工程合同纠纷因素的管理及补救建议

I. F. Ibraheem, M. A. A. A. Jaafari, Ahmed Alboabidallah
{"title":"工程合同纠纷因素的管理及补救建议","authors":"I. F. Ibraheem, M. A. A. A. Jaafari, Ahmed Alboabidallah","doi":"10.55529/ijrise.25.19.29","DOIUrl":null,"url":null,"abstract":"Generally, most projects are not completed within time, cost, scope for various reasons, and this is accompanied by the emergence of disputes among the contracting parties. Disputes occurred as a result of failure to define the scope of work accurately by the employer which will be followed by the inaccuracy of the time and the estimated cost of the project, the imbalance of prices submitted by the contractors and the unrealistic data of the project activities schedule and the material supply schedule, the selection of contractors without suitable criteria, non-availability of the required financial allocations within the specified times, lack of integration between technical and legal departments in preparing the draft contract to reach a common opinion, lack of experience of executive or supervisory employees in dealing with disputes that occur during the course of work, which leads to their escalation. Four case studies related to dispute in construction contracts which have been resolved by the court were investigated. Triggers for these disputes were discrepancies in change order evaluation as a result of undefined or an accurate project scope, unsuitable site conditions, double meaning of specifications, design mistakes and excessive contract quantities fluctuation, unavailable financial allocations and the subcontractor's lack of experience on similar projects, as well as the main contractor's lack of expertise and capability are the reasons with importance weighting in these case studies. Therefore, taking proactive steps for the purpose of minimizing these disputes and their negative effects through preparing realistic feasibility studies for projects and allocating sufficient time for these studies, in addition to activate the role of surveying engineers and qualifying them to play their effective role in determining quantities and prices accurately and using specialized engineering programs in addition to modern methods of calculating Project completion rates using Earned Value.","PeriodicalId":263587,"journal":{"name":"International Journal of Research In Science & Engineering","volume":"3 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-09-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Management of Dispute Factors in Engineering Contracts and the Proposed Remedies\",\"authors\":\"I. F. Ibraheem, M. A. A. A. Jaafari, Ahmed Alboabidallah\",\"doi\":\"10.55529/ijrise.25.19.29\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Generally, most projects are not completed within time, cost, scope for various reasons, and this is accompanied by the emergence of disputes among the contracting parties. Disputes occurred as a result of failure to define the scope of work accurately by the employer which will be followed by the inaccuracy of the time and the estimated cost of the project, the imbalance of prices submitted by the contractors and the unrealistic data of the project activities schedule and the material supply schedule, the selection of contractors without suitable criteria, non-availability of the required financial allocations within the specified times, lack of integration between technical and legal departments in preparing the draft contract to reach a common opinion, lack of experience of executive or supervisory employees in dealing with disputes that occur during the course of work, which leads to their escalation. Four case studies related to dispute in construction contracts which have been resolved by the court were investigated. Triggers for these disputes were discrepancies in change order evaluation as a result of undefined or an accurate project scope, unsuitable site conditions, double meaning of specifications, design mistakes and excessive contract quantities fluctuation, unavailable financial allocations and the subcontractor's lack of experience on similar projects, as well as the main contractor's lack of expertise and capability are the reasons with importance weighting in these case studies. Therefore, taking proactive steps for the purpose of minimizing these disputes and their negative effects through preparing realistic feasibility studies for projects and allocating sufficient time for these studies, in addition to activate the role of surveying engineers and qualifying them to play their effective role in determining quantities and prices accurately and using specialized engineering programs in addition to modern methods of calculating Project completion rates using Earned Value.\",\"PeriodicalId\":263587,\"journal\":{\"name\":\"International Journal of Research In Science & Engineering\",\"volume\":\"3 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2022-09-28\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Research In Science & Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.55529/ijrise.25.19.29\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Research In Science & Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.55529/ijrise.25.19.29","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

一般情况下,由于各种原因,大多数项目都不能在时间、成本、范围内完成,而这也伴随着缔约各方之间纠纷的出现。发生纠纷的原因是发包人未能准确确定工作范围,随之而来的是工程的时间和估计费用不准确,承包商提交的价格不平衡,项目活动时间表和材料供应时间表的数据不现实,承包商的选择没有适当的标准,没有在规定的时间内获得所需的财政拨款。在起草合同草案时,技术部门和法律部门之间缺乏整合以达成共同意见,行政或监督人员在处理工作过程中发生的纠纷方面缺乏经验,导致纠纷升级。调查了四个与法院解决的建筑合同纠纷有关的案例研究。这些争议的导火索是由于未定义或准确的项目范围、不合适的现场条件、规格的双重含义、设计错误和合同数量的过度波动、不可获得的财务拨款和分包商缺乏类似项目的经验,以及主承包商缺乏专业知识和能力,这些都是这些案例研究中具有重要权重的原因。因此,采取积极步骤,通过为项目编写切合实际的可行性研究报告和为这些研究分配足够的时间,尽量减少这些争端及其负面影响;除了激活测量工程师的作用,并使他们有资格在确定数量和价格方面发挥有效作用,并使用专业的工程计划,以及使用挣值计算项目完成率的现代方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Management of Dispute Factors in Engineering Contracts and the Proposed Remedies
Generally, most projects are not completed within time, cost, scope for various reasons, and this is accompanied by the emergence of disputes among the contracting parties. Disputes occurred as a result of failure to define the scope of work accurately by the employer which will be followed by the inaccuracy of the time and the estimated cost of the project, the imbalance of prices submitted by the contractors and the unrealistic data of the project activities schedule and the material supply schedule, the selection of contractors without suitable criteria, non-availability of the required financial allocations within the specified times, lack of integration between technical and legal departments in preparing the draft contract to reach a common opinion, lack of experience of executive or supervisory employees in dealing with disputes that occur during the course of work, which leads to their escalation. Four case studies related to dispute in construction contracts which have been resolved by the court were investigated. Triggers for these disputes were discrepancies in change order evaluation as a result of undefined or an accurate project scope, unsuitable site conditions, double meaning of specifications, design mistakes and excessive contract quantities fluctuation, unavailable financial allocations and the subcontractor's lack of experience on similar projects, as well as the main contractor's lack of expertise and capability are the reasons with importance weighting in these case studies. Therefore, taking proactive steps for the purpose of minimizing these disputes and their negative effects through preparing realistic feasibility studies for projects and allocating sufficient time for these studies, in addition to activate the role of surveying engineers and qualifying them to play their effective role in determining quantities and prices accurately and using specialized engineering programs in addition to modern methods of calculating Project completion rates using Earned Value.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信