzanne Wilkinson, J. Rotimi\",\"doi\":\"10.5130/ajceb.v23i3/4.8617\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Rework in construction contracts is an interesting topic as it influences contractual claims and disputes. Changes in design, work scope, and construction turn into rework and affect the contract sum, the project completion date and project performance. Thus, clear responsibility to manage rework is essential for construction contracts. Contractual rework provisions are difficult to trace as they are written indirectly or in a complex context. A well-defined contract with clear responsibilities before the project commencement will safeguard the contract from unforeseen circumstances. In this study, the stipulated provisions related to the causes of rework are reviewed and analysed in New Zealand standard form of contract. The research uses a mixed quantitative and qualitative method for data collection and analysis. This paper collects a list of rework causes, assesses each rework cause in the general contract conditions, and explores relevant rework clauses of NZS3910 contract. The study revealed five significant causes of rework that have been addressed in the contract conditions. Further investigation into the reminder causes during contract negotiation enables contract parties to manage their obligations under rework events. Properly addressing the causes of rework in the contract conditions improves the overall project performance and reduces contractual claims and disputes.\",\"PeriodicalId\":51729,\"journal\":{\"name\":\"Construction Economics and Building\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.8000,\"publicationDate\":\"2023-12-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Construction Economics and Building\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.5130/ajceb.v23i3/4.8617\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"MANAGEMENT\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Construction Economics and Building","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.5130/ajceb.v23i3/4.8617","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"MANAGEMENT","Score":null,"Total":0}
引用次数: 0

摘要

建筑合同中的返工是一个有趣的话题,因为它会影响合同索赔和纠纷。设计、工作范围和施工的变更会导致返工,并影响合同金额、项目竣工日期和项目绩效。因此,明确返工管理责任对建筑合同至关重要。合同中的返工条款很难追溯,因为它们都是间接写入或在复杂的背景下写入的。在项目开始之前,一份责任明确的合同将保障合同不受意外情况的影响。本研究对新西兰标准合同格式中与返工原因有关的规定进行了审查和分析。研究采用定量和定性相结合的方法进行数据收集和分析。本文收集了返工原因清单,评估了一般合同条件中的每种返工原因,并探讨了 NZS3910 合同中的相关返工条款。研究揭示了合同条件中已解决的五个重要返工原因。在合同谈判过程中对提醒原因的进一步调查使合同各方能够管理其在返工事件中的义务。在合同条件中正确处理造成返工的原因,可以提高整个项目的绩效,减少合同索赔和纠纷。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Mixed-method approach to the evaluation of rework provisions within general contract conditions
Rework in construction contracts is an interesting topic as it influences contractual claims and disputes. Changes in design, work scope, and construction turn into rework and affect the contract sum, the project completion date and project performance. Thus, clear responsibility to manage rework is essential for construction contracts. Contractual rework provisions are difficult to trace as they are written indirectly or in a complex context. A well-defined contract with clear responsibilities before the project commencement will safeguard the contract from unforeseen circumstances. In this study, the stipulated provisions related to the causes of rework are reviewed and analysed in New Zealand standard form of contract. The research uses a mixed quantitative and qualitative method for data collection and analysis. This paper collects a list of rework causes, assesses each rework cause in the general contract conditions, and explores relevant rework clauses of NZS3910 contract. The study revealed five significant causes of rework that have been addressed in the contract conditions. Further investigation into the reminder causes during contract negotiation enables contract parties to manage their obligations under rework events. Properly addressing the causes of rework in the contract conditions improves the overall project performance and reduces contractual claims and disputes.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
3.80
自引率
6.20%
发文量
0
审稿时长
20 weeks
期刊介绍: Construction Economics and Building (formerly known as the Australasian Journal of Construction Economics and Building [AJCEB]) is a peer reviewed, open access publication for original research into all aspects of the economics and management of building and construction, quantity surveying and property management as well as construction and property education. It is free for authors, readers and libraries.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信