Scrum成熟度等级评估与改进建议:ABC应用案例研究

Alcredo Simanjuntak, None Eko K. Budiardjo, None Kodrat Mahatma
{"title":"Scrum成熟度等级评估与改进建议:ABC应用案例研究","authors":"Alcredo Simanjuntak, None Eko K. Budiardjo, None Kodrat Mahatma","doi":"10.29207/resti.v7i5.5134","DOIUrl":null,"url":null,"abstract":"Bank XYZ, one of the digital banking in Indonesia, has a digital product ABC for customers to complete online banking transactions. Bank XYZ uses Scrum as the methodology to develop ABC. Several problems were found in the process related to the delay in the release process. The achievement of sprint goals from May to December 2021 is only 6%. This fact allegedly caused some frequent release delays. To resolve the root causes, mixed-method research was conducted to provide recommendations for improving the implementation of Scrum. The Scrum Maturity Model questionnaires were distributed to several Scrum teams, followed by interviews with several roles that were used to validate the results. The key process area rating formula of the Agile maturity model was used to decide the maturity level. After the maturity level result was obtained, recommendation practices were generated from the not well-implemented practice. This case-based research shows that Bank XYZ reached maturity level 2 for ABC development. Bank XYZ has implemented 78 out of 79 practices, however, 28 practices need improvement and one practice needs to be applied. Objectives of maturity levels group recommendation practices. The combination of Scrum best practices and empirical practices from previous research generated those practices. This research was intended to give general recommendations on how to improve Scrum implementation and on how to resolve release time problems by enhancing Scrum in Bank XYZ empirically.","PeriodicalId":435683,"journal":{"name":"Jurnal RESTI (Rekayasa Sistem dan Teknologi Informasi)","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-10-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Scrum Maturity Level Evaluation and Improvement Recommendation: Case Study on ABC Application\",\"authors\":\"Alcredo Simanjuntak, None Eko K. Budiardjo, None Kodrat Mahatma\",\"doi\":\"10.29207/resti.v7i5.5134\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Bank XYZ, one of the digital banking in Indonesia, has a digital product ABC for customers to complete online banking transactions. Bank XYZ uses Scrum as the methodology to develop ABC. Several problems were found in the process related to the delay in the release process. The achievement of sprint goals from May to December 2021 is only 6%. This fact allegedly caused some frequent release delays. To resolve the root causes, mixed-method research was conducted to provide recommendations for improving the implementation of Scrum. The Scrum Maturity Model questionnaires were distributed to several Scrum teams, followed by interviews with several roles that were used to validate the results. The key process area rating formula of the Agile maturity model was used to decide the maturity level. After the maturity level result was obtained, recommendation practices were generated from the not well-implemented practice. This case-based research shows that Bank XYZ reached maturity level 2 for ABC development. Bank XYZ has implemented 78 out of 79 practices, however, 28 practices need improvement and one practice needs to be applied. Objectives of maturity levels group recommendation practices. The combination of Scrum best practices and empirical practices from previous research generated those practices. This research was intended to give general recommendations on how to improve Scrum implementation and on how to resolve release time problems by enhancing Scrum in Bank XYZ empirically.\",\"PeriodicalId\":435683,\"journal\":{\"name\":\"Jurnal RESTI (Rekayasa Sistem dan Teknologi Informasi)\",\"volume\":\"25 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-10-06\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Jurnal RESTI (Rekayasa Sistem dan Teknologi Informasi)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.29207/resti.v7i5.5134\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal RESTI (Rekayasa Sistem dan Teknologi Informasi)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29207/resti.v7i5.5134","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

印尼数字银行之一的XYZ银行推出了一款数字产品ABC,供客户完成网上银行交易。银行XYZ使用Scrum作为开发ABC的方法。在过程中发现了几个与发布过程延迟有关的问题。2021年5月至12月的冲刺目标完成率仅为6%。据称,这一事实导致了一些频繁的发布延迟。为了解决根本原因,我们进行了混合方法研究,为改进Scrum的实施提供建议。Scrum成熟度模型问卷被分发给几个Scrum团队,随后是对几个角色的访谈,用于验证结果。采用敏捷成熟度模型中的关键过程域分级公式确定成熟度等级。在获得成熟度级别结果之后,从没有很好实现的实践中生成推荐实践。这个基于案例的研究表明,银行XYZ达到了ABC开发的成熟度级别2。XYZ银行已经实施了79个实践中的78个,然而,28个实践需要改进,一个实践需要应用。成熟度级别组推荐实践的目标。Scrum最佳实践和之前研究的经验实践相结合产生了这些实践。这项研究的目的是给出关于如何改进Scrum实施的一般性建议,以及如何通过在Bank XYZ中增强Scrum来解决发布时间问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Scrum Maturity Level Evaluation and Improvement Recommendation: Case Study on ABC Application
Bank XYZ, one of the digital banking in Indonesia, has a digital product ABC for customers to complete online banking transactions. Bank XYZ uses Scrum as the methodology to develop ABC. Several problems were found in the process related to the delay in the release process. The achievement of sprint goals from May to December 2021 is only 6%. This fact allegedly caused some frequent release delays. To resolve the root causes, mixed-method research was conducted to provide recommendations for improving the implementation of Scrum. The Scrum Maturity Model questionnaires were distributed to several Scrum teams, followed by interviews with several roles that were used to validate the results. The key process area rating formula of the Agile maturity model was used to decide the maturity level. After the maturity level result was obtained, recommendation practices were generated from the not well-implemented practice. This case-based research shows that Bank XYZ reached maturity level 2 for ABC development. Bank XYZ has implemented 78 out of 79 practices, however, 28 practices need improvement and one practice needs to be applied. Objectives of maturity levels group recommendation practices. The combination of Scrum best practices and empirical practices from previous research generated those practices. This research was intended to give general recommendations on how to improve Scrum implementation and on how to resolve release time problems by enhancing Scrum in Bank XYZ empirically.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信