基于失载概率指标的丹戎布玉竹林生物质发电厂可靠性分析

Muslimin Muslimin, Tantra Diwa Larasati, Agung Tandiminanga
{"title":"基于失载概率指标的丹戎布玉竹林生物质发电厂可靠性分析","authors":"Muslimin Muslimin, Tantra Diwa Larasati, Agung Tandiminanga","doi":"10.26418/elkha.v15i2.68481","DOIUrl":null,"url":null,"abstract":"The main function of a power generation system is to provide reliable electrical energy. This study aims to determine the reliability of Biomass Power Plants at PT. Tanjung Bayu Perkasa Plantation (PT. TBPP) in the years 2020, 2021, and 2022 using the Loss of Load Probability (LOLP) index calculation method. LOLP is a reliability index that indicates the possibility that the power plant cannot meet the demand. The LOLP of biomass power plants at PT. TBPP in 2020 amounted to 1.2769 days per year. However, the LOLP in 2020 does not comply with the standards set by the Republic of Indonesia Minister of Energy and Mineral Resources Decree in 2018. In contrast, in 2021, it was 0.53403 days per year, and in 2022, it was 0.41748 days per year, both of which meet the standards of the Republic of Indonesia Minister of Energy and Mineral Resources Decree in 2018. The LOLP is affected by the Forced Outage Rate (FOR) and demands exceeding the capacity. Based on the LOLP of biomass power plants at PT. TBPP in 2020, 2021, and 2022, it can be concluded that the reliability of biomass power plants at PT. TBPP is at a higher level of reliability compared to the micro-hydro power plant in Pantai Baru Pandasimo with a LOLP of 51.3627 days per year and the steam power plant at Pertamina EP Asset IV Field Sukowati with LOLP of 4.259535 days per year. The recommendation for future research is to explore ways better to optimize boiler operations in steam power plants at PT. TBPP.","PeriodicalId":32754,"journal":{"name":"Elkha Jurnal Teknik Elektro","volume":"66 11","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-10-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Reliability Analysis of Biomass Power Plant Using Loss of Load Probability Index at PT. Tanjung Buyu Perkasa Plantation\",\"authors\":\"Muslimin Muslimin, Tantra Diwa Larasati, Agung Tandiminanga\",\"doi\":\"10.26418/elkha.v15i2.68481\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The main function of a power generation system is to provide reliable electrical energy. This study aims to determine the reliability of Biomass Power Plants at PT. Tanjung Bayu Perkasa Plantation (PT. TBPP) in the years 2020, 2021, and 2022 using the Loss of Load Probability (LOLP) index calculation method. LOLP is a reliability index that indicates the possibility that the power plant cannot meet the demand. The LOLP of biomass power plants at PT. TBPP in 2020 amounted to 1.2769 days per year. However, the LOLP in 2020 does not comply with the standards set by the Republic of Indonesia Minister of Energy and Mineral Resources Decree in 2018. In contrast, in 2021, it was 0.53403 days per year, and in 2022, it was 0.41748 days per year, both of which meet the standards of the Republic of Indonesia Minister of Energy and Mineral Resources Decree in 2018. The LOLP is affected by the Forced Outage Rate (FOR) and demands exceeding the capacity. Based on the LOLP of biomass power plants at PT. TBPP in 2020, 2021, and 2022, it can be concluded that the reliability of biomass power plants at PT. TBPP is at a higher level of reliability compared to the micro-hydro power plant in Pantai Baru Pandasimo with a LOLP of 51.3627 days per year and the steam power plant at Pertamina EP Asset IV Field Sukowati with LOLP of 4.259535 days per year. The recommendation for future research is to explore ways better to optimize boiler operations in steam power plants at PT. TBPP.\",\"PeriodicalId\":32754,\"journal\":{\"name\":\"Elkha Jurnal Teknik Elektro\",\"volume\":\"66 11\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-10-23\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Elkha Jurnal Teknik Elektro\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.26418/elkha.v15i2.68481\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Elkha Jurnal Teknik Elektro","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.26418/elkha.v15i2.68481","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

发电系统的主要功能是提供可靠的电能。本研究旨在利用负荷损失概率(LOLP)指数计算方法,确定丹戎巴渝竹林(PT. Tanjung Bayu Perkasa Plantation, PT. TBPP)生物质发电厂在2020年、2021年和2022年的可靠性。LOLP是一个可靠性指标,表示电厂不能满足需求的可能性。2020年PT. TBPP生物质能电厂的LOLP为1.2769天/年。然而,2020年的LOLP不符合印度尼西亚共和国能源和矿产资源部2018年法令规定的标准。相比之下,2021年为每年0.53403天,2022年为每年0.41748天,均符合2018年印度尼西亚共和国能源和矿产资源部法令的标准。LOLP受到强制停机率(FOR)和超出容量的需求的影响。根据2020年、2021年和2022年PT. TBPP生物质发电厂的LOLP,可以得出PT. TBPP生物质发电厂的可靠性相对于LOLP为51.3627天/年的Pantai Baru Pandasimo微型水力发电厂和LOLP为4.259535天/年的Pertamina EP Asset IV Field Sukowati蒸汽发电厂处于较高的可靠性水平。建议未来的研究是探索更好地优化PT. TBPP蒸汽发电厂锅炉运行的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Reliability Analysis of Biomass Power Plant Using Loss of Load Probability Index at PT. Tanjung Buyu Perkasa Plantation
The main function of a power generation system is to provide reliable electrical energy. This study aims to determine the reliability of Biomass Power Plants at PT. Tanjung Bayu Perkasa Plantation (PT. TBPP) in the years 2020, 2021, and 2022 using the Loss of Load Probability (LOLP) index calculation method. LOLP is a reliability index that indicates the possibility that the power plant cannot meet the demand. The LOLP of biomass power plants at PT. TBPP in 2020 amounted to 1.2769 days per year. However, the LOLP in 2020 does not comply with the standards set by the Republic of Indonesia Minister of Energy and Mineral Resources Decree in 2018. In contrast, in 2021, it was 0.53403 days per year, and in 2022, it was 0.41748 days per year, both of which meet the standards of the Republic of Indonesia Minister of Energy and Mineral Resources Decree in 2018. The LOLP is affected by the Forced Outage Rate (FOR) and demands exceeding the capacity. Based on the LOLP of biomass power plants at PT. TBPP in 2020, 2021, and 2022, it can be concluded that the reliability of biomass power plants at PT. TBPP is at a higher level of reliability compared to the micro-hydro power plant in Pantai Baru Pandasimo with a LOLP of 51.3627 days per year and the steam power plant at Pertamina EP Asset IV Field Sukowati with LOLP of 4.259535 days per year. The recommendation for future research is to explore ways better to optimize boiler operations in steam power plants at PT. TBPP.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
23
审稿时长
10 weeks
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信