一种钢-混凝土组合段在大跨度钢-混凝土混合梁上的吊装、精确定位和临时固定的施工工艺

{"title":"一种钢-混凝土组合段在大跨度钢-混凝土混合梁上的吊装、精确定位和临时固定的施工工艺","authors":"","doi":"10.25236/ajage.2023.050306","DOIUrl":null,"url":null,"abstract":"A steel-concrete composite segment of a steel-concrete hybrid girder features a complex structure and generally encounters difficulties in positioning and temporary fixation. In view of this, this study explored the layout of survey control networks and put forward a method for observing deformation of a concrete box girder at the cantilever end at the steel-concrete composite segment based on Hanzhuang Grand Canal Bridge, Tai’erzhuang District, Zaozhuang City, Shandong Province, China. Moreover, a construction process for hoisting the steel-concrete composite segment was proposed and a temporary fixation device for the segment used with a hanging basket was developed. The key sequences of temporary fixation were researched, which could provide practical and technological reference for similar engineering.","PeriodicalId":441364,"journal":{"name":"Academic Journal of Architecture and Geotechnical Engineering","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A construction process for hoisting, precise positioning and temporary fixation of a steel-concrete composite segment on a long-span steel-concrete hybrid girder\",\"authors\":\"\",\"doi\":\"10.25236/ajage.2023.050306\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A steel-concrete composite segment of a steel-concrete hybrid girder features a complex structure and generally encounters difficulties in positioning and temporary fixation. In view of this, this study explored the layout of survey control networks and put forward a method for observing deformation of a concrete box girder at the cantilever end at the steel-concrete composite segment based on Hanzhuang Grand Canal Bridge, Tai’erzhuang District, Zaozhuang City, Shandong Province, China. Moreover, a construction process for hoisting the steel-concrete composite segment was proposed and a temporary fixation device for the segment used with a hanging basket was developed. The key sequences of temporary fixation were researched, which could provide practical and technological reference for similar engineering.\",\"PeriodicalId\":441364,\"journal\":{\"name\":\"Academic Journal of Architecture and Geotechnical Engineering\",\"volume\":\"4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Academic Journal of Architecture and Geotechnical Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.25236/ajage.2023.050306\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Academic Journal of Architecture and Geotechnical Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25236/ajage.2023.050306","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

钢-混凝土混合梁的钢-混凝土组合节段结构复杂,定位和临时固定困难。鉴于此,本研究以山东省枣庄市台儿庄区韩庄大运河大桥为例,探索了测量控制网的布置,提出了钢-混凝土组合管段悬臂端混凝土箱梁变形观测方法。提出了钢-混凝土组合管段吊装的施工工艺,并研制了一种用吊篮吊装的管段临时固定装置。对临时固定的关键工序进行了研究,可为类似工程提供实用和技术参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
A construction process for hoisting, precise positioning and temporary fixation of a steel-concrete composite segment on a long-span steel-concrete hybrid girder
A steel-concrete composite segment of a steel-concrete hybrid girder features a complex structure and generally encounters difficulties in positioning and temporary fixation. In view of this, this study explored the layout of survey control networks and put forward a method for observing deformation of a concrete box girder at the cantilever end at the steel-concrete composite segment based on Hanzhuang Grand Canal Bridge, Tai’erzhuang District, Zaozhuang City, Shandong Province, China. Moreover, a construction process for hoisting the steel-concrete composite segment was proposed and a temporary fixation device for the segment used with a hanging basket was developed. The key sequences of temporary fixation were researched, which could provide practical and technological reference for similar engineering.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信