关于改进 PT 光电技术工程产品和服务公司数控部门工作系统的建议

Roni Chandra Tampubolon, Elsya Paskaria Loyda Tarigan
{"title":"关于改进 PT 光电技术工程产品和服务公司数控部门工作系统的建议","authors":"Roni Chandra Tampubolon, Elsya Paskaria Loyda Tarigan","doi":"10.33884/comasiejournal.v9i2.7993","DOIUrl":null,"url":null,"abstract":"Competition between companies in the manufacture of increasingly strict industrial products, pt optimech engineering is still facing obstacles such as production time that does not meet the target.This restriction occurs due to the frequent occurrence of products that do not conform to the specifications because the equipment used for production has a low capacity and does not correspond to the quantity of production performed.The purpose of this research is to identify and provide proposals for repair of the work system so that it can eliminate waste found in the cnc department and know the changes that occur in the proposal for repair of the production process.Based on the waste assessment model (WAM), The defect is a percentage of 24.01%, and the waste defect also significantly affects the occurrence of other waste.From the results of the fishbone diagram summarized a number of possibilities which are considered to be the root of the problem, It is a basis for repair recommendations. Work system improvements can be done by accurately predicting and planning production in order to avoid overinventory and could harm the company, supplying employees with more insight into the work and handling of products, and do control for materials before being sent to the next process do the supply of machines according to the production capacity and complexity of products and machine repairs periodically, use or do machine purchases according to the body dimension the labor is owned and does things that can motivate employees to be able to work well.","PeriodicalId":500489,"journal":{"name":"Computer and Science Industrial Engineering (COMASIE)","volume":"70 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"USULAN PERBAIKAN SISTEM KERJA PADA DEPARTEMEN CNC DI PT OPTIMECH ENGINEERING PRODUCT AND SERVICES\",\"authors\":\"Roni Chandra Tampubolon, Elsya Paskaria Loyda Tarigan\",\"doi\":\"10.33884/comasiejournal.v9i2.7993\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Competition between companies in the manufacture of increasingly strict industrial products, pt optimech engineering is still facing obstacles such as production time that does not meet the target.This restriction occurs due to the frequent occurrence of products that do not conform to the specifications because the equipment used for production has a low capacity and does not correspond to the quantity of production performed.The purpose of this research is to identify and provide proposals for repair of the work system so that it can eliminate waste found in the cnc department and know the changes that occur in the proposal for repair of the production process.Based on the waste assessment model (WAM), The defect is a percentage of 24.01%, and the waste defect also significantly affects the occurrence of other waste.From the results of the fishbone diagram summarized a number of possibilities which are considered to be the root of the problem, It is a basis for repair recommendations. Work system improvements can be done by accurately predicting and planning production in order to avoid overinventory and could harm the company, supplying employees with more insight into the work and handling of products, and do control for materials before being sent to the next process do the supply of machines according to the production capacity and complexity of products and machine repairs periodically, use or do machine purchases according to the body dimension the labor is owned and does things that can motivate employees to be able to work well.\",\"PeriodicalId\":500489,\"journal\":{\"name\":\"Computer and Science Industrial Engineering (COMASIE)\",\"volume\":\"70 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-09-11\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Computer and Science Industrial Engineering (COMASIE)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.33884/comasiejournal.v9i2.7993\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Computer and Science Industrial Engineering (COMASIE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33884/comasiejournal.v9i2.7993","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

企业之间在制造工业产品的竞争日趋严格,但优化工程仍面临着生产时间达不到目标等障碍。这种限制的发生是由于经常发生不符合规格的产品,因为用于生产的设备容量低,与生产的数量不相对应。本研究的目的是识别并提供工作系统的修复建议,以便消除cnc部门发现的浪费,并了解生产过程修复建议中发生的变化。基于废物评估模型(WAM),缺陷的百分比为24.01%,并且废物缺陷也显著影响其他废物的发生。从鱼骨图的结果中总结出一些可能性,认为这些可能是问题的根源,这是提出修复建议的依据。工作系统的改进可以通过准确的预测和计划生产来完成,以避免库存过剩和可能损害公司,为员工提供更深入的了解产品的工作和处理,并在材料发送到下一个过程之前进行控制,根据产品的生产能力和复杂程度提供机器,并定期维修机器。根据身体尺寸使用或做机器采购,劳动拥有,做一些能激励员工能够很好地工作的事情。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
USULAN PERBAIKAN SISTEM KERJA PADA DEPARTEMEN CNC DI PT OPTIMECH ENGINEERING PRODUCT AND SERVICES
Competition between companies in the manufacture of increasingly strict industrial products, pt optimech engineering is still facing obstacles such as production time that does not meet the target.This restriction occurs due to the frequent occurrence of products that do not conform to the specifications because the equipment used for production has a low capacity and does not correspond to the quantity of production performed.The purpose of this research is to identify and provide proposals for repair of the work system so that it can eliminate waste found in the cnc department and know the changes that occur in the proposal for repair of the production process.Based on the waste assessment model (WAM), The defect is a percentage of 24.01%, and the waste defect also significantly affects the occurrence of other waste.From the results of the fishbone diagram summarized a number of possibilities which are considered to be the root of the problem, It is a basis for repair recommendations. Work system improvements can be done by accurately predicting and planning production in order to avoid overinventory and could harm the company, supplying employees with more insight into the work and handling of products, and do control for materials before being sent to the next process do the supply of machines according to the production capacity and complexity of products and machine repairs periodically, use or do machine purchases according to the body dimension the labor is owned and does things that can motivate employees to be able to work well.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信