{"title":"利用弯杆进度法减少湿地施工铁材料浪费的分析","authors":"Candra Yuliana, Retna Hapsari Kartadipura, Mutiara Nursalsadilla S, Sherina Harti S M","doi":"10.14445/23488352/ijce-v10i8p101","DOIUrl":null,"url":null,"abstract":"The components of the material structure that are important in calculating requirements are iron requirements because iron requirements have a high value in construction work. Iron requirements such as reinforcing columns, beams, pile caps, sloofs, and others are widely used for reinforcement. The research aims to determine the need for stirrup reinforcement using a method based on field data with the Bar Bending Schedule (BBS) approach. The BBS method minimises the waste of material so that it only leaves the material in the screw-type iron reinforcement, around 14.79% for iron reinforcement with a diameter of 10 mm and 6.65% for iron reinforcement with a diameter of 16 mm. As well as for plain iron reinforcement, only leave material around 0.01% on mm diameter iron reinforcement. The bar bending schedule method can optimize the remaining material from the remaining length of the iron by reusing it for other iron piece plans where the piece’s dimensions can meet the previous rest.","PeriodicalId":496827,"journal":{"name":"SSRG international journal of civil engineering","volume":"10 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of Minimizing Iron Material Waste for Construction Work in Wetlands with Bar Bending Schedule Method\",\"authors\":\"Candra Yuliana, Retna Hapsari Kartadipura, Mutiara Nursalsadilla S, Sherina Harti S M\",\"doi\":\"10.14445/23488352/ijce-v10i8p101\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The components of the material structure that are important in calculating requirements are iron requirements because iron requirements have a high value in construction work. Iron requirements such as reinforcing columns, beams, pile caps, sloofs, and others are widely used for reinforcement. The research aims to determine the need for stirrup reinforcement using a method based on field data with the Bar Bending Schedule (BBS) approach. The BBS method minimises the waste of material so that it only leaves the material in the screw-type iron reinforcement, around 14.79% for iron reinforcement with a diameter of 10 mm and 6.65% for iron reinforcement with a diameter of 16 mm. As well as for plain iron reinforcement, only leave material around 0.01% on mm diameter iron reinforcement. The bar bending schedule method can optimize the remaining material from the remaining length of the iron by reusing it for other iron piece plans where the piece’s dimensions can meet the previous rest.\",\"PeriodicalId\":496827,\"journal\":{\"name\":\"SSRG international journal of civil engineering\",\"volume\":\"10 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-09-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"SSRG international journal of civil engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.14445/23488352/ijce-v10i8p101\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"SSRG international journal of civil engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.14445/23488352/ijce-v10i8p101","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

材料结构中计算需要量的重要组成部分是铁的需要量,因为铁的需要量在建筑工作中具有很高的价值。钢筋要求如加固柱、梁、桩承台、槽等被广泛用于加固。该研究旨在利用基于现场数据的钢筋弯曲计划(BBS)方法来确定箍筋加固的必要性。BBS方法最大限度地减少了材料的浪费,只将材料留在螺旋型钢筋中,直径为10毫米的钢筋约为14.79%,直径为16毫米的钢筋约为6.65%。对于普通的钢筋,在直径为mm的钢筋上只留下0.01%左右的材料。棒材弯曲计划方法可以优化剩余的材料,从剩余的长度的铁重复使用它的其他铁件计划,其中件的尺寸可以满足之前的休息。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of Minimizing Iron Material Waste for Construction Work in Wetlands with Bar Bending Schedule Method
The components of the material structure that are important in calculating requirements are iron requirements because iron requirements have a high value in construction work. Iron requirements such as reinforcing columns, beams, pile caps, sloofs, and others are widely used for reinforcement. The research aims to determine the need for stirrup reinforcement using a method based on field data with the Bar Bending Schedule (BBS) approach. The BBS method minimises the waste of material so that it only leaves the material in the screw-type iron reinforcement, around 14.79% for iron reinforcement with a diameter of 10 mm and 6.65% for iron reinforcement with a diameter of 16 mm. As well as for plain iron reinforcement, only leave material around 0.01% on mm diameter iron reinforcement. The bar bending schedule method can optimize the remaining material from the remaining length of the iron by reusing it for other iron piece plans where the piece’s dimensions can meet the previous rest.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
0.20
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信