收费公路工程中挖填量提取的建筑信息模型实现

Astuti Fahmilia, Wisnu Isvara
{"title":"收费公路工程中挖填量提取的建筑信息模型实现","authors":"Astuti Fahmilia, Wisnu Isvara","doi":"10.59141/jiss.v4i08.856","DOIUrl":null,"url":null,"abstract":"Technology has been going rapidly through the years, and BIM is one of the massive developments that offer some benefits for the construction industry. BIM is widely used in building project and has started to be used in infrastructure projects such as toll roads. In a toll road project, cut and fill is one of the massive volumes, which consume a lot of time to calculate the quantity and has a high chance to human error. This research aims to determine the implementation of BIM in cut and fill quantity take-off in Toll Road Project. The methodology for this research is qualitative descriptive with in-depth interviews with the expert. The study shows that implementing quantity take-off with BIM increases accuracy, reduces time, minimizes human error and efficiency. Nevertheless, still have some lacks, such as expensive cost for siftware, hardware and training, needs a long time adaptation to the organization, and also need collaboration all of the stakeholder to succesfuly implement BIM","PeriodicalId":500768,"journal":{"name":"Jurnal Indonesia Sosial Sains","volume":"129 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-08-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The Implementation of Building Information Modelling for Cut and Fill Quantity Takeoff in Toll Road Project\",\"authors\":\"Astuti Fahmilia, Wisnu Isvara\",\"doi\":\"10.59141/jiss.v4i08.856\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Technology has been going rapidly through the years, and BIM is one of the massive developments that offer some benefits for the construction industry. BIM is widely used in building project and has started to be used in infrastructure projects such as toll roads. In a toll road project, cut and fill is one of the massive volumes, which consume a lot of time to calculate the quantity and has a high chance to human error. This research aims to determine the implementation of BIM in cut and fill quantity take-off in Toll Road Project. The methodology for this research is qualitative descriptive with in-depth interviews with the expert. The study shows that implementing quantity take-off with BIM increases accuracy, reduces time, minimizes human error and efficiency. Nevertheless, still have some lacks, such as expensive cost for siftware, hardware and training, needs a long time adaptation to the organization, and also need collaboration all of the stakeholder to succesfuly implement BIM\",\"PeriodicalId\":500768,\"journal\":{\"name\":\"Jurnal Indonesia Sosial Sains\",\"volume\":\"129 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-08-05\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal Indonesia Sosial Sains\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.59141/jiss.v4i08.856\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Indonesia Sosial Sains","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.59141/jiss.v4i08.856","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

这些年来,技术一直在快速发展,BIM是为建筑行业带来一些好处的巨大发展之一。BIM在建筑工程中的应用非常广泛,已经开始在收费公路等基础设施项目中应用。在收费公路工程中,切填工程是工程量较大的工程之一,需要耗费大量的时间来计算工程量,而且容易出现人为错误。本研究旨在确定BIM在收费公路工程中采填量起飞的实施情况。本研究的方法是定性描述与深入访谈的专家。研究表明,利用BIM实施数量起飞提高了准确性,减少了时间,最大限度地减少了人为错误和效率。然而,也存在一些不足,比如软件、硬件和培训成本昂贵,需要很长时间适应组织,还需要所有利益相关者的协作才能成功实施BIM
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The Implementation of Building Information Modelling for Cut and Fill Quantity Takeoff in Toll Road Project
Technology has been going rapidly through the years, and BIM is one of the massive developments that offer some benefits for the construction industry. BIM is widely used in building project and has started to be used in infrastructure projects such as toll roads. In a toll road project, cut and fill is one of the massive volumes, which consume a lot of time to calculate the quantity and has a high chance to human error. This research aims to determine the implementation of BIM in cut and fill quantity take-off in Toll Road Project. The methodology for this research is qualitative descriptive with in-depth interviews with the expert. The study shows that implementing quantity take-off with BIM increases accuracy, reduces time, minimizes human error and efficiency. Nevertheless, still have some lacks, such as expensive cost for siftware, hardware and training, needs a long time adaptation to the organization, and also need collaboration all of the stakeholder to succesfuly implement BIM
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信