{"title":"S-DBR系统管理环境下提供交付承诺的支持方法分析","authors":"Isidoro Rays Filho, Fernando Bernardi de Souza, Lucas Martins Ikeziri","doi":"10.1590/0103-6513.20230023","DOIUrl":null,"url":null,"abstract":"Paper aims The objective of this paper is to investigate the effectiveness of a method, here denominated the due date promise by slack time rule (DDPSTR), to evaluate its feasibility and effectiveness for accepting urgent orders in make-to-order (MTO) environments managed by the Simplified Drum-Buffer-Rope (S-DBR) system. Originality Evaluating alternative methods for dealing with urgent orders in MTO environments managed and controlled by the S-DBR system is a subject that has received little attention from academia. This study contributes to the field of knowledge by identifying and comparing three alternatives. Research method To evaluate its feasibility and effectiveness, the DDPSTR was compared with variations of a method based on prior reserve capacity when dealing with regular and urgent orders. Computer simulation was used to model a theoretical production line that emulated the S-DBR system in different scenarios, using average delay and percentage of late orders as performance indicators. Main findings The DDPSTR method achieved optimal results for both indicators, enabling reliable delivery dates and, at the same time, flexibility in accepting urgent orders. Implications for theory and practice This work has verified the effectiveness of the DDPSTR method as a means of dealing with urgent orders without compromising the reliability of previously promised order deadlines. It has additionally proposed the means by which future research can evaluate adaptations, such as offering the shortest feasible delivery times to customers when those initially requested by them prove unworkable.","PeriodicalId":263089,"journal":{"name":"Production Journal","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of a support method for offering delivery promises in environments managed by S-DBR system\",\"authors\":\"Isidoro Rays Filho, Fernando Bernardi de Souza, Lucas Martins Ikeziri\",\"doi\":\"10.1590/0103-6513.20230023\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Paper aims The objective of this paper is to investigate the effectiveness of a method, here denominated the due date promise by slack time rule (DDPSTR), to evaluate its feasibility and effectiveness for accepting urgent orders in make-to-order (MTO) environments managed by the Simplified Drum-Buffer-Rope (S-DBR) system. Originality Evaluating alternative methods for dealing with urgent orders in MTO environments managed and controlled by the S-DBR system is a subject that has received little attention from academia. This study contributes to the field of knowledge by identifying and comparing three alternatives. Research method To evaluate its feasibility and effectiveness, the DDPSTR was compared with variations of a method based on prior reserve capacity when dealing with regular and urgent orders. Computer simulation was used to model a theoretical production line that emulated the S-DBR system in different scenarios, using average delay and percentage of late orders as performance indicators. Main findings The DDPSTR method achieved optimal results for both indicators, enabling reliable delivery dates and, at the same time, flexibility in accepting urgent orders. Implications for theory and practice This work has verified the effectiveness of the DDPSTR method as a means of dealing with urgent orders without compromising the reliability of previously promised order deadlines. It has additionally proposed the means by which future research can evaluate adaptations, such as offering the shortest feasible delivery times to customers when those initially requested by them prove unworkable.\",\"PeriodicalId\":263089,\"journal\":{\"name\":\"Production Journal\",\"volume\":\"9 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Production Journal\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1590/0103-6513.20230023\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Production Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1590/0103-6513.20230023","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文的目的是研究一种基于松弛时间规则的到期日承诺(DDPSTR)方法的有效性,以评估其在简化鼓-缓冲-绳索(S-DBR)系统管理的订单制造(MTO)环境中接受紧急订单的可行性和有效性。在由S-DBR系统管理和控制的MTO环境中,评估处理紧急订单的替代方法是学术界很少关注的课题。本研究通过识别和比较三种替代方案,为知识领域做出了贡献。研究方法为了评价DDPSTR方法在处理常规订单和紧急订单时的可行性和有效性,将其与基于先验储备容量的方法进行了比较。以平均延迟和延迟订单百分比为绩效指标,采用计算机仿真方法对一条理论生产线进行建模,模拟了S-DBR系统在不同场景下的运行情况。DDPSTR方法在两项指标上均取得了最佳结果,实现了可靠的交货日期,同时在接受紧急订单时具有灵活性。这项工作验证了DDPSTR方法作为处理紧急订单的一种手段的有效性,而不会损害先前承诺的订单截止日期的可靠性。它还提出了未来研究可以评估适应性的方法,例如,当客户最初提出的要求被证明是不可行的时候,向客户提供最短的可行交货时间。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of a support method for offering delivery promises in environments managed by S-DBR system
Paper aims The objective of this paper is to investigate the effectiveness of a method, here denominated the due date promise by slack time rule (DDPSTR), to evaluate its feasibility and effectiveness for accepting urgent orders in make-to-order (MTO) environments managed by the Simplified Drum-Buffer-Rope (S-DBR) system. Originality Evaluating alternative methods for dealing with urgent orders in MTO environments managed and controlled by the S-DBR system is a subject that has received little attention from academia. This study contributes to the field of knowledge by identifying and comparing three alternatives. Research method To evaluate its feasibility and effectiveness, the DDPSTR was compared with variations of a method based on prior reserve capacity when dealing with regular and urgent orders. Computer simulation was used to model a theoretical production line that emulated the S-DBR system in different scenarios, using average delay and percentage of late orders as performance indicators. Main findings The DDPSTR method achieved optimal results for both indicators, enabling reliable delivery dates and, at the same time, flexibility in accepting urgent orders. Implications for theory and practice This work has verified the effectiveness of the DDPSTR method as a means of dealing with urgent orders without compromising the reliability of previously promised order deadlines. It has additionally proposed the means by which future research can evaluate adaptations, such as offering the shortest feasible delivery times to customers when those initially requested by them prove unworkable.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信