{"title":"煤矿掘进机机器使用时间评价:回归与人工神经网络分析","authors":"Sair KAHRAMAN, Masoud ROSTAMİ, Behnaz DİBAVAR","doi":"10.30797/madencilik.1310876","DOIUrl":null,"url":null,"abstract":"Roadheaders are extensively utilized for tunnel heading rock engineering applications all over the world. To create a work plan and calculate costs, it is critical to forecast roadheader performance as precisely as possible. Machine utilization time (MUT) is required for the calculation of daily advance rate of roadheaders. This paper investigates the values of MUT for roadheaders used in underground coal mines. The performance measurements were conducted on fifty different locations for axial machines and thirty-nine different locations for transverse machines. MUT values vary from 15 % to 37.5 % with an average of 26.3 % for axial roadheaders, and vary from 6.9 % to 37.9 % with an average of 18.4 % for transvers roadheaders. The average MUT is 25.4% for all measurements. The percentage of average support time approximately equals to the average MUT. Multiple regression and artificial neural network models were also developed for estimating MUT. Concluding remark is that the determined MUT values and the derived estimation models for roadheaders will be very useful for coal miners.","PeriodicalId":37481,"journal":{"name":"Scientific Mining Journal","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-10-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Evaluating machine utilization times for roadheaders used in coal mines: Regression and artificial neural network analyses\",\"authors\":\"Sair KAHRAMAN, Masoud ROSTAMİ, Behnaz DİBAVAR\",\"doi\":\"10.30797/madencilik.1310876\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Roadheaders are extensively utilized for tunnel heading rock engineering applications all over the world. To create a work plan and calculate costs, it is critical to forecast roadheader performance as precisely as possible. Machine utilization time (MUT) is required for the calculation of daily advance rate of roadheaders. This paper investigates the values of MUT for roadheaders used in underground coal mines. The performance measurements were conducted on fifty different locations for axial machines and thirty-nine different locations for transverse machines. MUT values vary from 15 % to 37.5 % with an average of 26.3 % for axial roadheaders, and vary from 6.9 % to 37.9 % with an average of 18.4 % for transvers roadheaders. The average MUT is 25.4% for all measurements. The percentage of average support time approximately equals to the average MUT. Multiple regression and artificial neural network models were also developed for estimating MUT. Concluding remark is that the determined MUT values and the derived estimation models for roadheaders will be very useful for coal miners.\",\"PeriodicalId\":37481,\"journal\":{\"name\":\"Scientific Mining Journal\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-10-17\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Scientific Mining Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30797/madencilik.1310876\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Scientific Mining Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30797/madencilik.1310876","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

摘要

掘进机在世界范围内广泛应用于隧道掘进岩石工程。为了制定工作计划和计算成本,尽可能精确地预测掘进机的性能至关重要。计算掘进机的日进步率需要机器使用时间(MUT)。本文探讨了煤矿井下掘进机的MUT值。性能测量进行了50个不同位置的轴向机和39个不同位置的横向机。轴向掘进机的MUT值从15%到37.5%不等,平均为26.3%;横向掘进机的MUT值从6.9%到37.9%不等,平均为18.4%。所有测量的平均MUT为25.4%。平均支持时间的百分比大约等于平均MUT。此外,还建立了多元回归模型和人工神经网络模型来估计MUT。总而言之,确定的掘进机MUT值和导出的估计模型对煤矿工人是非常有用的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Evaluating machine utilization times for roadheaders used in coal mines: Regression and artificial neural network analyses
Roadheaders are extensively utilized for tunnel heading rock engineering applications all over the world. To create a work plan and calculate costs, it is critical to forecast roadheader performance as precisely as possible. Machine utilization time (MUT) is required for the calculation of daily advance rate of roadheaders. This paper investigates the values of MUT for roadheaders used in underground coal mines. The performance measurements were conducted on fifty different locations for axial machines and thirty-nine different locations for transverse machines. MUT values vary from 15 % to 37.5 % with an average of 26.3 % for axial roadheaders, and vary from 6.9 % to 37.9 % with an average of 18.4 % for transvers roadheaders. The average MUT is 25.4% for all measurements. The percentage of average support time approximately equals to the average MUT. Multiple regression and artificial neural network models were also developed for estimating MUT. Concluding remark is that the determined MUT values and the derived estimation models for roadheaders will be very useful for coal miners.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Scientific Mining Journal
Scientific Mining Journal Engineering-Industrial and Manufacturing Engineering
CiteScore
0.60
自引率
0.00%
发文量
7
期刊介绍: Scientific Mining Journal, which is published i n open access electronic environment and i n printed, is a periodical scientific journal of Union of Chambers of Turkish Engineers and Architects Chamber of Mining Engineers. The name of the journal was "Mining" until June 2016 and it has been changed to "Scientific Mining Journal" since September 2016 because it can be confused with popular journals with similar names and the ISSN number has been updated from 0024-9416 to 2564-7024. Scientific Mining Journal, published four times a year (March-June-September-December), aims to disseminate original scientific studies which are conducted according to the scientific norms and publication ethics at national and international scale, to scientists, mining engineers, the public; and thus to share scientific knowledge with society. The journal is in both Turkish and English. The journal covers theoretical, experimental, and applied research articles, which reflects the findings and results of an original research i n the field of mining engineering; review articles, which assess, evaluates, and interprets the findings of a comprehensive review of sufficient number of scientific articles and summarize them at present information and technology level; technical notes, which may be defined as a short article that describes a novel methodology o r technique; a case studies, which are based on the theoretical o r real professional practice and involves systematic data collection and analysis.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信