通过ISO 31000风险评估方法优化分包商的工作

{"title":"通过ISO 31000风险评估方法优化分包商的工作","authors":"","doi":"10.30534/ijatcse/2023/061252023","DOIUrl":null,"url":null,"abstract":"Every project has its own risks associated with it. The more complex the project, the higher risks embedded within the project. Whenever the risk is not identified and mitigated properly, it will disrupt the project implementation. The article takes case study of a state-owned energy company, XYZ, that build electricity transmission system around Indonesia area. The transmission project requires various expertise that involves using multiple contractors with their subcontractors. Using the chain of contractors/subcontractors is a common thing in transmission project, so the project owner should ensure all risks within the chain should be properly managed. The article proposes the use of ISO 31000 risk assessment method to identify and mitigate all possible risks that may disrupt the project. The use of ISO 31000 method enables to lower the risk of project achievements from 79.74% success rates to more than 90%. The outcome of the article is expected to be used as a reference for project owner of transmission projects in Indonesia to manage the risks associated with the use of chain contractors and subcontractors.","PeriodicalId":129636,"journal":{"name":"International Journal of Advanced Trends in Computer Science and Engineering","volume":"56 1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-10-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimizing Subcontractor Work through ISO 31000 Risk Assessment Method\",\"authors\":\"\",\"doi\":\"10.30534/ijatcse/2023/061252023\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Every project has its own risks associated with it. The more complex the project, the higher risks embedded within the project. Whenever the risk is not identified and mitigated properly, it will disrupt the project implementation. The article takes case study of a state-owned energy company, XYZ, that build electricity transmission system around Indonesia area. The transmission project requires various expertise that involves using multiple contractors with their subcontractors. Using the chain of contractors/subcontractors is a common thing in transmission project, so the project owner should ensure all risks within the chain should be properly managed. The article proposes the use of ISO 31000 risk assessment method to identify and mitigate all possible risks that may disrupt the project. The use of ISO 31000 method enables to lower the risk of project achievements from 79.74% success rates to more than 90%. The outcome of the article is expected to be used as a reference for project owner of transmission projects in Indonesia to manage the risks associated with the use of chain contractors and subcontractors.\",\"PeriodicalId\":129636,\"journal\":{\"name\":\"International Journal of Advanced Trends in Computer Science and Engineering\",\"volume\":\"56 1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-10-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Advanced Trends in Computer Science and Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30534/ijatcse/2023/061252023\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Advanced Trends in Computer Science and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30534/ijatcse/2023/061252023","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

每个项目都有自己的风险。项目越复杂,项目中嵌入的风险就越高。只要风险没有被正确地识别和减轻,它就会破坏项目的实施。本文以某国有能源公司XYZ为例,该公司在印尼周边地区建设输电系统。输电项目需要多种专业知识,包括使用多个承包商及其分包商。使用承包商/分包商链是输电工程中常见的事情,因此项目业主应确保对链内的所有风险进行妥善管理。本文建议使用ISO 31000风险评估方法来识别和减轻可能破坏项目的所有可能风险。使用ISO 31000方法可以将项目成功的风险从79.74%降低到90%以上。本文的研究结果有望作为印尼输电项目业主管理使用连锁承包商和分包商相关风险的参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Optimizing Subcontractor Work through ISO 31000 Risk Assessment Method
Every project has its own risks associated with it. The more complex the project, the higher risks embedded within the project. Whenever the risk is not identified and mitigated properly, it will disrupt the project implementation. The article takes case study of a state-owned energy company, XYZ, that build electricity transmission system around Indonesia area. The transmission project requires various expertise that involves using multiple contractors with their subcontractors. Using the chain of contractors/subcontractors is a common thing in transmission project, so the project owner should ensure all risks within the chain should be properly managed. The article proposes the use of ISO 31000 risk assessment method to identify and mitigate all possible risks that may disrupt the project. The use of ISO 31000 method enables to lower the risk of project achievements from 79.74% success rates to more than 90%. The outcome of the article is expected to be used as a reference for project owner of transmission projects in Indonesia to manage the risks associated with the use of chain contractors and subcontractors.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信