韩国唐哥市人口稠密废物管理分析

Serena Mastuti
{"title":"韩国唐哥市人口稠密废物管理分析","authors":"Serena Mastuti","doi":"10.59134/jtnk.v2i1.487","DOIUrl":null,"url":null,"abstract":"Waste management in South Tangerang City is carried out by the Environmental Waste Sector. Waste transportation is carried out by the Environmental Service and the appointed private sector. Waste transportation is carried out starting from the garbage source to the Temporary Disposal Site and the garbage is transported by garbage trucks to the Cipeucang Final Disposal Site. Waste transportation is carried out 2 rays / day where transportation using a cart from the garbage source to the TPS and / or TPS3R takes 280 minutes / rit and the cost of using a garbage truck from TPS and / or TPS3R takes 400 minutes / rit. But the problem that arises is that the waste generation in the community is not fully transported to the landfill. The purpose of this study was to determine the flow of waste management in South Tangerang City, and to find out the efforts made by the Environmental Agency in the Waste Sector to reduce the burden of waste at the Cipeucang Landfill. This research is classified into the type of qualitative descriptive research with a naturalistic approach method which describes in detail based on the facts that exist. The sampling technique is by using Purposive Sampling techniques. The conclusion of this research is that the waste management carried out by the South Tangerang City Environmental Agency is still not optimal, garbage transportation is still constrained by the large number of damaged garbage transport fleets, the absence of segregation of waste from garbage sources, and insufficient human resources or waste management officers in South Tangerang City.","PeriodicalId":127483,"journal":{"name":"JURNAL TECHLINK","volume":"150 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"ANALISIS PENGELOLAAN SAMPAH PADAT DI KOTA TANGERANG SELATAN\",\"authors\":\"Serena Mastuti\",\"doi\":\"10.59134/jtnk.v2i1.487\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Waste management in South Tangerang City is carried out by the Environmental Waste Sector. Waste transportation is carried out by the Environmental Service and the appointed private sector. Waste transportation is carried out starting from the garbage source to the Temporary Disposal Site and the garbage is transported by garbage trucks to the Cipeucang Final Disposal Site. Waste transportation is carried out 2 rays / day where transportation using a cart from the garbage source to the TPS and / or TPS3R takes 280 minutes / rit and the cost of using a garbage truck from TPS and / or TPS3R takes 400 minutes / rit. But the problem that arises is that the waste generation in the community is not fully transported to the landfill. The purpose of this study was to determine the flow of waste management in South Tangerang City, and to find out the efforts made by the Environmental Agency in the Waste Sector to reduce the burden of waste at the Cipeucang Landfill. This research is classified into the type of qualitative descriptive research with a naturalistic approach method which describes in detail based on the facts that exist. The sampling technique is by using Purposive Sampling techniques. The conclusion of this research is that the waste management carried out by the South Tangerang City Environmental Agency is still not optimal, garbage transportation is still constrained by the large number of damaged garbage transport fleets, the absence of segregation of waste from garbage sources, and insufficient human resources or waste management officers in South Tangerang City.\",\"PeriodicalId\":127483,\"journal\":{\"name\":\"JURNAL TECHLINK\",\"volume\":\"150 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"JURNAL TECHLINK\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.59134/jtnk.v2i1.487\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"JURNAL TECHLINK","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.59134/jtnk.v2i1.487","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

南坦格朗市的废物管理由环境废物部门负责。废物运输由环境事务处和指定的私营机构负责。垃圾从垃圾源开始运输至临时处理场,由垃圾车运输至次品仓最终处理场。废物运输每天进行2天,其中使用手推车从垃圾来源运输到TPS和/或TPS3R需要280分钟/ rit,使用TPS和/或TPS3R的垃圾车需要400分钟/ rit。但随之而来的问题是,社区产生的废物并没有完全运往垃圾填埋场。本研究的目的在于了解南坦格朗市的垃圾管理流程,并了解环保署在垃圾管理部门所做的努力,以减轻垃圾堆填区的垃圾负担。本研究属于定性描述性研究类型,采用自然主义的方法,根据存在的事实进行详细描述。抽样技术是通过使用有目的抽样技术。本研究的结论是,南坦格朗市环保局开展的垃圾管理工作仍然不够理想,垃圾运输仍然受到垃圾运输车队大量损坏、垃圾来源缺乏隔离、南坦格朗市人力资源或垃圾管理人员不足等因素的制约。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
ANALISIS PENGELOLAAN SAMPAH PADAT DI KOTA TANGERANG SELATAN
Waste management in South Tangerang City is carried out by the Environmental Waste Sector. Waste transportation is carried out by the Environmental Service and the appointed private sector. Waste transportation is carried out starting from the garbage source to the Temporary Disposal Site and the garbage is transported by garbage trucks to the Cipeucang Final Disposal Site. Waste transportation is carried out 2 rays / day where transportation using a cart from the garbage source to the TPS and / or TPS3R takes 280 minutes / rit and the cost of using a garbage truck from TPS and / or TPS3R takes 400 minutes / rit. But the problem that arises is that the waste generation in the community is not fully transported to the landfill. The purpose of this study was to determine the flow of waste management in South Tangerang City, and to find out the efforts made by the Environmental Agency in the Waste Sector to reduce the burden of waste at the Cipeucang Landfill. This research is classified into the type of qualitative descriptive research with a naturalistic approach method which describes in detail based on the facts that exist. The sampling technique is by using Purposive Sampling techniques. The conclusion of this research is that the waste management carried out by the South Tangerang City Environmental Agency is still not optimal, garbage transportation is still constrained by the large number of damaged garbage transport fleets, the absence of segregation of waste from garbage sources, and insufficient human resources or waste management officers in South Tangerang City.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信