贫凝灰岩地层中特大跨高速铁路隧道施工方案研究与优化

IF 5.8 4区 工程技术 Q1 MECHANICS
Jianfei Ma, Shaohui He, Xiabing Liu, Jiaxin He
{"title":"贫凝灰岩地层中特大跨高速铁路隧道施工方案研究与优化","authors":"Jianfei Ma, Shaohui He, Xiabing Liu, Jiaxin He","doi":"10.1515/arh-2023-0101","DOIUrl":null,"url":null,"abstract":"Abstract The rapid traffic developments create demands for shallow four-line high-speed railway tunnels in weak soils, while construction technologies of such tunnels have yet to be reported. In this article, the construction schemes for a shallow four-line high-speed railway tunnel with a span of 26.3 m in weak tuff strata are investigated by numerical analysis and in-situ tests. First, 20 construction schemes of the shallow super-large span high-speed railway tunnel are proposed and simulated by the Finite Difference Method, including eight schemes for grade V rocks and 12 schemes for grades IV and III rocks. The mechanical response of grade V rock mass is simulated by the Bolt–Kelvin Mohr–Coulomb rheological model. The influence of construction method, rock grade, area, quantity, and excavation sequence of pilot tunnels on the rock deformation and the internal force of the primary support are comparatively explored. For further analysis, an 8 month field test was conducted to study the optimized effect of the construction scheme. Finally, a suggested construction method selection chart for super-large span tunnels in weak rocks (spans between 17 and 34 m) has been proposed. The research conclusion could provide a reference for building the super-large span tunnel in complex conditions.","PeriodicalId":50738,"journal":{"name":"Applied Rheology","volume":"12 1","pages":"0"},"PeriodicalIF":5.8000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research and optimization of tunnel construction scheme for super-large span high-speed railway tunnel in poor tuff strata\",\"authors\":\"Jianfei Ma, Shaohui He, Xiabing Liu, Jiaxin He\",\"doi\":\"10.1515/arh-2023-0101\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract The rapid traffic developments create demands for shallow four-line high-speed railway tunnels in weak soils, while construction technologies of such tunnels have yet to be reported. In this article, the construction schemes for a shallow four-line high-speed railway tunnel with a span of 26.3 m in weak tuff strata are investigated by numerical analysis and in-situ tests. First, 20 construction schemes of the shallow super-large span high-speed railway tunnel are proposed and simulated by the Finite Difference Method, including eight schemes for grade V rocks and 12 schemes for grades IV and III rocks. The mechanical response of grade V rock mass is simulated by the Bolt–Kelvin Mohr–Coulomb rheological model. The influence of construction method, rock grade, area, quantity, and excavation sequence of pilot tunnels on the rock deformation and the internal force of the primary support are comparatively explored. For further analysis, an 8 month field test was conducted to study the optimized effect of the construction scheme. Finally, a suggested construction method selection chart for super-large span tunnels in weak rocks (spans between 17 and 34 m) has been proposed. The research conclusion could provide a reference for building the super-large span tunnel in complex conditions.\",\"PeriodicalId\":50738,\"journal\":{\"name\":\"Applied Rheology\",\"volume\":\"12 1\",\"pages\":\"0\"},\"PeriodicalIF\":5.8000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Applied Rheology\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1515/arh-2023-0101\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"MECHANICS\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Applied Rheology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1515/arh-2023-0101","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"MECHANICS","Score":null,"Total":0}
引用次数: 0

摘要

摘要快速发展的交通对浅埋四线高速铁路隧道提出了需求,而浅埋四线高速铁路隧道的施工技术尚未见报道。本文采用数值分析和现场试验相结合的方法,对弱凝灰岩地层中跨度26.3 m的四线浅埋高速铁路隧道施工方案进行了研究。首先,采用有限差分法对高速铁路浅埋超大跨隧道的20种施工方案进行了数值模拟,其中V级围岩8种,IV、III级围岩12种。采用Bolt-Kelvin Mohr-Coulomb流变模型模拟了V级岩体的力学响应。比较探讨了施工方法、岩石等级、导洞面积、数量、开挖顺序等对岩石变形和主支护内力的影响。为了进一步分析,进行了为期8个月的现场试验,研究了施工方案的优化效果。最后,提出了软弱岩中(17 ~ 34 m)特大跨隧道的施工方法选择建议图。研究结论可为复杂条件下的超大跨度隧道施工提供参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Research and optimization of tunnel construction scheme for super-large span high-speed railway tunnel in poor tuff strata
Abstract The rapid traffic developments create demands for shallow four-line high-speed railway tunnels in weak soils, while construction technologies of such tunnels have yet to be reported. In this article, the construction schemes for a shallow four-line high-speed railway tunnel with a span of 26.3 m in weak tuff strata are investigated by numerical analysis and in-situ tests. First, 20 construction schemes of the shallow super-large span high-speed railway tunnel are proposed and simulated by the Finite Difference Method, including eight schemes for grade V rocks and 12 schemes for grades IV and III rocks. The mechanical response of grade V rock mass is simulated by the Bolt–Kelvin Mohr–Coulomb rheological model. The influence of construction method, rock grade, area, quantity, and excavation sequence of pilot tunnels on the rock deformation and the internal force of the primary support are comparatively explored. For further analysis, an 8 month field test was conducted to study the optimized effect of the construction scheme. Finally, a suggested construction method selection chart for super-large span tunnels in weak rocks (spans between 17 and 34 m) has been proposed. The research conclusion could provide a reference for building the super-large span tunnel in complex conditions.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Applied Rheology
Applied Rheology 物理-力学
CiteScore
3.00
自引率
5.60%
发文量
7
审稿时长
>12 weeks
期刊介绍: Applied Rheology is a peer-reviewed, open access, electronic journal devoted to the publication in the field of applied rheology. The journal provides the readers with free, instant, and permanent access to all content worldwide; and the authors with extensive promotion of published articles, long-time preservation, language-correction services, no space constraints and immediate publication.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信