-变压器安装与维护

Troy D. Kabrich
{"title":"-变压器安装与维护","authors":"Troy D. Kabrich","doi":"10.1201/b12110-23","DOIUrl":null,"url":null,"abstract":"Power transformers demand a high degree of care during installation. The large capital investment for the transformer and their importance to the power system demonstrate the need for careful field preparation for service. This chapter will highlight recommendations for the proper receipt, inspection, field assembly, oil processing, acceptance testing, and maintenance of large liquid-immersed power transformers rated 10 MVA or greater or with primary voltage rating of 69 kV and above. Basic transformer field installation and maintenance processes will be reviewed to include receiving inspections, assembly of transformer, field dry out techniques, determination of insulation moisture concentration, provision for cold ambient temperature processing, vacuum filling processes, acceptance testing, maintenance schedules, components maintenance, and oil reconditioning and reclamation. The processes and recommendations introduced may not cover all possible contingencies based upon design, construction, and application of the transformers; therefore, the original equipment manufacturer’s (OEM) instructions may differ from standard industry practice. The manufacturer’s guidelines 22","PeriodicalId":268247,"journal":{"name":"The Electric Power Engineering Handbook - Five Volume Set","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-05-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"- Transformer Installation and Maintenance\",\"authors\":\"Troy D. Kabrich\",\"doi\":\"10.1201/b12110-23\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Power transformers demand a high degree of care during installation. The large capital investment for the transformer and their importance to the power system demonstrate the need for careful field preparation for service. This chapter will highlight recommendations for the proper receipt, inspection, field assembly, oil processing, acceptance testing, and maintenance of large liquid-immersed power transformers rated 10 MVA or greater or with primary voltage rating of 69 kV and above. Basic transformer field installation and maintenance processes will be reviewed to include receiving inspections, assembly of transformer, field dry out techniques, determination of insulation moisture concentration, provision for cold ambient temperature processing, vacuum filling processes, acceptance testing, maintenance schedules, components maintenance, and oil reconditioning and reclamation. The processes and recommendations introduced may not cover all possible contingencies based upon design, construction, and application of the transformers; therefore, the original equipment manufacturer’s (OEM) instructions may differ from standard industry practice. The manufacturer’s guidelines 22\",\"PeriodicalId\":268247,\"journal\":{\"name\":\"The Electric Power Engineering Handbook - Five Volume Set\",\"volume\":\"46 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-05-16\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"The Electric Power Engineering Handbook - Five Volume Set\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1201/b12110-23\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Electric Power Engineering Handbook - Five Volume Set","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1201/b12110-23","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

电力变压器在安装过程中需要高度小心。变压器的巨大投资及其对电力系统的重要性表明,需要仔细的现场准备工作。本章将重点介绍对额定10 MVA或以上或初级额定电压为69 kV及以上的大型液浸式电力变压器的正确接收、检查、现场装配、油处理、验收测试和维护的建议。基本的变压器现场安装和维护过程将进行审查,包括接收检查、变压器组装、现场干燥技术、绝缘湿度浓度的测定、冷环境温度处理的准备、真空填充过程、验收测试、维护时间表、部件维护以及油的修复和回收。所介绍的程序和建议可能不包括基于变压器的设计、建造和应用的所有可能的突发事件;因此,原始设备制造商(OEM)的说明可能与标准行业惯例不同。制造商的指导方针
本文章由计算机程序翻译,如有差异,请以英文原文为准。
- Transformer Installation and Maintenance
Power transformers demand a high degree of care during installation. The large capital investment for the transformer and their importance to the power system demonstrate the need for careful field preparation for service. This chapter will highlight recommendations for the proper receipt, inspection, field assembly, oil processing, acceptance testing, and maintenance of large liquid-immersed power transformers rated 10 MVA or greater or with primary voltage rating of 69 kV and above. Basic transformer field installation and maintenance processes will be reviewed to include receiving inspections, assembly of transformer, field dry out techniques, determination of insulation moisture concentration, provision for cold ambient temperature processing, vacuum filling processes, acceptance testing, maintenance schedules, components maintenance, and oil reconditioning and reclamation. The processes and recommendations introduced may not cover all possible contingencies based upon design, construction, and application of the transformers; therefore, the original equipment manufacturer’s (OEM) instructions may differ from standard industry practice. The manufacturer’s guidelines 22
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信