科学深钻孔应力测量运动:工具和方法的重点

IF 0.7 4区 工程技术 Q3 ENGINEERING, PETROLEUM
Jean Desroches, Emilie Peyret, Adriaan Gisolf, Ailsa Wilcox, Mauro Di Giovann`i, Aernout Schram de Jong, Siavash Sepehri, Rodney Garrard, Silvio Giger
{"title":"科学深钻孔应力测量运动:工具和方法的重点","authors":"Jean Desroches, Emilie Peyret, Adriaan Gisolf, Ailsa Wilcox, Mauro Di Giovann`i, Aernout Schram de Jong, Siavash Sepehri, Rodney Garrard, Silvio Giger","doi":"10.30632/pjv64n5-2023a2","DOIUrl":null,"url":null,"abstract":"As part of the Sectoral Plan for Deep Geological Repositories, three potential siting regions are currently being investigated by means of a focused geological exploration program in northern Switzerland. The program involved drilling eight vertical boreholes and one deviated deep borehole with at least two vertical boreholes per siting region. Stress testing was undertaken with a wireline formation testing tool in each borehole (around 20 stress tests per borehole). Improvements in the tool string were introduced step by step to sharpen the range of the stress estimates and enable 100% coverage of the desired lithological column. This is the first time that a single tool string with three packers has been run to perform the complete combination of sleeve fracturing (SF), hydraulic fracturing, and sleeve reopening (SR) tests. A dedicated stress testing protocol was developed to ensure the most robust estimate of the stress in a large variety of formations. A detailed planning process was developed to maximize the success rate and coverage of stress test stations, integrating all available information as it becomes available. A review of the techniques enabled by the new tool string for estimating the closure stress from a stress test, especially in low-permeability formations, is presented, and detailed stress testing examples are provided. A preliminary comparison between the stress estimates for the first two boreholes in the campaign is shown.","PeriodicalId":49703,"journal":{"name":"Petrophysics","volume":null,"pages":null},"PeriodicalIF":0.7000,"publicationDate":"2023-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Stress Measurement Campaign in Scientific Deep Boreholes: Focus on Tools and Methods\",\"authors\":\"Jean Desroches, Emilie Peyret, Adriaan Gisolf, Ailsa Wilcox, Mauro Di Giovann`i, Aernout Schram de Jong, Siavash Sepehri, Rodney Garrard, Silvio Giger\",\"doi\":\"10.30632/pjv64n5-2023a2\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"As part of the Sectoral Plan for Deep Geological Repositories, three potential siting regions are currently being investigated by means of a focused geological exploration program in northern Switzerland. The program involved drilling eight vertical boreholes and one deviated deep borehole with at least two vertical boreholes per siting region. Stress testing was undertaken with a wireline formation testing tool in each borehole (around 20 stress tests per borehole). Improvements in the tool string were introduced step by step to sharpen the range of the stress estimates and enable 100% coverage of the desired lithological column. This is the first time that a single tool string with three packers has been run to perform the complete combination of sleeve fracturing (SF), hydraulic fracturing, and sleeve reopening (SR) tests. A dedicated stress testing protocol was developed to ensure the most robust estimate of the stress in a large variety of formations. A detailed planning process was developed to maximize the success rate and coverage of stress test stations, integrating all available information as it becomes available. A review of the techniques enabled by the new tool string for estimating the closure stress from a stress test, especially in low-permeability formations, is presented, and detailed stress testing examples are provided. A preliminary comparison between the stress estimates for the first two boreholes in the campaign is shown.\",\"PeriodicalId\":49703,\"journal\":{\"name\":\"Petrophysics\",\"volume\":null,\"pages\":null},\"PeriodicalIF\":0.7000,\"publicationDate\":\"2023-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Petrophysics\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.30632/pjv64n5-2023a2\",\"RegionNum\":4,\"RegionCategory\":\"工程技术\",\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"Q3\",\"JCRName\":\"ENGINEERING, PETROLEUM\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Petrophysics","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30632/pjv64n5-2023a2","RegionNum":4,"RegionCategory":"工程技术","ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"Q3","JCRName":"ENGINEERING, PETROLEUM","Score":null,"Total":0}
引用次数: 0

摘要

作为深层地质储存库部门计划的一部分,目前正在瑞士北部通过一项重点地质勘探方案调查三个可能的选址区域。该计划包括钻8个垂直井眼和1个斜井眼,每个定位区域至少有2个垂直井眼。每个井眼使用电缆地层测试工具进行压力测试(每个井眼约20次压力测试)。工具串的改进是逐步引入的,以提高应力估计的范围,并实现对所需岩性柱的100%覆盖。这是第一次使用带有三个封隔器的单个工具串来完成滑套压裂(SF)、水力压裂和滑套重新打开(SR)测试的完整组合。开发了专门的压力测试方案,以确保对各种地层的压力进行最可靠的估计。制定了详细的规划过程,以最大限度地提高压力测试站的成功率和覆盖率,并在可用时整合所有可用信息。本文介绍了新工具串用于估算压力测试中闭合应力的技术,特别是在低渗透地层中,并提供了详细的压力测试实例。图中显示了前两个井眼的应力估计的初步比较。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Stress Measurement Campaign in Scientific Deep Boreholes: Focus on Tools and Methods
As part of the Sectoral Plan for Deep Geological Repositories, three potential siting regions are currently being investigated by means of a focused geological exploration program in northern Switzerland. The program involved drilling eight vertical boreholes and one deviated deep borehole with at least two vertical boreholes per siting region. Stress testing was undertaken with a wireline formation testing tool in each borehole (around 20 stress tests per borehole). Improvements in the tool string were introduced step by step to sharpen the range of the stress estimates and enable 100% coverage of the desired lithological column. This is the first time that a single tool string with three packers has been run to perform the complete combination of sleeve fracturing (SF), hydraulic fracturing, and sleeve reopening (SR) tests. A dedicated stress testing protocol was developed to ensure the most robust estimate of the stress in a large variety of formations. A detailed planning process was developed to maximize the success rate and coverage of stress test stations, integrating all available information as it becomes available. A review of the techniques enabled by the new tool string for estimating the closure stress from a stress test, especially in low-permeability formations, is presented, and detailed stress testing examples are provided. A preliminary comparison between the stress estimates for the first two boreholes in the campaign is shown.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
Petrophysics
Petrophysics 地学-地球化学与地球物理
CiteScore
1.80
自引率
11.10%
发文量
40
审稿时长
>12 weeks
期刊介绍: Petrophysics contains original contributions on theoretical and applied aspects of formation evaluation, including both open hole and cased hole well logging, core analysis and formation testing.
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信