{"title":"利益攸关方参与对肯尼亚卫生部门捐助者资助项目可持续性的影响","authors":"Alice Micheni, Susan Were, Gregory Namusonge","doi":"10.47604/ijepm.2051","DOIUrl":null,"url":null,"abstract":"Purpose: The study sought to find out the influence of stakeholder engagement on the sustainability of donor funded projects in the health sector in Kenya.
 Methodology: This study used a mixed method research design where both quantitative and qualitative data were collected, then analyzed, and conclusions drawn. The research design used was explanatory. The target population was 700 employees drawn from various stakeholders in the health sector. The study adopted stratified, purposive, and simple random sampling techniques to select a sample of 230 respondents. The study used questionnaires to collect primary data. The data was analyzed using the Statistical Package for Social Sciences (SPSS) version 27. Both descriptive and inferential statistics were computed. The data was presented using Tables.
 Findings: The study found out that there exists a relationship between stakeholder engagement and sustainability of donor funded projects in the health sector in Kenya. The statistical results of coefficients showed that the legal and regulatory framework moderates the relationship between stakeholder engagement and sustainability of donor funded projects in the health sector in Kenya. The study therefore concludes that an improvement in stakeholder engagement will lead to an improvement in sustainability of donor funded projects in the health sector in Kenya.
 Unique Contribution to Theory, Practice and Policy: The study was anchored on Ladder of Participation Model. The study therefore recommends that the health sector in Kenya should work towards strengthening the frameworks for stakeholder engagement in the health-related projects if sustainability of the projects must be attained. There is great need to review and ensure stakeholder relationship management, stakeholder participation in decision making of key activities as well as ensure avenues to enable stakeholders actively participate in project activities across the entire project life cycle. The study recommends stakeholder mapping to be done based on meritocracy. The study recommends that the legal and regulatory framework around the stakeholder engagement should be strengthened to ensure compliance.","PeriodicalId":499701,"journal":{"name":"International journal of entrepreneurship and project management","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Influence of Stakeholder Engagement on Sustainability of Donor Funded Projects in the Health Sector in Kenya\",\"authors\":\"Alice Micheni, Susan Were, Gregory Namusonge\",\"doi\":\"10.47604/ijepm.2051\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Purpose: The study sought to find out the influence of stakeholder engagement on the sustainability of donor funded projects in the health sector in Kenya.
 Methodology: This study used a mixed method research design where both quantitative and qualitative data were collected, then analyzed, and conclusions drawn. The research design used was explanatory. The target population was 700 employees drawn from various stakeholders in the health sector. The study adopted stratified, purposive, and simple random sampling techniques to select a sample of 230 respondents. The study used questionnaires to collect primary data. The data was analyzed using the Statistical Package for Social Sciences (SPSS) version 27. Both descriptive and inferential statistics were computed. The data was presented using Tables.
 Findings: The study found out that there exists a relationship between stakeholder engagement and sustainability of donor funded projects in the health sector in Kenya. The statistical results of coefficients showed that the legal and regulatory framework moderates the relationship between stakeholder engagement and sustainability of donor funded projects in the health sector in Kenya. The study therefore concludes that an improvement in stakeholder engagement will lead to an improvement in sustainability of donor funded projects in the health sector in Kenya.
 Unique Contribution to Theory, Practice and Policy: The study was anchored on Ladder of Participation Model. The study therefore recommends that the health sector in Kenya should work towards strengthening the frameworks for stakeholder engagement in the health-related projects if sustainability of the projects must be attained. There is great need to review and ensure stakeholder relationship management, stakeholder participation in decision making of key activities as well as ensure avenues to enable stakeholders actively participate in project activities across the entire project life cycle. The study recommends stakeholder mapping to be done based on meritocracy. The study recommends that the legal and regulatory framework around the stakeholder engagement should be strengthened to ensure compliance.\",\"PeriodicalId\":499701,\"journal\":{\"name\":\"International journal of entrepreneurship and project management\",\"volume\":\"8 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-31\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International journal of entrepreneurship and project management\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.47604/ijepm.2051\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International journal of entrepreneurship and project management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.47604/ijepm.2051","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

目的:本研究旨在找出利益攸关方参与对肯尼亚卫生部门捐助者资助项目可持续性的影响。研究方法:本研究采用混合方法研究设计,收集定量和定性数据,然后进行分析,得出结论。使用的研究设计是解释性的。目标人群是来自卫生部门各利益攸关方的700名雇员。本研究采用分层、有目的、简单随机抽样的方法,选取了230名受访者。该研究采用问卷调查的方式收集原始数据。使用社会科学统计软件包(SPSS)第27版分析数据。计算描述性统计量和推断性统计量。数据采用表 研究结果:研究发现,肯尼亚卫生部门的利益攸关方参与与捐助者资助项目的可持续性之间存在关系。系数的统计结果表明,法律和监管框架缓和了肯尼亚卫生部门利益攸关方参与与捐助者资助项目可持续性之间的关系。因此,这项研究的结论是,利益攸关方参与的改善将导致肯尼亚卫生部门捐助者资助项目的可持续性得到改善。对理论、实践和政策的独特贡献:研究立足于参与阶梯模型。因此,研究报告建议,如果必须实现项目的可持续性,肯尼亚卫生部门应努力加强利益攸关方参与与卫生有关的项目的框架。非常需要审查和确保干系人关系管理,干系人参与关键活动的决策,以及确保干系人在整个项目生命周期中积极参与项目活动的途径。该研究建议在精英管理的基础上绘制利益相关者地图。该研究建议,应加强有关利益相关者参与的法律和监管框架,以确保合规。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Influence of Stakeholder Engagement on Sustainability of Donor Funded Projects in the Health Sector in Kenya
Purpose: The study sought to find out the influence of stakeholder engagement on the sustainability of donor funded projects in the health sector in Kenya. Methodology: This study used a mixed method research design where both quantitative and qualitative data were collected, then analyzed, and conclusions drawn. The research design used was explanatory. The target population was 700 employees drawn from various stakeholders in the health sector. The study adopted stratified, purposive, and simple random sampling techniques to select a sample of 230 respondents. The study used questionnaires to collect primary data. The data was analyzed using the Statistical Package for Social Sciences (SPSS) version 27. Both descriptive and inferential statistics were computed. The data was presented using Tables. Findings: The study found out that there exists a relationship between stakeholder engagement and sustainability of donor funded projects in the health sector in Kenya. The statistical results of coefficients showed that the legal and regulatory framework moderates the relationship between stakeholder engagement and sustainability of donor funded projects in the health sector in Kenya. The study therefore concludes that an improvement in stakeholder engagement will lead to an improvement in sustainability of donor funded projects in the health sector in Kenya. Unique Contribution to Theory, Practice and Policy: The study was anchored on Ladder of Participation Model. The study therefore recommends that the health sector in Kenya should work towards strengthening the frameworks for stakeholder engagement in the health-related projects if sustainability of the projects must be attained. There is great need to review and ensure stakeholder relationship management, stakeholder participation in decision making of key activities as well as ensure avenues to enable stakeholders actively participate in project activities across the entire project life cycle. The study recommends stakeholder mapping to be done based on meritocracy. The study recommends that the legal and regulatory framework around the stakeholder engagement should be strengthened to ensure compliance.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信