{"title":"一种钢-混凝土组合段在大跨度钢-混凝土混合梁上的吊装、精确定位和临时固定的施工工艺","authors":"","doi":"10.25236/ajage.2023.050306","DOIUrl":null,"url":null,"abstract":"A steel-concrete composite segment of a steel-concrete hybrid girder features a complex structure and generally encounters difficulties in positioning and temporary fixation. In view of this, this study explored the layout of survey control networks and put forward a method for observing deformation of a concrete box girder at the cantilever end at the steel-concrete composite segment based on Hanzhuang Grand Canal Bridge, Tai’erzhuang District, Zaozhuang City, Shandong Province, China. Moreover, a construction process for hoisting the steel-concrete composite segment was proposed and a temporary fixation device for the segment used with a hanging basket was developed. The key sequences of temporary fixation were researched, which could provide practical and technological reference for similar engineering.","PeriodicalId":441364,"journal":{"name":"Academic Journal of Architecture and Geotechnical Engineering","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"A construction process for hoisting, precise positioning and temporary fixation of a steel-concrete composite segment on a long-span steel-concrete hybrid girder\",\"authors\":\"\",\"doi\":\"10.25236/ajage.2023.050306\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"A steel-concrete composite segment of a steel-concrete hybrid girder features a complex structure and generally encounters difficulties in positioning and temporary fixation. In view of this, this study explored the layout of survey control networks and put forward a method for observing deformation of a concrete box girder at the cantilever end at the steel-concrete composite segment based on Hanzhuang Grand Canal Bridge, Tai’erzhuang District, Zaozhuang City, Shandong Province, China. Moreover, a construction process for hoisting the steel-concrete composite segment was proposed and a temporary fixation device for the segment used with a hanging basket was developed. The key sequences of temporary fixation were researched, which could provide practical and technological reference for similar engineering.\",\"PeriodicalId\":441364,\"journal\":{\"name\":\"Academic Journal of Architecture and Geotechnical Engineering\",\"volume\":\"4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Academic Journal of Architecture and Geotechnical Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.25236/ajage.2023.050306\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Academic Journal of Architecture and Geotechnical Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25236/ajage.2023.050306","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
A construction process for hoisting, precise positioning and temporary fixation of a steel-concrete composite segment on a long-span steel-concrete hybrid girder
A steel-concrete composite segment of a steel-concrete hybrid girder features a complex structure and generally encounters difficulties in positioning and temporary fixation. In view of this, this study explored the layout of survey control networks and put forward a method for observing deformation of a concrete box girder at the cantilever end at the steel-concrete composite segment based on Hanzhuang Grand Canal Bridge, Tai’erzhuang District, Zaozhuang City, Shandong Province, China. Moreover, a construction process for hoisting the steel-concrete composite segment was proposed and a temporary fixation device for the segment used with a hanging basket was developed. The key sequences of temporary fixation were researched, which could provide practical and technological reference for similar engineering.