困扰巴基斯坦信德省建筑施工项目的项目成本和时间关键因素:大流行病后的方法

IF 1.1 Q3 ENGINEERING, CIVIL
Haseeb Haleem, N. Y. Zainun, S. Khahro
{"title":"困扰巴基斯坦信德省建筑施工项目的项目成本和时间关键因素:大流行病后的方法","authors":"Haseeb Haleem, N. Y. Zainun, S. Khahro","doi":"10.24425/ace.2023.147678","DOIUrl":null,"url":null,"abstract":": The construction industry plays a major role in the boost of the country’s economy, providing basic facilities for residential and creating thousands of job opportunities. During COVID-19, the construction sectors in Sindh Pakistan was highly suffered and leading to delays in the completion of projects. As the construction sector was globally affected, building construction projects were also affected by completing the projects on estimated time and cost. Thus, this research investigates the significant factors of time and cost that affected the Hyderabad building construction projects during COVID-19 situation. Questionnaire surveys were designed to collect data from the employees working on building projects in Sindh Pakistan. The collected data was analyzed through the Average Index method. Unsafe working environment; shortage of workers; and increasing project cost was observed as significant factors that were highly affected during COVID-19. The results and findings shall be supportive for stakeholders to take into consideration of factors in the early stage of the expected pandemic situation. This research suggested that the stakeholders shall modify or amend the contract clause regarding for pandemic situation and incorporate the identified factors in the contract that should be considered by stakeholders to save the time and cost of the projects.","PeriodicalId":45753,"journal":{"name":"Archives of Civil Engineering","volume":null,"pages":null},"PeriodicalIF":1.1000,"publicationDate":"2023-12-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Project cost and time key factors distressing building construction projects of Sindh Pakistan: a post-pandemic approach\",\"authors\":\"Haseeb Haleem, N. Y. Zainun, S. Khahro\",\"doi\":\"10.24425/ace.2023.147678\",\"DOIUrl\":null,\"url\":null,\"abstract\":\": The construction industry plays a major role in the boost of the country’s economy, providing basic facilities for residential and creating thousands of job opportunities. During COVID-19, the construction sectors in Sindh Pakistan was highly suffered and leading to delays in the completion of projects. As the construction sector was globally affected, building construction projects were also affected by completing the projects on estimated time and cost. Thus, this research investigates the significant factors of time and cost that affected the Hyderabad building construction projects during COVID-19 situation. Questionnaire surveys were designed to collect data from the employees working on building projects in Sindh Pakistan. The collected data was analyzed through the Average Index method. Unsafe working environment; shortage of workers; and increasing project cost was observed as significant factors that were highly affected during COVID-19. The results and findings shall be supportive for stakeholders to take into consideration of factors in the early stage of the expected pandemic situation. This research suggested that the stakeholders shall modify or amend the contract clause regarding for pandemic situation and incorporate the identified factors in the contract that should be considered by stakeholders to save the time and cost of the projects.\",\"PeriodicalId\":45753,\"journal\":{\"name\":\"Archives of Civil Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.1000,\"publicationDate\":\"2023-12-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Archives of Civil Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.24425/ace.2023.147678\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, CIVIL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Archives of Civil Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24425/ace.2023.147678","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, CIVIL","Score":null,"Total":0}
引用次数: 0

摘要

:建筑业在促进国家经济、为居民提供基本设施和创造数以千计的就业机会方面发挥着重要作用。在 COVID-19 期间,巴基斯坦信德省的建筑行业受到严重影响,导致项目延期完工。由于建筑行业在全球范围内受到影响,建筑施工项目也受到影响,无法按预计时间和成本完成项目。因此,本研究调查了 COVID-19 期间影响海得拉巴建筑施工项目的重要时间和成本因素。研究设计了问卷调查,以收集巴基斯坦信德省建筑项目员工的数据。收集到的数据通过平均指数法进行了分析。在 COVID-19 期间,不安全的工作环境、工人短缺和项目成本增加被认为是受影响较大的重要因素。研究结果和发现将有助于利益相关者在预期大流行情况的早期阶段考虑到这些因素。本研究建议利益相关方修改或修订有关大流行病的合同条款,并将利益相关方应考虑的因素纳入合同中,以节省项目的时间和成本。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Project cost and time key factors distressing building construction projects of Sindh Pakistan: a post-pandemic approach
: The construction industry plays a major role in the boost of the country’s economy, providing basic facilities for residential and creating thousands of job opportunities. During COVID-19, the construction sectors in Sindh Pakistan was highly suffered and leading to delays in the completion of projects. As the construction sector was globally affected, building construction projects were also affected by completing the projects on estimated time and cost. Thus, this research investigates the significant factors of time and cost that affected the Hyderabad building construction projects during COVID-19 situation. Questionnaire surveys were designed to collect data from the employees working on building projects in Sindh Pakistan. The collected data was analyzed through the Average Index method. Unsafe working environment; shortage of workers; and increasing project cost was observed as significant factors that were highly affected during COVID-19. The results and findings shall be supportive for stakeholders to take into consideration of factors in the early stage of the expected pandemic situation. This research suggested that the stakeholders shall modify or amend the contract clause regarding for pandemic situation and incorporate the identified factors in the contract that should be considered by stakeholders to save the time and cost of the projects.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Archives of Civil Engineering
Archives of Civil Engineering ENGINEERING, CIVIL-
CiteScore
1.50
自引率
28.60%
发文量
0
审稿时长
24 weeks
期刊介绍: ARCHIVES OF CIVIL ENGINEERING publish original papers of the theoretical, experimental, numerical and practical nature in the fields of structural mechanics, soil mechanics and foundations engineering, concrete, metal, timber and composite polymer structures, hydrotechnical structures, roads, railways and bridges, building services, building physics, management in construction, production of construction materials, construction of civil engineering structures, education of civil engineers.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信