{"title":"灰色挣时管理:一种新的进度监控方法","authors":"Chitti Babu Kapuganti, K. V. G. D. Balaji, T. Santhosh Kumar, I. L. N. Prasad","doi":"10.15866/irece.v14i4.20968","DOIUrl":null,"url":null,"abstract":"Earned Value Management (EVM) is the conventional method for controlling and monitoring construction projects. Schedule monitoring with EVM has a lower impact since it measures in budgetary terms. Earned Duration Method (EDM) was presented, which decouples schedule and cost aspects. The parameters in EDM monitors the health of the project schedule and gives the estimated completion date. EDM results are indeterministic, so the estimators require expertise in order to comprehend them. For this purpose, the present study proposes a new methodology entitled \"Grey Earned Duration Management (GEDM)\" by associating EDM and grey theory. From GEDM, estimators can get a clear idea about the degree of control measures to consider based on the project progress at a particular point in time. GEDM can precisely forecast the upper bound and lower bound of the estimated duration at completion for every tracking point. GEDM significantly enhances the results of EDM by providing a range of the estimated parameter. This paper also presents a case study to distinguish the EDM and GEDM.","PeriodicalId":37854,"journal":{"name":"International Review of Civil Engineering","volume":"42 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Grey Earned Duration Management: a New Schedule Monitoring Approach\",\"authors\":\"Chitti Babu Kapuganti, K. V. G. D. Balaji, T. Santhosh Kumar, I. L. N. Prasad\",\"doi\":\"10.15866/irece.v14i4.20968\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Earned Value Management (EVM) is the conventional method for controlling and monitoring construction projects. Schedule monitoring with EVM has a lower impact since it measures in budgetary terms. Earned Duration Method (EDM) was presented, which decouples schedule and cost aspects. The parameters in EDM monitors the health of the project schedule and gives the estimated completion date. EDM results are indeterministic, so the estimators require expertise in order to comprehend them. For this purpose, the present study proposes a new methodology entitled \\\"Grey Earned Duration Management (GEDM)\\\" by associating EDM and grey theory. From GEDM, estimators can get a clear idea about the degree of control measures to consider based on the project progress at a particular point in time. GEDM can precisely forecast the upper bound and lower bound of the estimated duration at completion for every tracking point. GEDM significantly enhances the results of EDM by providing a range of the estimated parameter. This paper also presents a case study to distinguish the EDM and GEDM.\",\"PeriodicalId\":37854,\"journal\":{\"name\":\"International Review of Civil Engineering\",\"volume\":\"42 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Review of Civil Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.15866/irece.v14i4.20968\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q1\",\"JCRName\":\"Engineering\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Review of Civil Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15866/irece.v14i4.20968","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q1","JCRName":"Engineering","Score":null,"Total":0}
Grey Earned Duration Management: a New Schedule Monitoring Approach
Earned Value Management (EVM) is the conventional method for controlling and monitoring construction projects. Schedule monitoring with EVM has a lower impact since it measures in budgetary terms. Earned Duration Method (EDM) was presented, which decouples schedule and cost aspects. The parameters in EDM monitors the health of the project schedule and gives the estimated completion date. EDM results are indeterministic, so the estimators require expertise in order to comprehend them. For this purpose, the present study proposes a new methodology entitled "Grey Earned Duration Management (GEDM)" by associating EDM and grey theory. From GEDM, estimators can get a clear idea about the degree of control measures to consider based on the project progress at a particular point in time. GEDM can precisely forecast the upper bound and lower bound of the estimated duration at completion for every tracking point. GEDM significantly enhances the results of EDM by providing a range of the estimated parameter. This paper also presents a case study to distinguish the EDM and GEDM.
期刊介绍:
The International Review of Civil Engineering (IRECE) is a peer-reviewed journal that publishes original theoretical papers, applied papers, review papers and case studies on all fields of civil engineering. The scope of the Journal encompasses, but is not restricted to the following areas: infrastructure engineering; transportation engineering; structural engineering (buildings innovative structures environmentally responsive structures bridges stadiums commercial and public buildings, transmission towers, television and telecommunication masts, cooling towers, plates and shells, suspension structures, smart structures, nuclear reactors, dams, pressure vessels, pipelines, tunnels and so on); earthquake, hazards, structural dynamics, risks and mitigation engineering; environmental engineering; structure-fluid-soil interaction; wind engineering; fire engineering; multi-scale analysis; constitutive modeling and experimental testing; construction materials; composite materials in engineering structures (use, theoretical analysis and fabrication techniques); novel computational modeling techniques; engineering economics. The Editorial policy is to maintain a reasonable balance between papers regarding different research areas so that the Journal will be useful to all interested scientific groups.