{"title":"砂质土机械化隧道增大尾注浆区可行性研究","authors":"Faezeh Barri, Hamid Chakeri, Hamed Haghkish, Milad Manafi","doi":"10.3311/ppci.23309","DOIUrl":null,"url":null,"abstract":"Nowadays, excavation in urban environments can have many risks; one of these hazards is improper tail-grouting of Earth Pressure Balance Machine (EPBM) and the consequent ground surface settlement. Failure to fill the tail space with suitable grout significantly affects the surface displacements. Injecting more grout to penetrate deeper around the tunnel will play a more effective role in reducing displacements and permeability of the soil. Therefore, experimentally investigation of the feasibility of increasing the tail-grouting zone during excavation around the tunnel space and the effect of this penetration on the amount of ground surface displacements is the main purpose of this paper. Thus, experimental tests were performed with different grout injection pressure and the effect of each of the pressure on the penetration depth of grout into the soil new laboratory model were examined. Then to study the effect of the grout penetration depth on surface settlement to determination of the adequate amount of grout injection pressure a numerical modeling of Tabriz metro line 2 by FLAC3D software were completed. For this purpose, the results of the laboratory tests (the penetration depth of grout) were used in numerical modeling. The results indicated that the amount of penetration in the implemented granulation has increased due to the increase in pressure, so doubling the pressure causes a 30% increase in grout penetration in the surrounding soil. The results of numerical studies showed that increasing the range of injection in the modeling causes a significant reduction (80 percent) in the ground surface settlement.","PeriodicalId":1,"journal":{"name":"Accounts of Chemical Research","volume":null,"pages":null},"PeriodicalIF":16.4000,"publicationDate":"2023-11-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Investigation of the Feasibility of Increasing the Tail-grouting Zone during Mechanized Tunneling in Sandy Soils\",\"authors\":\"Faezeh Barri, Hamid Chakeri, Hamed Haghkish, Milad Manafi\",\"doi\":\"10.3311/ppci.23309\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Nowadays, excavation in urban environments can have many risks; one of these hazards is improper tail-grouting of Earth Pressure Balance Machine (EPBM) and the consequent ground surface settlement. Failure to fill the tail space with suitable grout significantly affects the surface displacements. Injecting more grout to penetrate deeper around the tunnel will play a more effective role in reducing displacements and permeability of the soil. Therefore, experimentally investigation of the feasibility of increasing the tail-grouting zone during excavation around the tunnel space and the effect of this penetration on the amount of ground surface displacements is the main purpose of this paper. Thus, experimental tests were performed with different grout injection pressure and the effect of each of the pressure on the penetration depth of grout into the soil new laboratory model were examined. Then to study the effect of the grout penetration depth on surface settlement to determination of the adequate amount of grout injection pressure a numerical modeling of Tabriz metro line 2 by FLAC3D software were completed. For this purpose, the results of the laboratory tests (the penetration depth of grout) were used in numerical modeling. The results indicated that the amount of penetration in the implemented granulation has increased due to the increase in pressure, so doubling the pressure causes a 30% increase in grout penetration in the surrounding soil. The results of numerical studies showed that increasing the range of injection in the modeling causes a significant reduction (80 percent) in the ground surface settlement.\",\"PeriodicalId\":1,\"journal\":{\"name\":\"Accounts of Chemical Research\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":16.4000,\"publicationDate\":\"2023-11-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Accounts of Chemical Research\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.3311/ppci.23309\",\"RegionNum\":1,\"RegionCategory\":\"化学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"CHEMISTRY, MULTIDISCIPLINARY\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Accounts of Chemical Research","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3311/ppci.23309","RegionNum":1,"RegionCategory":"化学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"CHEMISTRY, MULTIDISCIPLINARY","Score":null,"Total":0}
Investigation of the Feasibility of Increasing the Tail-grouting Zone during Mechanized Tunneling in Sandy Soils
Nowadays, excavation in urban environments can have many risks; one of these hazards is improper tail-grouting of Earth Pressure Balance Machine (EPBM) and the consequent ground surface settlement. Failure to fill the tail space with suitable grout significantly affects the surface displacements. Injecting more grout to penetrate deeper around the tunnel will play a more effective role in reducing displacements and permeability of the soil. Therefore, experimentally investigation of the feasibility of increasing the tail-grouting zone during excavation around the tunnel space and the effect of this penetration on the amount of ground surface displacements is the main purpose of this paper. Thus, experimental tests were performed with different grout injection pressure and the effect of each of the pressure on the penetration depth of grout into the soil new laboratory model were examined. Then to study the effect of the grout penetration depth on surface settlement to determination of the adequate amount of grout injection pressure a numerical modeling of Tabriz metro line 2 by FLAC3D software were completed. For this purpose, the results of the laboratory tests (the penetration depth of grout) were used in numerical modeling. The results indicated that the amount of penetration in the implemented granulation has increased due to the increase in pressure, so doubling the pressure causes a 30% increase in grout penetration in the surrounding soil. The results of numerical studies showed that increasing the range of injection in the modeling causes a significant reduction (80 percent) in the ground surface settlement.
期刊介绍:
Accounts of Chemical Research presents short, concise and critical articles offering easy-to-read overviews of basic research and applications in all areas of chemistry and biochemistry. These short reviews focus on research from the author’s own laboratory and are designed to teach the reader about a research project. In addition, Accounts of Chemical Research publishes commentaries that give an informed opinion on a current research problem. Special Issues online are devoted to a single topic of unusual activity and significance.
Accounts of Chemical Research replaces the traditional article abstract with an article "Conspectus." These entries synopsize the research affording the reader a closer look at the content and significance of an article. Through this provision of a more detailed description of the article contents, the Conspectus enhances the article's discoverability by search engines and the exposure for the research.