发电机互联、网络扩展和能源转型

Jacob Mays
{"title":"发电机互联、网络扩展和能源转型","authors":"Jacob Mays","doi":"10.1109/TEMPR.2023.3274227","DOIUrl":null,"url":null,"abstract":"Inefficient coordination between decentralized generation investment and centralized transmission planning is a significant barrier to achieving rapid decarbonization in liberalized electricity markets. While the optimal configuration of the transmission grid depends on the relative social costs of competing technologies, existing processes have not led to transmission expansion consistent with declines in the cost of wind and solar combined with increased estimates of the social costs of traditional thermal resources. This paper describes the negative feedback loop preventing efficient interconnection of new resources in U.S. markets, its connection to conceptual flaws in current resource adequacy constructs, and the ways in which it protects incumbent generators. To help resolve these issues, the paper recommends a shift to a “connect and manage” approach and outlines a straw proposal for a new financial right connected with transmission service. From a generator perspective, the effect of the proposed reforms is to trade highly uncertain network upgrade and congestion costs for a fixed interconnection fee. From a transmission planning perspective, the goal is to improve the quality of information about new generation included in forward-looking planning processes. Simulation on a stylized two-node system demonstrates the potential of the approach to facilitate a transition to clean technologies.","PeriodicalId":100639,"journal":{"name":"IEEE Transactions on Energy Markets, Policy and Regulation","volume":"1 4","pages":"410-419"},"PeriodicalIF":0.0000,"publicationDate":"2023-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Generator Interconnection, Network Expansion, and Energy Transition\",\"authors\":\"Jacob Mays\",\"doi\":\"10.1109/TEMPR.2023.3274227\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Inefficient coordination between decentralized generation investment and centralized transmission planning is a significant barrier to achieving rapid decarbonization in liberalized electricity markets. While the optimal configuration of the transmission grid depends on the relative social costs of competing technologies, existing processes have not led to transmission expansion consistent with declines in the cost of wind and solar combined with increased estimates of the social costs of traditional thermal resources. This paper describes the negative feedback loop preventing efficient interconnection of new resources in U.S. markets, its connection to conceptual flaws in current resource adequacy constructs, and the ways in which it protects incumbent generators. To help resolve these issues, the paper recommends a shift to a “connect and manage” approach and outlines a straw proposal for a new financial right connected with transmission service. From a generator perspective, the effect of the proposed reforms is to trade highly uncertain network upgrade and congestion costs for a fixed interconnection fee. From a transmission planning perspective, the goal is to improve the quality of information about new generation included in forward-looking planning processes. Simulation on a stylized two-node system demonstrates the potential of the approach to facilitate a transition to clean technologies.\",\"PeriodicalId\":100639,\"journal\":{\"name\":\"IEEE Transactions on Energy Markets, Policy and Regulation\",\"volume\":\"1 4\",\"pages\":\"410-419\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE Transactions on Energy Markets, Policy and Regulation\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://ieeexplore.ieee.org/document/10121623/\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Transactions on Energy Markets, Policy and Regulation","FirstCategoryId":"1085","ListUrlMain":"https://ieeexplore.ieee.org/document/10121623/","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

分散式发电投资和集中式输电规划之间的低效协调是实现自由化电力市场快速脱碳的重要障碍。虽然输电网的最佳配置取决于竞争技术的相对社会成本,但现有的过程并没有导致与风能和太阳能成本下降相一致的输电扩张,同时增加了传统热资源的社会成本估计。本文描述了阻碍美国市场新资源有效互联的负反馈回路,它与当前资源充足性结构中的概念缺陷的联系,以及它保护现有发电商的方式。为了帮助解决这些问题,本文建议转向“连接和管理”的方法,并概述了与输电服务相关的新金融权的初步建议。从发电商的角度来看,拟议改革的效果是用高度不确定的网络升级和拥塞成本换取固定的互联费用。从输电规划的角度来看,目标是提高前瞻性规划过程中有关新一代信息的质量。在一个程式化的双节点系统上进行仿真,证明了该方法促进向清洁技术过渡的潜力。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Generator Interconnection, Network Expansion, and Energy Transition
Inefficient coordination between decentralized generation investment and centralized transmission planning is a significant barrier to achieving rapid decarbonization in liberalized electricity markets. While the optimal configuration of the transmission grid depends on the relative social costs of competing technologies, existing processes have not led to transmission expansion consistent with declines in the cost of wind and solar combined with increased estimates of the social costs of traditional thermal resources. This paper describes the negative feedback loop preventing efficient interconnection of new resources in U.S. markets, its connection to conceptual flaws in current resource adequacy constructs, and the ways in which it protects incumbent generators. To help resolve these issues, the paper recommends a shift to a “connect and manage” approach and outlines a straw proposal for a new financial right connected with transmission service. From a generator perspective, the effect of the proposed reforms is to trade highly uncertain network upgrade and congestion costs for a fixed interconnection fee. From a transmission planning perspective, the goal is to improve the quality of information about new generation included in forward-looking planning processes. Simulation on a stylized two-node system demonstrates the potential of the approach to facilitate a transition to clean technologies.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信