利用石川图表确定假设优先次序的案例研究

IF 1.4 Q4 ENGINEERING, INDUSTRIAL
Matthew Barsalou
{"title":"利用石川图表确定假设优先次序的案例研究","authors":"Matthew Barsalou","doi":"10.2478/mspe-2023-0042","DOIUrl":null,"url":null,"abstract":"Abstract The objective of this paper is to explore a multidisciplinary problem-solving team investigating a customer-reported failure using an Ishikawa diagram with a spreadsheet for prioritizing and tracking investigation actions in a manufacturing organization. A case study methodology is used with the actions taken to investigate a customer-reported failure explained. The highest priority failure hypothesis was found to be unrelated to the failure. Two medium-rated hypotheses were found to be causing the problem; leakage was occurring at the connection between two components due to a diameter deviation of one of the components. Identifying and prioritizing hypotheses from the Ishikawa diagram provided structure to the investigation and gave the investigation team leader a tool for tracking the investigation actions. This approach is suitable for all types of failure investigations in which an Ishikawa diagram is used to list hypotheses.","PeriodicalId":44097,"journal":{"name":"Management Systems in Production Engineering","volume":null,"pages":null},"PeriodicalIF":1.4000,"publicationDate":"2023-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Case Study in Hypothesis Prioritization with Ishikawa Diagrams\",\"authors\":\"Matthew Barsalou\",\"doi\":\"10.2478/mspe-2023-0042\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The objective of this paper is to explore a multidisciplinary problem-solving team investigating a customer-reported failure using an Ishikawa diagram with a spreadsheet for prioritizing and tracking investigation actions in a manufacturing organization. A case study methodology is used with the actions taken to investigate a customer-reported failure explained. The highest priority failure hypothesis was found to be unrelated to the failure. Two medium-rated hypotheses were found to be causing the problem; leakage was occurring at the connection between two components due to a diameter deviation of one of the components. Identifying and prioritizing hypotheses from the Ishikawa diagram provided structure to the investigation and gave the investigation team leader a tool for tracking the investigation actions. This approach is suitable for all types of failure investigations in which an Ishikawa diagram is used to list hypotheses.\",\"PeriodicalId\":44097,\"journal\":{\"name\":\"Management Systems in Production Engineering\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":1.4000,\"publicationDate\":\"2023-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Management Systems in Production Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2478/mspe-2023-0042\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENGINEERING, INDUSTRIAL\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Management Systems in Production Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2478/mspe-2023-0042","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENGINEERING, INDUSTRIAL","Score":null,"Total":0}
引用次数: 0

摘要

摘要本文的目的是探索一个多学科问题解决团队,使用石川图和电子表格来调查客户报告的故障,以便在制造组织中优先考虑和跟踪调查行动。案例研究方法用于调查客户报告的故障所采取的行动。发现最高优先级失效假设与失效无关。两个中等等级的假设被发现导致了这个问题;由于其中一个组件的直径偏差,两个组件之间的连接处发生泄漏。从Ishikawa图中识别和优先考虑假设为调查提供了结构,并为调查小组负责人提供了跟踪调查行动的工具。这种方法适用于使用石川图列出假设的所有类型的失效调查。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Case Study in Hypothesis Prioritization with Ishikawa Diagrams
Abstract The objective of this paper is to explore a multidisciplinary problem-solving team investigating a customer-reported failure using an Ishikawa diagram with a spreadsheet for prioritizing and tracking investigation actions in a manufacturing organization. A case study methodology is used with the actions taken to investigate a customer-reported failure explained. The highest priority failure hypothesis was found to be unrelated to the failure. Two medium-rated hypotheses were found to be causing the problem; leakage was occurring at the connection between two components due to a diameter deviation of one of the components. Identifying and prioritizing hypotheses from the Ishikawa diagram provided structure to the investigation and gave the investigation team leader a tool for tracking the investigation actions. This approach is suitable for all types of failure investigations in which an Ishikawa diagram is used to list hypotheses.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
4.30
自引率
13.30%
发文量
48
审稿时长
10 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信