Hardi S. Fathullah, Hirsh M. Majid, Chro H. Ahmed, Sulleyman H. Sourkan, Karzan S. Ismael, Balen Z. Abdulsamad
{"title":"椭圆环形交叉路口的交通流通效率","authors":"Hardi S. Fathullah, Hirsh M. Majid, Chro H. Ahmed, Sulleyman H. Sourkan, Karzan S. Ismael, Balen Z. Abdulsamad","doi":"10.14500/aro.11150","DOIUrl":null,"url":null,"abstract":"This paper investigates the impact of geometry of central island of roundabout on operational performance in terms of delay and capacity measures. A roundabout with an elliptical central island having major and minor axes of 63 and 44m respectively was selected as a case study. Using SIDRA Intersection software two simulation models are developed while considering two geometric shapes of central island; one with an elliptical shape and the other with a circular shape. The peak traffic volume of each approach was assigned to both models as a preliminary simulation then twelve scenarios were generated by assigning identical lane volumes starting from a value that gave level of service A and increasing gradually to level of service F. In each scenario 100% of the volume assigned to an approach while the other was assigned with 75% of it and this process was reversed for every run. The results revealed that at high degree of saturation, the elliptical roundabout generally possessed a higher performance especially in term of delay and capacity compared to the circular roundabout. Furthermore, a parametric study was carried out through running eight more simulation scenarios to examine the impacts of heavy vehicle percentage (HV%) on the roundabout operational performance. The (HV %) started from 2% and increased to 12% with alternate approach virtual volume, and the results showed that performance of the elliptical roundabout was higher than the circular roundabout. However it was more susceptible to increase of HV% in term of control delay and capacity.","PeriodicalId":8665,"journal":{"name":"ARO. The Scientific Journal of Koya University","volume":"89 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Traffic Circulation Efficiency of Elliptical Roundabouts\",\"authors\":\"Hardi S. Fathullah, Hirsh M. Majid, Chro H. Ahmed, Sulleyman H. Sourkan, Karzan S. Ismael, Balen Z. Abdulsamad\",\"doi\":\"10.14500/aro.11150\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper investigates the impact of geometry of central island of roundabout on operational performance in terms of delay and capacity measures. A roundabout with an elliptical central island having major and minor axes of 63 and 44m respectively was selected as a case study. Using SIDRA Intersection software two simulation models are developed while considering two geometric shapes of central island; one with an elliptical shape and the other with a circular shape. The peak traffic volume of each approach was assigned to both models as a preliminary simulation then twelve scenarios were generated by assigning identical lane volumes starting from a value that gave level of service A and increasing gradually to level of service F. In each scenario 100% of the volume assigned to an approach while the other was assigned with 75% of it and this process was reversed for every run. The results revealed that at high degree of saturation, the elliptical roundabout generally possessed a higher performance especially in term of delay and capacity compared to the circular roundabout. Furthermore, a parametric study was carried out through running eight more simulation scenarios to examine the impacts of heavy vehicle percentage (HV%) on the roundabout operational performance. The (HV %) started from 2% and increased to 12% with alternate approach virtual volume, and the results showed that performance of the elliptical roundabout was higher than the circular roundabout. However it was more susceptible to increase of HV% in term of control delay and capacity.\",\"PeriodicalId\":8665,\"journal\":{\"name\":\"ARO. The Scientific Journal of Koya University\",\"volume\":\"89 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-09-20\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"ARO. The Scientific Journal of Koya University\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.14500/aro.11150\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"ARO. The Scientific Journal of Koya University","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14500/aro.11150","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Traffic Circulation Efficiency of Elliptical Roundabouts
This paper investigates the impact of geometry of central island of roundabout on operational performance in terms of delay and capacity measures. A roundabout with an elliptical central island having major and minor axes of 63 and 44m respectively was selected as a case study. Using SIDRA Intersection software two simulation models are developed while considering two geometric shapes of central island; one with an elliptical shape and the other with a circular shape. The peak traffic volume of each approach was assigned to both models as a preliminary simulation then twelve scenarios were generated by assigning identical lane volumes starting from a value that gave level of service A and increasing gradually to level of service F. In each scenario 100% of the volume assigned to an approach while the other was assigned with 75% of it and this process was reversed for every run. The results revealed that at high degree of saturation, the elliptical roundabout generally possessed a higher performance especially in term of delay and capacity compared to the circular roundabout. Furthermore, a parametric study was carried out through running eight more simulation scenarios to examine the impacts of heavy vehicle percentage (HV%) on the roundabout operational performance. The (HV %) started from 2% and increased to 12% with alternate approach virtual volume, and the results showed that performance of the elliptical roundabout was higher than the circular roundabout. However it was more susceptible to increase of HV% in term of control delay and capacity.