{"title":"采矿设备静载荷对硬岩中台阶稳定性的影响","authors":"A.S. Kalyuzhny","doi":"10.30686/1609-9192-2023-3-116-121","DOIUrl":null,"url":null,"abstract":"Most of the enterprises applying open-pit mining method at deposits face challenges of pit wall steepening when approaching the pit wall to the final position or reducing productivity. The main task when increasing the angle of pit slope is to determine its stability. One of the ways to steepen the open-pit wall is to increase the slope angle of benches composing the open-pit wall. The bench stability is primarily determined by its physical properties and structural uncertainty. The higher the strength properties of rocks, the steeper the slope angle formed in these rocks can be. The \"Rules of stability...\" provide for the possible accounting the loads from mining equipment when assessing the stability, but this possibility is provided for the calculation of bench stability of open-pits and cuts, formed by semi-hard and dispersed rocks, dumps formed from clay or semi-hard rocks and (or) from a mixture of clay and hard rocks. At the same time, it is of interest to assess the impact of static loading from the located mining transport equipment in a stationary state on the stability of the benches located in hard rocks. It is shown that the load from the track dozer scraping the berms has an impact of no more than 6-7% for a distance of about 15 m from the top crest of a 30-meter long bench with a slope angle of 80° to the edge of the track, which is generally insignificant for maintaining bench stability. The minimum value of the safety factor of the bench with the load from the BELAZ-75306 mining dump truck is at a distance of 8 to 10 m from the top crest to the edge of the wheel. That is, at this distance the mining dump truck has the maximum impact. At 30 m distance from the bench’s top crest, mining dump truck has no impact on the bench stability. The maximum impact of the dump truck on the stability is 22 to 25%.","PeriodicalId":36119,"journal":{"name":"Gornaya Promyshlennost","volume":"117 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Impact of static loading from mining equipment on the bench stability in hard rocks\",\"authors\":\"A.S. Kalyuzhny\",\"doi\":\"10.30686/1609-9192-2023-3-116-121\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Most of the enterprises applying open-pit mining method at deposits face challenges of pit wall steepening when approaching the pit wall to the final position or reducing productivity. The main task when increasing the angle of pit slope is to determine its stability. One of the ways to steepen the open-pit wall is to increase the slope angle of benches composing the open-pit wall. The bench stability is primarily determined by its physical properties and structural uncertainty. The higher the strength properties of rocks, the steeper the slope angle formed in these rocks can be. The \\\"Rules of stability...\\\" provide for the possible accounting the loads from mining equipment when assessing the stability, but this possibility is provided for the calculation of bench stability of open-pits and cuts, formed by semi-hard and dispersed rocks, dumps formed from clay or semi-hard rocks and (or) from a mixture of clay and hard rocks. At the same time, it is of interest to assess the impact of static loading from the located mining transport equipment in a stationary state on the stability of the benches located in hard rocks. It is shown that the load from the track dozer scraping the berms has an impact of no more than 6-7% for a distance of about 15 m from the top crest of a 30-meter long bench with a slope angle of 80° to the edge of the track, which is generally insignificant for maintaining bench stability. The minimum value of the safety factor of the bench with the load from the BELAZ-75306 mining dump truck is at a distance of 8 to 10 m from the top crest to the edge of the wheel. That is, at this distance the mining dump truck has the maximum impact. At 30 m distance from the bench’s top crest, mining dump truck has no impact on the bench stability. The maximum impact of the dump truck on the stability is 22 to 25%.\",\"PeriodicalId\":36119,\"journal\":{\"name\":\"Gornaya Promyshlennost\",\"volume\":\"117 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Gornaya Promyshlennost\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30686/1609-9192-2023-3-116-121\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q4\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Gornaya Promyshlennost","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30686/1609-9192-2023-3-116-121","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q4","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

摘要

在矿床中采用露天开采方法的企业,大多面临着在接近最终位置时井壁变陡或产能下降的挑战。增加基坑边坡角度的主要任务是确定基坑边坡的稳定性。增加构成露天矿壁的台阶的坡度角是使露天矿壁变陡的方法之一。台架稳定性主要由其物理性质和结构不确定性决定。岩石的强度特性越高,其形成的坡角就越陡。“稳定性规则……”规定了在评估稳定性时可能考虑采矿设备的载荷,但这种可能性用于计算露天坑和切割的台阶稳定性,由半硬和分散的岩石形成,由粘土或半硬岩石形成的排土场和(或)由粘土和硬岩石的混合物形成。同时,研究在固定状态下的采矿运输设备的静载荷对位于坚硬岩石中的井架的稳定性的影响也是有意义的。结果表明,在30米长、坡度为80°的台架顶峰至轨道边缘约15 m范围内,轨道推土机刮擦护堤荷载的影响不超过6-7%,对台架稳定性的影响一般不显著。受BELAZ-75306矿用自卸车载荷的工作台,其安全系数的最小值出现在从顶峰到车轮边缘8 ~ 10 m处。也就是说,在这个距离上,矿用自卸车的冲击力最大。在距工作台顶峰30 m处,矿用自卸车对工作台稳定性无影响。自卸车对稳定性的最大影响为22 ~ 25%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Impact of static loading from mining equipment on the bench stability in hard rocks
Most of the enterprises applying open-pit mining method at deposits face challenges of pit wall steepening when approaching the pit wall to the final position or reducing productivity. The main task when increasing the angle of pit slope is to determine its stability. One of the ways to steepen the open-pit wall is to increase the slope angle of benches composing the open-pit wall. The bench stability is primarily determined by its physical properties and structural uncertainty. The higher the strength properties of rocks, the steeper the slope angle formed in these rocks can be. The "Rules of stability..." provide for the possible accounting the loads from mining equipment when assessing the stability, but this possibility is provided for the calculation of bench stability of open-pits and cuts, formed by semi-hard and dispersed rocks, dumps formed from clay or semi-hard rocks and (or) from a mixture of clay and hard rocks. At the same time, it is of interest to assess the impact of static loading from the located mining transport equipment in a stationary state on the stability of the benches located in hard rocks. It is shown that the load from the track dozer scraping the berms has an impact of no more than 6-7% for a distance of about 15 m from the top crest of a 30-meter long bench with a slope angle of 80° to the edge of the track, which is generally insignificant for maintaining bench stability. The minimum value of the safety factor of the bench with the load from the BELAZ-75306 mining dump truck is at a distance of 8 to 10 m from the top crest to the edge of the wheel. That is, at this distance the mining dump truck has the maximum impact. At 30 m distance from the bench’s top crest, mining dump truck has no impact on the bench stability. The maximum impact of the dump truck on the stability is 22 to 25%.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Gornaya Promyshlennost
Gornaya Promyshlennost Engineering-Industrial and Manufacturing Engineering
CiteScore
1.10
自引率
0.00%
发文量
100
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信