{"title":"基于节点识别的政府投资工程项目灰色利益链识别与控制模型","authors":"Lin Deng, Yaping Wu, Xianjun Chen, Tian Li, Yun Chen","doi":"10.1155/2023/3372820","DOIUrl":null,"url":null,"abstract":"In the bidding process of government investment engineering projects, collusion between the government and bidders occurs repeatedly, which seriously affects the quality of engineering projects and the effectiveness of the government investment. Therefore, it is necessary to analyze and discuss the collusion between the government and bidders in government investment engineering projects, so as to provide a healthy and sustainable environment for the government investment engineering bidding market. There are two main types of collusion in engineering bidding: horizontal collusion and vertical collusion, and this paper focuses on the vertical collusion process in the engineering bidding process. A conceptual framework of the grey interest chain based on three stages of benefit creation, benefit distribution, and benefit realization was established, 15 major nodes in the grey interest chain were identified, and a grey interest chain control model was constructed, which further identified and classified the nodes into four levels: key nodes, important nodes, general nodes, and unimportant nodes. Finally, through the application of the model in the case, measures such as establishing a cracking mechanism for grey resource integration, increasing the supervision of grey interest chain, and strengthening post-bid audit are proposed. Measures such as including the preparation of bidding documents into the work assessment system and entrusting consulting units or third parties to prepare bidding documents are proposed to establish a crack mechanism for grey resource integration. In the benefit distribution stage, the penalties for the government and the bidders can be appropriately increased, the responsibilities of enterprises and project leaders can be implemented in the system on a reciprocal basis, and a perfect reputation mechanism information can be established. At the stage of benefit realization, the bidding system should be improved and post-bid audit should be strengthened to increase the difficulty of grey benefit realization. This paper will provide a reference for the prevention and governance of vertical collusion in bidding and tendering.","PeriodicalId":22091,"journal":{"name":"Scientific Programming","volume":"120 24","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-11-14","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Grey Interest Chain Identification and Control Model for Government Investment Engineering Projects Based on Node Identification\",\"authors\":\"Lin Deng, Yaping Wu, Xianjun Chen, Tian Li, Yun Chen\",\"doi\":\"10.1155/2023/3372820\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In the bidding process of government investment engineering projects, collusion between the government and bidders occurs repeatedly, which seriously affects the quality of engineering projects and the effectiveness of the government investment. Therefore, it is necessary to analyze and discuss the collusion between the government and bidders in government investment engineering projects, so as to provide a healthy and sustainable environment for the government investment engineering bidding market. There are two main types of collusion in engineering bidding: horizontal collusion and vertical collusion, and this paper focuses on the vertical collusion process in the engineering bidding process. A conceptual framework of the grey interest chain based on three stages of benefit creation, benefit distribution, and benefit realization was established, 15 major nodes in the grey interest chain were identified, and a grey interest chain control model was constructed, which further identified and classified the nodes into four levels: key nodes, important nodes, general nodes, and unimportant nodes. Finally, through the application of the model in the case, measures such as establishing a cracking mechanism for grey resource integration, increasing the supervision of grey interest chain, and strengthening post-bid audit are proposed. Measures such as including the preparation of bidding documents into the work assessment system and entrusting consulting units or third parties to prepare bidding documents are proposed to establish a crack mechanism for grey resource integration. In the benefit distribution stage, the penalties for the government and the bidders can be appropriately increased, the responsibilities of enterprises and project leaders can be implemented in the system on a reciprocal basis, and a perfect reputation mechanism information can be established. At the stage of benefit realization, the bidding system should be improved and post-bid audit should be strengthened to increase the difficulty of grey benefit realization. This paper will provide a reference for the prevention and governance of vertical collusion in bidding and tendering.\",\"PeriodicalId\":22091,\"journal\":{\"name\":\"Scientific Programming\",\"volume\":\"120 24\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-11-14\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Scientific Programming\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1155/2023/3372820\",\"RegionNum\":4,\"RegionCategory\":\"计算机科学\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"Computer Science\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Scientific Programming","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1155/2023/3372820","RegionNum":4,"RegionCategory":"计算机科学","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"Computer Science","Score":null,"Total":0}
Grey Interest Chain Identification and Control Model for Government Investment Engineering Projects Based on Node Identification
In the bidding process of government investment engineering projects, collusion between the government and bidders occurs repeatedly, which seriously affects the quality of engineering projects and the effectiveness of the government investment. Therefore, it is necessary to analyze and discuss the collusion between the government and bidders in government investment engineering projects, so as to provide a healthy and sustainable environment for the government investment engineering bidding market. There are two main types of collusion in engineering bidding: horizontal collusion and vertical collusion, and this paper focuses on the vertical collusion process in the engineering bidding process. A conceptual framework of the grey interest chain based on three stages of benefit creation, benefit distribution, and benefit realization was established, 15 major nodes in the grey interest chain were identified, and a grey interest chain control model was constructed, which further identified and classified the nodes into four levels: key nodes, important nodes, general nodes, and unimportant nodes. Finally, through the application of the model in the case, measures such as establishing a cracking mechanism for grey resource integration, increasing the supervision of grey interest chain, and strengthening post-bid audit are proposed. Measures such as including the preparation of bidding documents into the work assessment system and entrusting consulting units or third parties to prepare bidding documents are proposed to establish a crack mechanism for grey resource integration. In the benefit distribution stage, the penalties for the government and the bidders can be appropriately increased, the responsibilities of enterprises and project leaders can be implemented in the system on a reciprocal basis, and a perfect reputation mechanism information can be established. At the stage of benefit realization, the bidding system should be improved and post-bid audit should be strengthened to increase the difficulty of grey benefit realization. This paper will provide a reference for the prevention and governance of vertical collusion in bidding and tendering.
期刊介绍:
Scientific Programming is a peer-reviewed, open access journal that provides a meeting ground for research results in, and practical experience with, software engineering environments, tools, languages, and models of computation aimed specifically at supporting scientific and engineering computing.
The journal publishes papers on language, compiler, and programming environment issues for scientific computing. Of particular interest are contributions to programming and software engineering for grid computing, high performance computing, processing very large data sets, supercomputing, visualization, and parallel computing. All languages used in scientific programming as well as scientific programming libraries are within the scope of the journal.