从承包商的角度分析承包业务的失败因素

Q2 Engineering
Ibrahim Mahamid
{"title":"从承包商的角度分析承包业务的失败因素","authors":"Ibrahim Mahamid","doi":"10.1556/1848.2023.00707","DOIUrl":null,"url":null,"abstract":"Abstract This article aims at illustrating the major factors of construction firms' failure from the perspective of constructors. Thirty-seven (37) factors are illustrated in this article. The factors are divided under 3 groups: financial, managerial and external. The study used the field survey technique (questionnaire) to collect the necessary data that serves its purpose. Results illustrate that the top 5 contributors are: delay in collecting payments from owner (financial group), poor work experience (managerial group), bidding strategy (managerial group), local political conditions, low profit due to high competition (financial group). Results indicate that the top factors are internal factors which could be handled and controlled by the company itself. The results of this study are the first step towards identifying the problems of contracting companies in order to understand them and try to find solutions that will raise the level of companies and ensure their continuity and success.","PeriodicalId":37508,"journal":{"name":"International Review of Applied Sciences and Engineering","volume":"54 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-10-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"The failure factors of the contracting business from the contractors point of view\",\"authors\":\"Ibrahim Mahamid\",\"doi\":\"10.1556/1848.2023.00707\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Abstract This article aims at illustrating the major factors of construction firms' failure from the perspective of constructors. Thirty-seven (37) factors are illustrated in this article. The factors are divided under 3 groups: financial, managerial and external. The study used the field survey technique (questionnaire) to collect the necessary data that serves its purpose. Results illustrate that the top 5 contributors are: delay in collecting payments from owner (financial group), poor work experience (managerial group), bidding strategy (managerial group), local political conditions, low profit due to high competition (financial group). Results indicate that the top factors are internal factors which could be handled and controlled by the company itself. The results of this study are the first step towards identifying the problems of contracting companies in order to understand them and try to find solutions that will raise the level of companies and ensure their continuity and success.\",\"PeriodicalId\":37508,\"journal\":{\"name\":\"International Review of Applied Sciences and Engineering\",\"volume\":\"54 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-10-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Review of Applied Sciences and Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1556/1848.2023.00707\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q2\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Review of Applied Sciences and Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1556/1848.2023.00707","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q2","JCRName":"Engineering","Score":null,"Total":0}
引用次数: 0

摘要

摘要本文旨在从施工方的角度阐述施工企业失败的主要因素。本文列举了37个因素。这些因素可分为三大类:财务、管理和外部。本研究采用实地调查技术(问卷调查)收集必要的数据,以服务于其目的。结果表明,前5位影响因素分别是:业主回款延迟(金融集团)、工作经验差(管理集团)、投标策略(管理集团)、当地政治条件、竞争激烈导致利润低(金融集团)。结果表明,排名靠前的因素为内部因素,是公司可以自行处理和控制的。本研究的结果是朝着确定承包公司的问题,以了解他们的第一步,并试图找到解决方案,将提高公司的水平,确保他们的连续性和成功。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
The failure factors of the contracting business from the contractors point of view
Abstract This article aims at illustrating the major factors of construction firms' failure from the perspective of constructors. Thirty-seven (37) factors are illustrated in this article. The factors are divided under 3 groups: financial, managerial and external. The study used the field survey technique (questionnaire) to collect the necessary data that serves its purpose. Results illustrate that the top 5 contributors are: delay in collecting payments from owner (financial group), poor work experience (managerial group), bidding strategy (managerial group), local political conditions, low profit due to high competition (financial group). Results indicate that the top factors are internal factors which could be handled and controlled by the company itself. The results of this study are the first step towards identifying the problems of contracting companies in order to understand them and try to find solutions that will raise the level of companies and ensure their continuity and success.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
International Review of Applied Sciences and Engineering
International Review of Applied Sciences and Engineering Materials Science-Materials Science (miscellaneous)
CiteScore
2.30
自引率
0.00%
发文量
27
审稿时长
46 weeks
期刊介绍: International Review of Applied Sciences and Engineering is a peer reviewed journal. It offers a comprehensive range of articles on all aspects of engineering and applied sciences. It provides an international and interdisciplinary platform for the exchange of ideas between engineers, researchers and scholars within the academy and industry. It covers a wide range of application areas including architecture, building services and energetics, civil engineering, electrical engineering and mechatronics, environmental engineering, mechanical engineering, material sciences, applied informatics and management sciences. The aim of the Journal is to provide a location for reporting original research results having international focus with multidisciplinary content. The published papers provide solely new basic information for designers, scholars and developers working in the mentioned fields. The papers reflect the broad categories of interest in: optimisation, simulation, modelling, control techniques, monitoring, and development of new analysis methods, equipment and system conception.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信