基于机器学习方法的泵站预站水位预测

Weilin Wang, Gouqing Sang, Qiang Zhao, Longbin Lu
{"title":"基于机器学习方法的泵站预站水位预测","authors":"Weilin Wang, Gouqing Sang, Qiang Zhao, Longbin Lu","doi":"10.2166/ws.2023.242","DOIUrl":null,"url":null,"abstract":"Abstract Water level prediction is an essential factor for the safe operation of pumping stations. However, due to the complex nonlinear relationship between the water level of the front pool of the pumping station and the influencing factors, the prediction of the water level is still inaccurate and untimely. Backpropagation (BP) neural network, improved particle swarm optimization-BP neural network (PSO-BP), support vector machine regression (SVR), and improved PSO-SVR were used to construct 4-h and 8-h ahead prediction models for pumping station prestation water levels. Mean absolute error, mean squared error (MSE), root mean square error (RMSE), mean absolute percentage error (MAPE), and R correlation coefficient were used as prediction evaluation metrics. This method is applied in the Baliwan Pumping Station, the highest pumping station in the South-to-North Water Diversion Eastern Route Project (SNWDERP). The results showed that the MSE, RMSE, and MAPE of the improved PSO-BP model were smaller than other models, whereas the R correlation coefficient was larger, confirming its high prediction accuracy. All models had higher prediction accuracy 4 h ahead than 8 h ahead. Combining the time-phased water level prediction method and hybrid machine learning can enhance the water level prediction accuracy of a pumping station pre-station.","PeriodicalId":23573,"journal":{"name":"Water Science & Technology: Water Supply","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-09-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Water level prediction of pumping station pre-station based on machine learning methods\",\"authors\":\"Weilin Wang, Gouqing Sang, Qiang Zhao, Longbin Lu\",\"doi\":\"10.2166/ws.2023.242\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract Water level prediction is an essential factor for the safe operation of pumping stations. However, due to the complex nonlinear relationship between the water level of the front pool of the pumping station and the influencing factors, the prediction of the water level is still inaccurate and untimely. Backpropagation (BP) neural network, improved particle swarm optimization-BP neural network (PSO-BP), support vector machine regression (SVR), and improved PSO-SVR were used to construct 4-h and 8-h ahead prediction models for pumping station prestation water levels. Mean absolute error, mean squared error (MSE), root mean square error (RMSE), mean absolute percentage error (MAPE), and R correlation coefficient were used as prediction evaluation metrics. This method is applied in the Baliwan Pumping Station, the highest pumping station in the South-to-North Water Diversion Eastern Route Project (SNWDERP). The results showed that the MSE, RMSE, and MAPE of the improved PSO-BP model were smaller than other models, whereas the R correlation coefficient was larger, confirming its high prediction accuracy. All models had higher prediction accuracy 4 h ahead than 8 h ahead. Combining the time-phased water level prediction method and hybrid machine learning can enhance the water level prediction accuracy of a pumping station pre-station.\",\"PeriodicalId\":23573,\"journal\":{\"name\":\"Water Science & Technology: Water Supply\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-09-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Water Science & Technology: Water Supply\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2166/ws.2023.242\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Water Science & Technology: Water Supply","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2166/ws.2023.242","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

摘要水位预测是影响泵站安全运行的重要因素。然而,由于泵站前池水位与影响因素之间存在复杂的非线性关系,水位预测仍然不准确、不及时。采用反向传播(BP)神经网络、改进粒子群优化-BP神经网络(PSO-BP)、支持向量机回归(SVR)和改进PSO-SVR分别构建泵站预水位4 h和8 h预测模型。以平均绝对误差、均方误差(MSE)、均方根误差(RMSE)、平均绝对百分比误差(MAPE)和R相关系数作为预测评价指标。该方法应用于南水北调东线工程最高泵站——八里湾泵站。结果表明,改进的PSO-BP模型的MSE、RMSE和MAPE均小于其他模型,而R相关系数较大,证实了其较高的预测精度。4 h预测精度高于8 h预测精度。将时间相水位预测方法与混合机器学习相结合,可以提高泵站预站水位预测的精度。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Water level prediction of pumping station pre-station based on machine learning methods
Abstract Water level prediction is an essential factor for the safe operation of pumping stations. However, due to the complex nonlinear relationship between the water level of the front pool of the pumping station and the influencing factors, the prediction of the water level is still inaccurate and untimely. Backpropagation (BP) neural network, improved particle swarm optimization-BP neural network (PSO-BP), support vector machine regression (SVR), and improved PSO-SVR were used to construct 4-h and 8-h ahead prediction models for pumping station prestation water levels. Mean absolute error, mean squared error (MSE), root mean square error (RMSE), mean absolute percentage error (MAPE), and R correlation coefficient were used as prediction evaluation metrics. This method is applied in the Baliwan Pumping Station, the highest pumping station in the South-to-North Water Diversion Eastern Route Project (SNWDERP). The results showed that the MSE, RMSE, and MAPE of the improved PSO-BP model were smaller than other models, whereas the R correlation coefficient was larger, confirming its high prediction accuracy. All models had higher prediction accuracy 4 h ahead than 8 h ahead. Combining the time-phased water level prediction method and hybrid machine learning can enhance the water level prediction accuracy of a pumping station pre-station.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信