绿色建筑背景下基于NSGA-II算法的工程项目多目标优化模型构建

Q1 Decision Sciences
Fushun Zhang
{"title":"绿色建筑背景下基于NSGA-II算法的工程项目多目标优化模型构建","authors":"Fushun Zhang","doi":"10.31181/dmame712024895","DOIUrl":null,"url":null,"abstract":"In the context of Sustainability Development (SD), Green Construction (GC) has become a key direction for optimizing engineering project objectives. In order to improve the management ability of project engineering in GC, an improved NSGA - II algorithm was used in this study to establish a multi-optimization model for engineering projects. In this process, the hill climbing is introduced to improve the search ability of NSGA - Ⅱ algorithm. Finally, a Multi-Objective Optimization (MOP) model with strong convergence and distribution was obtained. In subsequent validation experiments, the total construction period of the engineering project MOP model based on the improved NSGA - II algorithm was between 190 and 234days. The total cost ranges from 171,473 to 20,461,800 yuan. Its total mass ranges from 90.41% to 92.19%. Its total safety is between 91.30% and 99.32%. The total environment is between 144.54 and 193.58. Its total resources range from 86.21% to 99.91%. The cost of improving the NSGA-II algorithm is 500300 yuan lower than that of the NSGA-II algorithm, with a resource target increase of 0.4% and an environmental target increase of 4.33%. The iteration curves of the improved NSGA - II algorithm in terms of duration, cost, and environmental objective function are lower than those of the NSGA - II algorithm. Overall, the improved NSGA - II algorithm has better MOP performance, can obtain better Pareto solutions, and has better performance.","PeriodicalId":32695,"journal":{"name":"Decision Making Applications in Management and Engineering","volume":"122 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-11-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Constructing a Multi-Objective Optimization Model for Engineering Projects Based on NSGA-II Algorithm under the Background of Green Construction\",\"authors\":\"Fushun Zhang\",\"doi\":\"10.31181/dmame712024895\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the context of Sustainability Development (SD), Green Construction (GC) has become a key direction for optimizing engineering project objectives. In order to improve the management ability of project engineering in GC, an improved NSGA - II algorithm was used in this study to establish a multi-optimization model for engineering projects. In this process, the hill climbing is introduced to improve the search ability of NSGA - Ⅱ algorithm. Finally, a Multi-Objective Optimization (MOP) model with strong convergence and distribution was obtained. In subsequent validation experiments, the total construction period of the engineering project MOP model based on the improved NSGA - II algorithm was between 190 and 234days. The total cost ranges from 171,473 to 20,461,800 yuan. Its total mass ranges from 90.41% to 92.19%. Its total safety is between 91.30% and 99.32%. The total environment is between 144.54 and 193.58. Its total resources range from 86.21% to 99.91%. The cost of improving the NSGA-II algorithm is 500300 yuan lower than that of the NSGA-II algorithm, with a resource target increase of 0.4% and an environmental target increase of 4.33%. The iteration curves of the improved NSGA - II algorithm in terms of duration, cost, and environmental objective function are lower than those of the NSGA - II algorithm. Overall, the improved NSGA - II algorithm has better MOP performance, can obtain better Pareto solutions, and has better performance.\",\"PeriodicalId\":32695,\"journal\":{\"name\":\"Decision Making Applications in Management and Engineering\",\"volume\":\"122 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-11-02\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Decision Making Applications in Management and Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31181/dmame712024895\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"Decision Sciences\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Decision Making Applications in Management and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31181/dmame712024895","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Decision Sciences","Score":null,"Total":0}
引用次数: 0

摘要

在可持续发展(SD)背景下,绿色建筑(GC)已成为优化工程项目目标的关键方向。为了提高GC项目工程的管理能力,本研究采用改进的NSGA - II算法,建立了工程项目的多优化模型。在此过程中,为了提高NSGA -Ⅱ算法的搜索能力,引入了爬坡的方法。最后,得到了一个具有强收敛性和强分布性的多目标优化模型。在随后的验证实验中,基于改进NSGA - II算法的工程项目MOP模型总工期在190 ~ 234天之间。总成本从171473元到20461800元不等。其总质量为90.41% ~ 92.19%。其总安全性在91.30% ~ 99.32%之间。总环境在144.54 ~ 193.58之间。其资源总量为86.21% ~ 99.91%。改进NSGA-II算法的成本比改进NSGA-II算法低500300元,资源目标提高0.4%,环境目标提高4.33%。改进的NSGA - II算法的迭代曲线在持续时间、代价和环境目标函数方面均低于NSGA - II算法。总体而言,改进的NSGA - II算法具有更好的MOP性能,可以获得更好的Pareto解,具有更好的性能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Constructing a Multi-Objective Optimization Model for Engineering Projects Based on NSGA-II Algorithm under the Background of Green Construction
In the context of Sustainability Development (SD), Green Construction (GC) has become a key direction for optimizing engineering project objectives. In order to improve the management ability of project engineering in GC, an improved NSGA - II algorithm was used in this study to establish a multi-optimization model for engineering projects. In this process, the hill climbing is introduced to improve the search ability of NSGA - Ⅱ algorithm. Finally, a Multi-Objective Optimization (MOP) model with strong convergence and distribution was obtained. In subsequent validation experiments, the total construction period of the engineering project MOP model based on the improved NSGA - II algorithm was between 190 and 234days. The total cost ranges from 171,473 to 20,461,800 yuan. Its total mass ranges from 90.41% to 92.19%. Its total safety is between 91.30% and 99.32%. The total environment is between 144.54 and 193.58. Its total resources range from 86.21% to 99.91%. The cost of improving the NSGA-II algorithm is 500300 yuan lower than that of the NSGA-II algorithm, with a resource target increase of 0.4% and an environmental target increase of 4.33%. The iteration curves of the improved NSGA - II algorithm in terms of duration, cost, and environmental objective function are lower than those of the NSGA - II algorithm. Overall, the improved NSGA - II algorithm has better MOP performance, can obtain better Pareto solutions, and has better performance.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Decision Making Applications in Management and Engineering
Decision Making Applications in Management and Engineering Decision Sciences-General Decision Sciences
CiteScore
14.40
自引率
0.00%
发文量
35
审稿时长
14 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信