能源效率和二次采收率:厄瓜多尔某成熟油田的两种管理选择

IF 0.1 Q4 ENERGY & FUELS
Diego Roberto Ayala-Trujillo, Wilson Leonardo Padilla-Erazo, Silvia Alexandra Ayala-Trujillo, Gustavo Raúl Pinto-Arteaga
{"title":"能源效率和二次采收率:厄瓜多尔某成熟油田的两种管理选择","authors":"Diego Roberto Ayala-Trujillo, Wilson Leonardo Padilla-Erazo, Silvia Alexandra Ayala-Trujillo, Gustavo Raúl Pinto-Arteaga","doi":"10.18273/revfue.v21n2-2023002","DOIUrl":null,"url":null,"abstract":"Strategies focused on solving the drawbacks of a mature field must consider production decline, which is paramount when considering future investments to maintain the field’s competitiveness and profitability. B49 is an oil field with the typical problems of a mature field, management aimed at increasing the recovery factor and the implementation of an energy efficiency model were the axes to reduce OPEX and achieve a barrel with a production cost of 5.20 USD. The main objective of waterflooding in the field is to maximize oil recovery. Formation water from the north and south zones of B49 is used in waterflooding which increased the recovery factor from 21% to 26%. In Ecuador, the associated gas is not fully exploited. For this reason, its flaring is an accepted practice; however, since 2009 the Ecuadorian State Oil Company has been implementing an ambitious Energy Efficiency program called Optimization of Electricity Generation and Energy Efficiency (OGE&EE for its acronym in Spanish), which is a comprehensive development of generation, distribution and transmission of electricity, as well as the development of facilities for the collection and transportation of associated gas. OGE&EE consists of a group of projects, covering an area of 25,000 km2, 17 oil blocks, 56 oil fields and more than 66 facilities, to date the program results are: • Installation of multiple generation plants with a combined capacity of 325MW, 95MW and can use associated gas as fuel. • 200 km of electric energy transmission and distribution facilities. • Installation of 17 km of gas pipelines out of a total of 100 km, upgrading of existing facilities by implementing waste heat recovery. • The OGE&EE Program has also interconnected the oil industry’s power grid to the national grid, which helps optimize national renewable energy (hydropower). In 2015 the Ecuadorian oil company joined the World Bank initiative “Zero Routine Flaring by 2030”, the Government of Ecuador also joined this initiative in 2018, and as part of PAM EP’s Energy Efficiency program since 2015 it has been working to develop projects and financial solutions to increase power generation with associated gas and decrease gas flaring facilities (flare gas). The production of 12 wells is used for electricity generation, the daily energy demand is an average of 3MW (72 MWh per day). B49’s electricity generation meets the efficiency objectives by using gas in high efficiency generators to cover 100% of the energy needs; the field uses 194 MMcf of gas per year, stops emitting 20 MTon CO2 eq/KWH and saves 420 M USD/year for unconsumed diesel. Problems such as pressure depletion in producing sands, water injection, BSW increase, gas availability, gas flaring limitation, pressure maintenance facilities and gas distribution are issues addressed in this research.","PeriodicalId":41949,"journal":{"name":"Fuentes el Reventon Energetico","volume":"75 1","pages":"0"},"PeriodicalIF":0.1000,"publicationDate":"2023-08-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ENERGY EFFICIENCY AND SECONDARY RECOVERY: TWO MANAGEMENT OPTIONS FOR A MATURE FIELD IN ECUADOR\",\"authors\":\"Diego Roberto Ayala-Trujillo, Wilson Leonardo Padilla-Erazo, Silvia Alexandra Ayala-Trujillo, Gustavo Raúl Pinto-Arteaga\",\"doi\":\"10.18273/revfue.v21n2-2023002\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Strategies focused on solving the drawbacks of a mature field must consider production decline, which is paramount when considering future investments to maintain the field’s competitiveness and profitability. B49 is an oil field with the typical problems of a mature field, management aimed at increasing the recovery factor and the implementation of an energy efficiency model were the axes to reduce OPEX and achieve a barrel with a production cost of 5.20 USD. The main objective of waterflooding in the field is to maximize oil recovery. Formation water from the north and south zones of B49 is used in waterflooding which increased the recovery factor from 21% to 26%. In Ecuador, the associated gas is not fully exploited. For this reason, its flaring is an accepted practice; however, since 2009 the Ecuadorian State Oil Company has been implementing an ambitious Energy Efficiency program called Optimization of Electricity Generation and Energy Efficiency (OGE&EE for its acronym in Spanish), which is a comprehensive development of generation, distribution and transmission of electricity, as well as the development of facilities for the collection and transportation of associated gas. OGE&EE consists of a group of projects, covering an area of 25,000 km2, 17 oil blocks, 56 oil fields and more than 66 facilities, to date the program results are: • Installation of multiple generation plants with a combined capacity of 325MW, 95MW and can use associated gas as fuel. • 200 km of electric energy transmission and distribution facilities. • Installation of 17 km of gas pipelines out of a total of 100 km, upgrading of existing facilities by implementing waste heat recovery. • The OGE&EE Program has also interconnected the oil industry’s power grid to the national grid, which helps optimize national renewable energy (hydropower). In 2015 the Ecuadorian oil company joined the World Bank initiative “Zero Routine Flaring by 2030”, the Government of Ecuador also joined this initiative in 2018, and as part of PAM EP’s Energy Efficiency program since 2015 it has been working to develop projects and financial solutions to increase power generation with associated gas and decrease gas flaring facilities (flare gas). The production of 12 wells is used for electricity generation, the daily energy demand is an average of 3MW (72 MWh per day). B49’s electricity generation meets the efficiency objectives by using gas in high efficiency generators to cover 100% of the energy needs; the field uses 194 MMcf of gas per year, stops emitting 20 MTon CO2 eq/KWH and saves 420 M USD/year for unconsumed diesel. Problems such as pressure depletion in producing sands, water injection, BSW increase, gas availability, gas flaring limitation, pressure maintenance facilities and gas distribution are issues addressed in this research.\",\"PeriodicalId\":41949,\"journal\":{\"name\":\"Fuentes el Reventon Energetico\",\"volume\":\"75 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.1000,\"publicationDate\":\"2023-08-29\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Fuentes el Reventon Energetico\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.18273/revfue.v21n2-2023002\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"ENERGY & FUELS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Fuentes el Reventon Energetico","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.18273/revfue.v21n2-2023002","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"ENERGY & FUELS","Score":null,"Total":0}
引用次数: 0

摘要

专注于解决成熟油田缺点的策略必须考虑到产量下降,这在考虑未来投资以保持油田的竞争力和盈利能力时至关重要。B49油田存在成熟油田的典型问题,以提高采收率为目标的管理和能效模型的实施为轴心,降低运营成本,实现每桶5.20美元的生产成本。油田注水的主要目的是提高采收率。利用B49北部和南部的地层水进行注水,使采收率从21%提高到26%。在厄瓜多尔,伴生气还没有完全开采。出于这个原因,它的燃除是一种公认的做法;然而,自2009年以来,厄瓜多尔国家石油公司一直在实施一项雄心勃勃的能源效率计划,名为“发电和能源效率优化”(OGE&EE为西班牙语首字母缩略词),该计划是对发电、配电和输电的全面发展,以及对伴生气体收集和运输设施的发展。OGE&EE由一组项目组成,覆盖面积25,000平方公里,17个石油区块,56个油田和超过66个设施,迄今为止的项目成果是:•安装多个发电厂,总容量为325MW, 95MW,可使用伴生气作为燃料。•200公里的电力输配电设施。•在总长100公里的天然气管道中安装17公里,通过实施废热回收来升级现有设施。•OGE&EE计划还将石油行业的电网与国家电网连接起来,这有助于优化国家可再生能源(水电)。2015年,厄瓜多尔石油公司加入了世界银行“到2030年零常规燃烧”倡议,厄瓜多尔政府也于2018年加入了该倡议,自2015年以来,作为PAM EP能源效率计划的一部分,厄瓜多尔石油公司一直致力于开发项目和金融解决方案,以增加伴生气发电,减少天然气燃烧设施(火炬气)。12口井的产量用于发电,每天的能源需求平均为3MW(每天72兆瓦时)。B49的发电达到效率目标,在高效率发电机中使用气体,以满足100%的能源需求;该油田每年使用1.94亿立方英尺的天然气,停止排放2000万吨二氧化碳当量/千瓦时,每年节省4.2亿美元的未消耗柴油。本研究解决的问题包括出砂压力枯竭、注水、BSW增加、天然气可用性、天然气燃除限制、压力维护设施和天然气分布。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ENERGY EFFICIENCY AND SECONDARY RECOVERY: TWO MANAGEMENT OPTIONS FOR A MATURE FIELD IN ECUADOR
Strategies focused on solving the drawbacks of a mature field must consider production decline, which is paramount when considering future investments to maintain the field’s competitiveness and profitability. B49 is an oil field with the typical problems of a mature field, management aimed at increasing the recovery factor and the implementation of an energy efficiency model were the axes to reduce OPEX and achieve a barrel with a production cost of 5.20 USD. The main objective of waterflooding in the field is to maximize oil recovery. Formation water from the north and south zones of B49 is used in waterflooding which increased the recovery factor from 21% to 26%. In Ecuador, the associated gas is not fully exploited. For this reason, its flaring is an accepted practice; however, since 2009 the Ecuadorian State Oil Company has been implementing an ambitious Energy Efficiency program called Optimization of Electricity Generation and Energy Efficiency (OGE&EE for its acronym in Spanish), which is a comprehensive development of generation, distribution and transmission of electricity, as well as the development of facilities for the collection and transportation of associated gas. OGE&EE consists of a group of projects, covering an area of 25,000 km2, 17 oil blocks, 56 oil fields and more than 66 facilities, to date the program results are: • Installation of multiple generation plants with a combined capacity of 325MW, 95MW and can use associated gas as fuel. • 200 km of electric energy transmission and distribution facilities. • Installation of 17 km of gas pipelines out of a total of 100 km, upgrading of existing facilities by implementing waste heat recovery. • The OGE&EE Program has also interconnected the oil industry’s power grid to the national grid, which helps optimize national renewable energy (hydropower). In 2015 the Ecuadorian oil company joined the World Bank initiative “Zero Routine Flaring by 2030”, the Government of Ecuador also joined this initiative in 2018, and as part of PAM EP’s Energy Efficiency program since 2015 it has been working to develop projects and financial solutions to increase power generation with associated gas and decrease gas flaring facilities (flare gas). The production of 12 wells is used for electricity generation, the daily energy demand is an average of 3MW (72 MWh per day). B49’s electricity generation meets the efficiency objectives by using gas in high efficiency generators to cover 100% of the energy needs; the field uses 194 MMcf of gas per year, stops emitting 20 MTon CO2 eq/KWH and saves 420 M USD/year for unconsumed diesel. Problems such as pressure depletion in producing sands, water injection, BSW increase, gas availability, gas flaring limitation, pressure maintenance facilities and gas distribution are issues addressed in this research.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
0.80
自引率
0.00%
发文量
7
审稿时长
15 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信