评估生产物流领域的项目管理成熟度

А. Amangeldiyev, A. Yesmurzayeva, R. Bibassarova
{"title":"评估生产物流领域的项目管理成熟度","authors":"А. Amangeldiyev, A. Yesmurzayeva, R. Bibassarova","doi":"10.55452/1998-6688-2023-20-3-105-112","DOIUrl":null,"url":null,"abstract":"This study examines the practice of implementing project management standards in production logistics. The goal of the study is to evaluate the maturity level of PM at the company engaged in the field of production logistics. The research was conducted on the materials of the company \"Mehelektromontazh\" LLP for the period of 2020-2022 through the analysis of key performance indicators and data from interviews. The study employed comparative and statistical analysis to assess the company's position. Standards in the field of project management, such as PMBOK, ISO, P2M, SSPM, etc. were compared. Research methodology is based on using the OPM3 model which helped to evaluate the PM maturity in logistics company. According to the evaluation results, the most developed areas in LLP \"Mehelektromontazh\" are procurement and scheduling management (100%), cost management (90%), and human resources management (75%). The least utilized project practices in this company are content management (25%), stakeholders management (50%), senior management (60%), and integration management (55%). The analysis conducted allowed for the formulation of recommendations for the implementation of project management standards to optimize logistics in the company's production process.","PeriodicalId":473042,"journal":{"name":"Ķazaķstan-Britan tehnikalyķ universitetìnìņ habaršysy","volume":"33 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-10-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ASSESSING THE PROJECT MANAGEMENT MATURITY LEVEL IN THE PRODUCTION LOGISTICS FIELD\",\"authors\":\"А. Amangeldiyev, A. Yesmurzayeva, R. Bibassarova\",\"doi\":\"10.55452/1998-6688-2023-20-3-105-112\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This study examines the practice of implementing project management standards in production logistics. The goal of the study is to evaluate the maturity level of PM at the company engaged in the field of production logistics. The research was conducted on the materials of the company \\\"Mehelektromontazh\\\" LLP for the period of 2020-2022 through the analysis of key performance indicators and data from interviews. The study employed comparative and statistical analysis to assess the company's position. Standards in the field of project management, such as PMBOK, ISO, P2M, SSPM, etc. were compared. Research methodology is based on using the OPM3 model which helped to evaluate the PM maturity in logistics company. According to the evaluation results, the most developed areas in LLP \\\"Mehelektromontazh\\\" are procurement and scheduling management (100%), cost management (90%), and human resources management (75%). The least utilized project practices in this company are content management (25%), stakeholders management (50%), senior management (60%), and integration management (55%). The analysis conducted allowed for the formulation of recommendations for the implementation of project management standards to optimize logistics in the company's production process.\",\"PeriodicalId\":473042,\"journal\":{\"name\":\"Ķazaķstan-Britan tehnikalyķ universitetìnìņ habaršysy\",\"volume\":\"33 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-10-04\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Ķazaķstan-Britan tehnikalyķ universitetìnìņ habaršysy\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.55452/1998-6688-2023-20-3-105-112\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Ķazaķstan-Britan tehnikalyķ universitetìnìņ habaršysy","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55452/1998-6688-2023-20-3-105-112","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本研究考察了在生产物流中实施项目管理标准的实践。本研究的目的是评估从事生产物流领域的公司的项目管理成熟度。本研究以“Mehelektromontazh”LLP公司2020-2022年期间的材料为研究对象,通过分析关键绩效指标和访谈数据。本研究采用比较分析和统计分析来评估该公司的地位。比较了项目管理领域的标准,如PMBOK、ISO、P2M、SSPM等。研究方法基于OPM3模型,该模型有助于评估物流公司的项目管理成熟度。根据评价结果,“Mehelektromontazh”LLP最发达的领域是采购和调度管理(100%)、成本管理(90%)和人力资源管理(75%)。在这家公司中,利用最少的项目实践是内容管理(25%)、利益相关者管理(50%)、高级管理(60%)和集成管理(55%)。所进行的分析允许制定实施项目管理标准的建议,以优化公司生产过程中的物流。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ASSESSING THE PROJECT MANAGEMENT MATURITY LEVEL IN THE PRODUCTION LOGISTICS FIELD
This study examines the practice of implementing project management standards in production logistics. The goal of the study is to evaluate the maturity level of PM at the company engaged in the field of production logistics. The research was conducted on the materials of the company "Mehelektromontazh" LLP for the period of 2020-2022 through the analysis of key performance indicators and data from interviews. The study employed comparative and statistical analysis to assess the company's position. Standards in the field of project management, such as PMBOK, ISO, P2M, SSPM, etc. were compared. Research methodology is based on using the OPM3 model which helped to evaluate the PM maturity in logistics company. According to the evaluation results, the most developed areas in LLP "Mehelektromontazh" are procurement and scheduling management (100%), cost management (90%), and human resources management (75%). The least utilized project practices in this company are content management (25%), stakeholders management (50%), senior management (60%), and integration management (55%). The analysis conducted allowed for the formulation of recommendations for the implementation of project management standards to optimize logistics in the company's production process.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信