{"title":"小型生产厂的生产性能建模","authors":"M. Lee, Prashobh Karunakaran, RahmatAidil Djubair, Heng Jong Ngu","doi":"10.22161/IJAEMS.4.6.9","DOIUrl":null,"url":null,"abstract":"This paper is about development of a model to evaluate capacity utilization (CU) of small scale production plants. The model employed short term production function with key independent variables of: plant operators, capital, R&D, energy and machinery maintenance expenditure. CU of small scale plant is the output and dependent variable for this study. The developed model is tested on a small scalewater production plant. The output results show that the average CU is 74% for six months of operations. The model test results revealed that all the inputs are positively correlated (R>0.893) to CU, with major inputs are significantly contributing to CU. About 80% (R2=0.797) of the inputs are consumed to achieve CU of production process. The model estimated value was found to be close to actual recorded outputs (","PeriodicalId":424230,"journal":{"name":"International Journal of Advanced engineering, Management and Science","volume":"215 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Modelling Production Performance of Small Scale Production Plant\",\"authors\":\"M. Lee, Prashobh Karunakaran, RahmatAidil Djubair, Heng Jong Ngu\",\"doi\":\"10.22161/IJAEMS.4.6.9\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This paper is about development of a model to evaluate capacity utilization (CU) of small scale production plants. The model employed short term production function with key independent variables of: plant operators, capital, R&D, energy and machinery maintenance expenditure. CU of small scale plant is the output and dependent variable for this study. The developed model is tested on a small scalewater production plant. The output results show that the average CU is 74% for six months of operations. The model test results revealed that all the inputs are positively correlated (R>0.893) to CU, with major inputs are significantly contributing to CU. About 80% (R2=0.797) of the inputs are consumed to achieve CU of production process. The model estimated value was found to be close to actual recorded outputs (\",\"PeriodicalId\":424230,\"journal\":{\"name\":\"International Journal of Advanced engineering, Management and Science\",\"volume\":\"215 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-06-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"International Journal of Advanced engineering, Management and Science\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.22161/IJAEMS.4.6.9\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Advanced engineering, Management and Science","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22161/IJAEMS.4.6.9","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Modelling Production Performance of Small Scale Production Plant
This paper is about development of a model to evaluate capacity utilization (CU) of small scale production plants. The model employed short term production function with key independent variables of: plant operators, capital, R&D, energy and machinery maintenance expenditure. CU of small scale plant is the output and dependent variable for this study. The developed model is tested on a small scalewater production plant. The output results show that the average CU is 74% for six months of operations. The model test results revealed that all the inputs are positively correlated (R>0.893) to CU, with major inputs are significantly contributing to CU. About 80% (R2=0.797) of the inputs are consumed to achieve CU of production process. The model estimated value was found to be close to actual recorded outputs (