通过市场模拟考虑传输和发电的资源充足性评估

H. Chao, F. Li
{"title":"通过市场模拟考虑传输和发电的资源充足性评估","authors":"H. Chao, F. Li","doi":"10.1109/PES.2009.5275426","DOIUrl":null,"url":null,"abstract":"Growth in electricity demand with lack of investment in new transmission facilities has led to the formation of load pockets with long congestion hours over transmission bottlenecks. When assessing resource adequacy with reference to the load pockets, one needs to include both generation resources and power delivery systems to capture their impacts on system reliability and market economics at the delivery points. This paper presents a resource adequacy analysis approach to evaluate reliability as well as economic impact in a competitive energy market. Unavailability of generating units and transmission facilities is considered in market simulations to assess the overall adequacy of load-serving ability in a load pocket. Effects of transmission are illustrated through a market simulation analysis of the NYCA system based on publicly available transmission, generation, and demand data.","PeriodicalId":126347,"journal":{"name":"2004 IEEE/PES Transmision and Distribution Conference and Exposition: Latin America (IEEE Cat. No. 04EX956)","volume":"59 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-07-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Resource adequacy assessment considering transmission and generation via market simulations\",\"authors\":\"H. Chao, F. Li\",\"doi\":\"10.1109/PES.2009.5275426\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Growth in electricity demand with lack of investment in new transmission facilities has led to the formation of load pockets with long congestion hours over transmission bottlenecks. When assessing resource adequacy with reference to the load pockets, one needs to include both generation resources and power delivery systems to capture their impacts on system reliability and market economics at the delivery points. This paper presents a resource adequacy analysis approach to evaluate reliability as well as economic impact in a competitive energy market. Unavailability of generating units and transmission facilities is considered in market simulations to assess the overall adequacy of load-serving ability in a load pocket. Effects of transmission are illustrated through a market simulation analysis of the NYCA system based on publicly available transmission, generation, and demand data.\",\"PeriodicalId\":126347,\"journal\":{\"name\":\"2004 IEEE/PES Transmision and Distribution Conference and Exposition: Latin America (IEEE Cat. No. 04EX956)\",\"volume\":\"59 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2009-07-26\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2004 IEEE/PES Transmision and Distribution Conference and Exposition: Latin America (IEEE Cat. No. 04EX956)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/PES.2009.5275426\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2004 IEEE/PES Transmision and Distribution Conference and Exposition: Latin America (IEEE Cat. No. 04EX956)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PES.2009.5275426","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

电力需求的增长,加上缺乏对新输电设施的投资,导致了输电瓶颈导致的长时间拥堵的负荷口袋的形成。在参照负荷口袋评估资源充足性时,需要包括发电资源和电力输送系统,以捕捉它们对输送点的系统可靠性和市场经济的影响。本文提出了一种资源充分性分析方法来评估竞争能源市场中的可靠性和经济影响。在市场模拟中考虑了发电机组和输电设施的不可用性,以评估负荷口袋中负荷服务能力的总体充分性。通过对NYCA系统的市场模拟分析,基于公开可用的传输、发电和需求数据,说明了传输的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Resource adequacy assessment considering transmission and generation via market simulations
Growth in electricity demand with lack of investment in new transmission facilities has led to the formation of load pockets with long congestion hours over transmission bottlenecks. When assessing resource adequacy with reference to the load pockets, one needs to include both generation resources and power delivery systems to capture their impacts on system reliability and market economics at the delivery points. This paper presents a resource adequacy analysis approach to evaluate reliability as well as economic impact in a competitive energy market. Unavailability of generating units and transmission facilities is considered in market simulations to assess the overall adequacy of load-serving ability in a load pocket. Effects of transmission are illustrated through a market simulation analysis of the NYCA system based on publicly available transmission, generation, and demand data.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信