Nasib Al Habib, Eugene Ben-Awuah, Hooman Askari-Nasab
{"title":"半移动式IPCC露天矿山短期规划:铲式分配模型","authors":"Nasib Al Habib, Eugene Ben-Awuah, Hooman Askari-Nasab","doi":"10.1080/17480930.2023.2262823","DOIUrl":null,"url":null,"abstract":"ABSTRACTIn-pit crushing and conveying (IPCC) is considered a suitable alternative to truck haulage in open pit mines because it offers a lower operating cost than a truck-shovel system. It also reduces truck haulage distance and truck requirements. One of the IPCC variations is the semi-mobile system, which is relocated every two to five years. The short-term plan needs to be updated accordingly, based on the crusher’s optimal location and relocation time. To the best of our knowledge, short-term planning with IPCC is an area of research that has not been explored extensively yet and hardly any model can generate short-term schedules considering an IPCC in place. This research work proposes a mixed integer programming model to generate short-term production plans and near-optimal shovel allocation to mining faces, within a time horizon of 12 months. The objective of the model is to minimise the cost of material handling and maximise revenue, with respect to plant requirement, maximum allowable tonnage variation and IPCC location constraints, and the production and NPV targets set by the strategic plan. An iron ore mine case including a semi-mobile IPCC (SMIPCC) system with one relocation is used as the case study to verify the proposed model. The comparison of results between scenarios with and without IPCC justifies the use of IPCC in the iron ore mine from a short to medium-term perspective. The project can be considered a pioneering work in the arena of short-term mine planning with the IPCC.KEYWORDS: IPCCoptimisationhaulage Disclosure statementNo potential conflict of interest was reported by the author(s).Notes1. Dollar values are all in CAD.","PeriodicalId":49180,"journal":{"name":"International Journal of Mining Reclamation and Environment","volume":"48 1","pages":"0"},"PeriodicalIF":2.7000,"publicationDate":"2023-10-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Short-term planning of open pit mines with Semi-Mobile IPCC: a shovel allocation model\",\"authors\":\"Nasib Al Habib, Eugene Ben-Awuah, Hooman Askari-Nasab\",\"doi\":\"10.1080/17480930.2023.2262823\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"ABSTRACTIn-pit crushing and conveying (IPCC) is considered a suitable alternative to truck haulage in open pit mines because it offers a lower operating cost than a truck-shovel system. It also reduces truck haulage distance and truck requirements. One of the IPCC variations is the semi-mobile system, which is relocated every two to five years. The short-term plan needs to be updated accordingly, based on the crusher’s optimal location and relocation time. To the best of our knowledge, short-term planning with IPCC is an area of research that has not been explored extensively yet and hardly any model can generate short-term schedules considering an IPCC in place. This research work proposes a mixed integer programming model to generate short-term production plans and near-optimal shovel allocation to mining faces, within a time horizon of 12 months. The objective of the model is to minimise the cost of material handling and maximise revenue, with respect to plant requirement, maximum allowable tonnage variation and IPCC location constraints, and the production and NPV targets set by the strategic plan. An iron ore mine case including a semi-mobile IPCC (SMIPCC) system with one relocation is used as the case study to verify the proposed model. The comparison of results between scenarios with and without IPCC justifies the use of IPCC in the iron ore mine from a short to medium-term perspective. The project can be considered a pioneering work in the arena of short-term mine planning with the IPCC.KEYWORDS: IPCCoptimisationhaulage Disclosure statementNo potential conflict of interest was reported by the author(s).Notes1. Dollar values are all in CAD.\",\"PeriodicalId\":49180,\"journal\":{\"name\":\"International Journal of Mining Reclamation and Environment\",\"volume\":\"48 1\",\"pages\":\"0\"},\"PeriodicalIF\":2.7000,\"publicationDate\":\"2023-10-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Mining Reclamation and Environment\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/17480930.2023.2262823\",\"RegionNum\":3,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENVIRONMENTAL SCIENCES\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Mining Reclamation and Environment","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/17480930.2023.2262823","RegionNum":3,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENVIRONMENTAL SCIENCES","Score":null,"Total":0}
Short-term planning of open pit mines with Semi-Mobile IPCC: a shovel allocation model
ABSTRACTIn-pit crushing and conveying (IPCC) is considered a suitable alternative to truck haulage in open pit mines because it offers a lower operating cost than a truck-shovel system. It also reduces truck haulage distance and truck requirements. One of the IPCC variations is the semi-mobile system, which is relocated every two to five years. The short-term plan needs to be updated accordingly, based on the crusher’s optimal location and relocation time. To the best of our knowledge, short-term planning with IPCC is an area of research that has not been explored extensively yet and hardly any model can generate short-term schedules considering an IPCC in place. This research work proposes a mixed integer programming model to generate short-term production plans and near-optimal shovel allocation to mining faces, within a time horizon of 12 months. The objective of the model is to minimise the cost of material handling and maximise revenue, with respect to plant requirement, maximum allowable tonnage variation and IPCC location constraints, and the production and NPV targets set by the strategic plan. An iron ore mine case including a semi-mobile IPCC (SMIPCC) system with one relocation is used as the case study to verify the proposed model. The comparison of results between scenarios with and without IPCC justifies the use of IPCC in the iron ore mine from a short to medium-term perspective. The project can be considered a pioneering work in the arena of short-term mine planning with the IPCC.KEYWORDS: IPCCoptimisationhaulage Disclosure statementNo potential conflict of interest was reported by the author(s).Notes1. Dollar values are all in CAD.
期刊介绍:
The International Journal of Mining, Reclamation and Environment published research on mining and environmental technology engineering relating to metalliferous deposits, coal, oil sands, and industrial minerals.
We welcome environmental mining research papers that explore:
-Mining environmental impact assessment and permitting-
Mining and processing technologies-
Mining waste management and waste minimization practices in mining-
Mine site closure-
Mining decommissioning and reclamation-
Acid mine drainage.
The International Journal of Mining, Reclamation and Environment welcomes mining research papers that explore:
-Design of surface and underground mines (economics, geotechnical, production scheduling, ventilation)-
Mine planning and optimization-
Mining geostatics-
Mine drilling and blasting technologies-
Mining material handling systems-
Mine equipment