小型水电站系统(pltm)输电性能分析 taluda'a 村 bone bolango 区

Abdul Rahim, Burhan Liputo, Romi Djafar, Yunita Djamalu
{"title":"小型水电站系统(pltm)输电性能分析 taluda'a 村 bone bolango 区","authors":"Abdul Rahim, Burhan Liputo, Romi Djafar, Yunita Djamalu","doi":"10.56190/jree.v1i2.22","DOIUrl":null,"url":null,"abstract":"The Mini Hydro Power Plant (PLTM) is an electricity facility located in Ilohuuwa Village, Bone District, Bone Bolango Regency, Gorontalo Province, using the irrigation channels of the Taludaa River and the Iya River. In the working area of ​​PT. PLN (Persero) Sultenggo Region, Gorontalo Branch. PLTM Taludaa Unit I always plans its operating system to obtain maximum electricity production according to targets every year. However, every generator will generally experience many problems with airflow and components that hinder the process of using electrical energy so that it can grow. The analysis results show that the transmission used is a shaft that is 3M long, and the post weighs 83 kg. The shaft is the transmission link from the turbine to the generator. Then, with the flywheel, it is just balancing the rotation or (Balancing) with a flywheel weight of 76 kg and the moment of inertia that is considered. It is 121.60kg/m2. Then, with the bearing resistance, the bearing life has been calculated based on the load and rotation speed. The greater the load and rotation speed, the smaller the bearing life. The results obtained are 14.5457 working hours, 6060 per day, 119 per month, and 16.6 per year, so it defines the bearing life as being able to last 16.6 years. The turbine efficiency result is 0.94, calculated using the data specifications in the Taluda'a PLTM or (MANUAL BOOK). Then, the results obtained by KW every day depend on the air flow entering the turbine. Calculated using specifications, it can produce 991.2 Kw per 1 unit. Meanwhile, the Taluda'a PLTM uses two teams, so the Kwh made is 991.2 Kw x2, calculated using the Taluda'a PLTM specification data. Evaluation of the average net capacity from 2022 to 2023 experiences an increase and decrease in Kwh produced due to the rainy and dry seasons.","PeriodicalId":484355,"journal":{"name":"Journal Of Renewable Energy Engineering","volume":"43 8","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-10-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ANALISIS KINERJA TRANSMISI SISTEM PEMBANGKIT LISTRIK TENAGA MINI HIDRO (PLTM) DESA TALUDA’A KABUPATEN BONE BOLANGO\",\"authors\":\"Abdul Rahim, Burhan Liputo, Romi Djafar, Yunita Djamalu\",\"doi\":\"10.56190/jree.v1i2.22\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Mini Hydro Power Plant (PLTM) is an electricity facility located in Ilohuuwa Village, Bone District, Bone Bolango Regency, Gorontalo Province, using the irrigation channels of the Taludaa River and the Iya River. In the working area of ​​PT. PLN (Persero) Sultenggo Region, Gorontalo Branch. PLTM Taludaa Unit I always plans its operating system to obtain maximum electricity production according to targets every year. However, every generator will generally experience many problems with airflow and components that hinder the process of using electrical energy so that it can grow. The analysis results show that the transmission used is a shaft that is 3M long, and the post weighs 83 kg. The shaft is the transmission link from the turbine to the generator. Then, with the flywheel, it is just balancing the rotation or (Balancing) with a flywheel weight of 76 kg and the moment of inertia that is considered. It is 121.60kg/m2. Then, with the bearing resistance, the bearing life has been calculated based on the load and rotation speed. The greater the load and rotation speed, the smaller the bearing life. The results obtained are 14.5457 working hours, 6060 per day, 119 per month, and 16.6 per year, so it defines the bearing life as being able to last 16.6 years. The turbine efficiency result is 0.94, calculated using the data specifications in the Taluda'a PLTM or (MANUAL BOOK). Then, the results obtained by KW every day depend on the air flow entering the turbine. Calculated using specifications, it can produce 991.2 Kw per 1 unit. Meanwhile, the Taluda'a PLTM uses two teams, so the Kwh made is 991.2 Kw x2, calculated using the Taluda'a PLTM specification data. Evaluation of the average net capacity from 2022 to 2023 experiences an increase and decrease in Kwh produced due to the rainy and dry seasons.\",\"PeriodicalId\":484355,\"journal\":{\"name\":\"Journal Of Renewable Energy Engineering\",\"volume\":\"43 8\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-10-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal Of Renewable Energy Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.56190/jree.v1i2.22\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal Of Renewable Energy Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.56190/jree.v1i2.22","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

迷你水力发电厂(PLTM)是位于戈龙塔洛省Bone Bolango县Bone区Ilohuuwa村的一个电力设施,利用Taludaa河和Iya河的灌溉渠道。在PT的工作区域。人民解放军(Persero)苏尔腾戈地区,哥伦塔洛分部。PLTM Taludaa机组1总是根据每年的目标对其运行系统进行规划,以获得最大的发电量。然而,每个发电机通常都会遇到气流和组件的许多问题,这些问题阻碍了使用电能的过程,从而使其能够生长。分析结果表明,采用的传动装置为长3M的轴,桩重83 kg。轴是从涡轮机到发电机的传动环节。然后,与飞轮,它只是平衡旋转或(平衡)与飞轮重量为76公斤,并考虑转动惯量。为121.60kg/m2。然后,随着轴承阻力,根据负载和转速计算轴承寿命。载荷和转速越大,轴承寿命越小。得到的结果是14.5457工作小时,每天6060,每月119,每年16.6,因此它定义轴承寿命为能够持续16.6年。涡轮效率结果为0.94,使用Taluda'a PLTM或(MANUAL BOOK)中的数据规范计算。然后,每天以KW计算的结果取决于进入涡轮的空气流量。按规格计算,每台可发电991.2千瓦。同时,Taluda’a PLTM采用了两个团队,因此生产的千瓦时为991.2 Kw x2,使用Taluda’a PLTM规格数据计算。对2022年至2023年平均净容量的评估表明,由于雨季和旱季,Kwh发电量会增加或减少。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ANALISIS KINERJA TRANSMISI SISTEM PEMBANGKIT LISTRIK TENAGA MINI HIDRO (PLTM) DESA TALUDA’A KABUPATEN BONE BOLANGO
The Mini Hydro Power Plant (PLTM) is an electricity facility located in Ilohuuwa Village, Bone District, Bone Bolango Regency, Gorontalo Province, using the irrigation channels of the Taludaa River and the Iya River. In the working area of ​​PT. PLN (Persero) Sultenggo Region, Gorontalo Branch. PLTM Taludaa Unit I always plans its operating system to obtain maximum electricity production according to targets every year. However, every generator will generally experience many problems with airflow and components that hinder the process of using electrical energy so that it can grow. The analysis results show that the transmission used is a shaft that is 3M long, and the post weighs 83 kg. The shaft is the transmission link from the turbine to the generator. Then, with the flywheel, it is just balancing the rotation or (Balancing) with a flywheel weight of 76 kg and the moment of inertia that is considered. It is 121.60kg/m2. Then, with the bearing resistance, the bearing life has been calculated based on the load and rotation speed. The greater the load and rotation speed, the smaller the bearing life. The results obtained are 14.5457 working hours, 6060 per day, 119 per month, and 16.6 per year, so it defines the bearing life as being able to last 16.6 years. The turbine efficiency result is 0.94, calculated using the data specifications in the Taluda'a PLTM or (MANUAL BOOK). Then, the results obtained by KW every day depend on the air flow entering the turbine. Calculated using specifications, it can produce 991.2 Kw per 1 unit. Meanwhile, the Taluda'a PLTM uses two teams, so the Kwh made is 991.2 Kw x2, calculated using the Taluda'a PLTM specification data. Evaluation of the average net capacity from 2022 to 2023 experiences an increase and decrease in Kwh produced due to the rainy and dry seasons.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信