利用精益工具和质量工具减少汽车零件装配线的安装时间

Cátia Oliveira, Tânia M. Lima
{"title":"利用精益工具和质量工具减少汽车零件装配线的安装时间","authors":"Cátia Oliveira, Tânia M. Lima","doi":"10.3390/eng4030134","DOIUrl":null,"url":null,"abstract":"The business world is becoming more competitive. Therefore, it is crucial to increase the flexibility of production by decreasing the time used in the processes of preparing the production lines for new items’ production, reducing changeover and setup times. This paper presents a case study where the main goal is to reduce the setup time of welding robots. Single Minute Exchange of Die (SMED) was implemented, using other tools such as the Spaghetti Diagram, ERCS Analysis (Eliminate, Rearrange, Combine, Simplify), Gemba Walk, Standardized Work, Flowcharts, and Pareto Diagram. The setup time decreased by 36% in the welding robots studied, decreasing the motions by 43% during the changeover process and reducing the time from the categories: “transportation”, “main”, “other”, and “waiting”. In addition to SMED implementation, this study offers an integrated study of several Lean tools and Quality tools to achieve the maximum reduction of changeover and setup times.","PeriodicalId":10630,"journal":{"name":"Comput. Chem. Eng.","volume":"107 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Setup Time Reduction of an Automotive Parts Assembly Line Using Lean Tools and Quality Tools\",\"authors\":\"Cátia Oliveira, Tânia M. Lima\",\"doi\":\"10.3390/eng4030134\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The business world is becoming more competitive. Therefore, it is crucial to increase the flexibility of production by decreasing the time used in the processes of preparing the production lines for new items’ production, reducing changeover and setup times. This paper presents a case study where the main goal is to reduce the setup time of welding robots. Single Minute Exchange of Die (SMED) was implemented, using other tools such as the Spaghetti Diagram, ERCS Analysis (Eliminate, Rearrange, Combine, Simplify), Gemba Walk, Standardized Work, Flowcharts, and Pareto Diagram. The setup time decreased by 36% in the welding robots studied, decreasing the motions by 43% during the changeover process and reducing the time from the categories: “transportation”, “main”, “other”, and “waiting”. In addition to SMED implementation, this study offers an integrated study of several Lean tools and Quality tools to achieve the maximum reduction of changeover and setup times.\",\"PeriodicalId\":10630,\"journal\":{\"name\":\"Comput. Chem. Eng.\",\"volume\":\"107 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-09-13\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Comput. Chem. Eng.\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3390/eng4030134\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Comput. Chem. Eng.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3390/eng4030134","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

商业世界的竞争越来越激烈。因此,通过减少生产线准备新产品生产的时间、减少转换和安装时间来增加生产的灵活性至关重要。本文给出了一个案例研究,其主要目标是减少焊接机器人的设置时间。通过使用其他工具,如意大利面图、ERCS分析(消除、重新排列、组合、简化)、Gemba Walk、标准化工作、流程图和帕累托图,实现了单分钟换模(SMED)。所研究的焊接机器人的设置时间减少了36%,在转换过程中减少了43%的运动,并且减少了“运输”,“主要”,“其他”和“等待”类别的时间。除了SMED的实施,本研究还提供了几个精益工具和质量工具的综合研究,以最大限度地减少转换和设置时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Setup Time Reduction of an Automotive Parts Assembly Line Using Lean Tools and Quality Tools
The business world is becoming more competitive. Therefore, it is crucial to increase the flexibility of production by decreasing the time used in the processes of preparing the production lines for new items’ production, reducing changeover and setup times. This paper presents a case study where the main goal is to reduce the setup time of welding robots. Single Minute Exchange of Die (SMED) was implemented, using other tools such as the Spaghetti Diagram, ERCS Analysis (Eliminate, Rearrange, Combine, Simplify), Gemba Walk, Standardized Work, Flowcharts, and Pareto Diagram. The setup time decreased by 36% in the welding robots studied, decreasing the motions by 43% during the changeover process and reducing the time from the categories: “transportation”, “main”, “other”, and “waiting”. In addition to SMED implementation, this study offers an integrated study of several Lean tools and Quality tools to achieve the maximum reduction of changeover and setup times.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信