Putri Nia Luki Patmasari Putri, Muhamad Abdul Jumali, Rusdiyantoro Rusdiyantoro
{"title":"通过产业协调员培训优化公司绩效:实际需求评估","authors":"Putri Nia Luki Patmasari Putri, Muhamad Abdul Jumali, Rusdiyantoro Rusdiyantoro","doi":"10.36456/tibuana.6.2.7665.104-108","DOIUrl":null,"url":null,"abstract":"The study of performance is incredibly fascinating. One of them is the way in which mid-level management functions as both a conduit for information to top management and the person in control of subordinates. This study aims to enhance the coordinator of the industrial department's performance. This study's data processing and analysis procedure employs a qualitative approach by carrying out an analysis using the TNA (Training Need Analysis) method. At electromotor engine repair service firms in East Java, this method is used to assess the variables that contribute to delays in the completion of repairs of goods as well as the kind of training provided to coordinators to prevent delays in the completion of repairs of goods. The outcomes show in the study, it was discovered that the absence of effective communication between division coordinators in the industrial department, skill gaps, and workers who are not suited for the job are the main causes of delays in the completion of goods. Because the percentage is still low for corporate performance and still less productive, the performance value in each division, such as industrial repair, is 6.1%, vacuum pump 6.6%, blower 6.2%, fabrication 7.4 and rewinding 7.5% to complete the items.
","PeriodicalId":486857,"journal":{"name":"Tibuana","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Optimizing Company Performance Through Industrial Coordinator Training : A Practical Needs Assessment\",\"authors\":\"Putri Nia Luki Patmasari Putri, Muhamad Abdul Jumali, Rusdiyantoro Rusdiyantoro\",\"doi\":\"10.36456/tibuana.6.2.7665.104-108\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The study of performance is incredibly fascinating. One of them is the way in which mid-level management functions as both a conduit for information to top management and the person in control of subordinates. This study aims to enhance the coordinator of the industrial department's performance. This study's data processing and analysis procedure employs a qualitative approach by carrying out an analysis using the TNA (Training Need Analysis) method. At electromotor engine repair service firms in East Java, this method is used to assess the variables that contribute to delays in the completion of repairs of goods as well as the kind of training provided to coordinators to prevent delays in the completion of repairs of goods. The outcomes show in the study, it was discovered that the absence of effective communication between division coordinators in the industrial department, skill gaps, and workers who are not suited for the job are the main causes of delays in the completion of goods. Because the percentage is still low for corporate performance and still less productive, the performance value in each division, such as industrial repair, is 6.1%, vacuum pump 6.6%, blower 6.2%, fabrication 7.4 and rewinding 7.5% to complete the items.
\",\"PeriodicalId\":486857,\"journal\":{\"name\":\"Tibuana\",\"volume\":\"46 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Tibuana\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.36456/tibuana.6.2.7665.104-108\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Tibuana","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.36456/tibuana.6.2.7665.104-108","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
对表现的研究是非常迷人的。其中之一是中层管理既是向高层管理者传递信息的渠道,又是控制下属的人。本研究旨在提升工业部门绩效协调能力。本研究的数据处理和分析过程采用定性方法,采用TNA (Training Need analysis)方法进行分析。在东爪哇的电动机发动机修理服务公司,使用这种方法来评估造成货物修理工作延误的各种变量,以及为防止货物修理工作延误而向协调员提供的培训种类。研究结果显示,工业部门部门协调员之间缺乏有效沟通,技能差距,工人不适合工作是导致货物完成延迟的主要原因。由于企业绩效占比仍然较低,生产效率仍然较低,因此各个部门的绩效值,如工业维修为6.1%,真空泵为6.6%,鼓风机为6.2%,制造为7.4,复卷为7.5%,以完成项目。
Optimizing Company Performance Through Industrial Coordinator Training : A Practical Needs Assessment
The study of performance is incredibly fascinating. One of them is the way in which mid-level management functions as both a conduit for information to top management and the person in control of subordinates. This study aims to enhance the coordinator of the industrial department's performance. This study's data processing and analysis procedure employs a qualitative approach by carrying out an analysis using the TNA (Training Need Analysis) method. At electromotor engine repair service firms in East Java, this method is used to assess the variables that contribute to delays in the completion of repairs of goods as well as the kind of training provided to coordinators to prevent delays in the completion of repairs of goods. The outcomes show in the study, it was discovered that the absence of effective communication between division coordinators in the industrial department, skill gaps, and workers who are not suited for the job are the main causes of delays in the completion of goods. Because the percentage is still low for corporate performance and still less productive, the performance value in each division, such as industrial repair, is 6.1%, vacuum pump 6.6%, blower 6.2%, fabrication 7.4 and rewinding 7.5% to complete the items.