{"title":"减少与时间相关的处理时间的单机调度,以最小化等待时间的总绝对差异","authors":"Dan Wang, Yu-Bin Wu, Ji-Bo Wang, P. Ji","doi":"10.1080/10170669.2012.721211","DOIUrl":null,"url":null,"abstract":"In this article we consider a single-machine scheduling problem with decreasing time-dependent job-processing times. Decreasing time-dependent job-processing times means that its processing time is a non-increasing function of its execution start time. The objective is to find a schedule that minimizes total absolute differences in waiting times. We show that the optimal schedule is V-shaped: jobs are arranged in the descending order of their normal processing times if they are placed before the job with the smallest normal processing time, but in the ascending order of their normal processing times if placed after it. We prove several other properties of an optimal schedule, and introduce two heuristic algorithms that are tested against a lower bound. We also provide computational results to evaluate the performance of the heuristic algorithms.","PeriodicalId":369256,"journal":{"name":"Journal of The Chinese Institute of Industrial Engineers","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Single-machine scheduling with decreasing time-dependent processing times to minimize total absolute differences in waiting times\",\"authors\":\"Dan Wang, Yu-Bin Wu, Ji-Bo Wang, P. Ji\",\"doi\":\"10.1080/10170669.2012.721211\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In this article we consider a single-machine scheduling problem with decreasing time-dependent job-processing times. Decreasing time-dependent job-processing times means that its processing time is a non-increasing function of its execution start time. The objective is to find a schedule that minimizes total absolute differences in waiting times. We show that the optimal schedule is V-shaped: jobs are arranged in the descending order of their normal processing times if they are placed before the job with the smallest normal processing time, but in the ascending order of their normal processing times if placed after it. We prove several other properties of an optimal schedule, and introduce two heuristic algorithms that are tested against a lower bound. We also provide computational results to evaluate the performance of the heuristic algorithms.\",\"PeriodicalId\":369256,\"journal\":{\"name\":\"Journal of The Chinese Institute of Industrial Engineers\",\"volume\":\"4 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Journal of The Chinese Institute of Industrial Engineers\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1080/10170669.2012.721211\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of The Chinese Institute of Industrial Engineers","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1080/10170669.2012.721211","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Single-machine scheduling with decreasing time-dependent processing times to minimize total absolute differences in waiting times
In this article we consider a single-machine scheduling problem with decreasing time-dependent job-processing times. Decreasing time-dependent job-processing times means that its processing time is a non-increasing function of its execution start time. The objective is to find a schedule that minimizes total absolute differences in waiting times. We show that the optimal schedule is V-shaped: jobs are arranged in the descending order of their normal processing times if they are placed before the job with the smallest normal processing time, but in the ascending order of their normal processing times if placed after it. We prove several other properties of an optimal schedule, and introduce two heuristic algorithms that are tested against a lower bound. We also provide computational results to evaluate the performance of the heuristic algorithms.