工程公司投资项目实施中业务流程管理问题分析

A. Gurenko, Sergey A. Gurenko
{"title":"工程公司投资项目实施中业务流程管理问题分析","authors":"A. Gurenko, Sergey A. Gurenko","doi":"10.15587/2706-5448.2020.207243","DOIUrl":null,"url":null,"abstract":"The object of research is a business process management system of engineering companies. The paper considers the existing system of interaction between design institutes, engineering companies and manufacturing enterprises implementing investment projects. In particular, the differences in the construction of business processes in previously existing design institutions and modern engineering companies are identified. The research methodology is based on theoretical and methodological analysis of scientific literature, statistical methods, as well as observation, comparative method, description, measurement. The use of scientific research methods has revealed weaknesses and contradictions in the business process management system.<br><br>The results of this research indicate that the development, verification and approval of design and estimate specifications are the main business process of engineering companies. It is proved that these business processes are an integral part of the investment project. Therefore, for the successful implementation of company projects, customers attract a large number of external contracting organizations – design, engineering, construction companies. The increase in the number of participants in the investment process significantly complicates the construction of business processes, which leads to an increase in the timing of development, verification and approval of design and estimate specifications.<br><br>The analysis allows to identify the causes of inconsistencies when working with specification. The main reasons for increasing the verification time are systemic problems in organizing the interaction of project participants. It is determined that the pre-existing holders of archival design specification that provided comprehensive turnkey services have practically disappeared from the market. Contracting organizations appeared in their place, separated from large specialized design organizations. The created contracting organizations work in different versions of the software, therefore they created sets of documents of varying degrees of detail of design decisions. In general, it is recommended to optimize the docking of documents between participants in investment projects. The implementation of the proposed measures becomes possible in the context of the introduction of information technology based on joint teamwork to create an electronic model.","PeriodicalId":285194,"journal":{"name":"IRPN: Innovation & Information Management (Topic)","volume":"150 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Analysis of the Problems of Managing Business Processes of Engineering Companies in the Implementation of Investment Projects\",\"authors\":\"A. Gurenko, Sergey A. Gurenko\",\"doi\":\"10.15587/2706-5448.2020.207243\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The object of research is a business process management system of engineering companies. The paper considers the existing system of interaction between design institutes, engineering companies and manufacturing enterprises implementing investment projects. In particular, the differences in the construction of business processes in previously existing design institutions and modern engineering companies are identified. The research methodology is based on theoretical and methodological analysis of scientific literature, statistical methods, as well as observation, comparative method, description, measurement. The use of scientific research methods has revealed weaknesses and contradictions in the business process management system.<br><br>The results of this research indicate that the development, verification and approval of design and estimate specifications are the main business process of engineering companies. It is proved that these business processes are an integral part of the investment project. Therefore, for the successful implementation of company projects, customers attract a large number of external contracting organizations – design, engineering, construction companies. The increase in the number of participants in the investment process significantly complicates the construction of business processes, which leads to an increase in the timing of development, verification and approval of design and estimate specifications.<br><br>The analysis allows to identify the causes of inconsistencies when working with specification. The main reasons for increasing the verification time are systemic problems in organizing the interaction of project participants. It is determined that the pre-existing holders of archival design specification that provided comprehensive turnkey services have practically disappeared from the market. Contracting organizations appeared in their place, separated from large specialized design organizations. The created contracting organizations work in different versions of the software, therefore they created sets of documents of varying degrees of detail of design decisions. In general, it is recommended to optimize the docking of documents between participants in investment projects. The implementation of the proposed measures becomes possible in the context of the introduction of information technology based on joint teamwork to create an electronic model.\",\"PeriodicalId\":285194,\"journal\":{\"name\":\"IRPN: Innovation & Information Management (Topic)\",\"volume\":\"150 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-06-30\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IRPN: Innovation & Information Management (Topic)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.15587/2706-5448.2020.207243\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IRPN: Innovation & Information Management (Topic)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.15587/2706-5448.2020.207243","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文的研究对象是一个工程公司业务流程管理系统。本文考虑设计院、工程公司和制造企业实施投资项目的现有互动机制。特别是,在以前存在的设计机构和现代工程公司的业务流程的建设的差异被确定。研究方法以科学文献的理论和方法分析、统计方法以及观察法、比较法、描述法、测量法为基础。科学研究方法的运用暴露了业务流程管理系统的弱点和矛盾。研究结果表明,设计和概算规范的制定、审核和批准是工程公司的主要业务流程。事实证明,这些业务流程是投资项目的一个组成部分。因此,为了公司项目的顺利实施,客户吸引了大量的外部承包组织——设计、工程、施工公司。投资过程中参与者数量的增加显著地使业务过程的构建复杂化,这导致开发、验证和批准设计和评估规范的时间增加。分析允许在使用规范时识别不一致的原因。验证时间增加的主要原因是组织项目参与者互动的系统性问题。确定原有的提供全面交钥匙服务的档案设计规范持有人实际上已经从市场上消失。承包组织取代了他们的位置,从大型专业设计组织中分离出来。创建的合同组织在不同版本的软件中工作,因此他们创建了不同程度的设计决策细节的文档集。总的来说,建议优化投资项目参与方之间的文件对接。在采用以联合团队合作为基础的信息技术以创建电子模型的情况下,实施所提议的措施成为可能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Analysis of the Problems of Managing Business Processes of Engineering Companies in the Implementation of Investment Projects
The object of research is a business process management system of engineering companies. The paper considers the existing system of interaction between design institutes, engineering companies and manufacturing enterprises implementing investment projects. In particular, the differences in the construction of business processes in previously existing design institutions and modern engineering companies are identified. The research methodology is based on theoretical and methodological analysis of scientific literature, statistical methods, as well as observation, comparative method, description, measurement. The use of scientific research methods has revealed weaknesses and contradictions in the business process management system.

The results of this research indicate that the development, verification and approval of design and estimate specifications are the main business process of engineering companies. It is proved that these business processes are an integral part of the investment project. Therefore, for the successful implementation of company projects, customers attract a large number of external contracting organizations – design, engineering, construction companies. The increase in the number of participants in the investment process significantly complicates the construction of business processes, which leads to an increase in the timing of development, verification and approval of design and estimate specifications.

The analysis allows to identify the causes of inconsistencies when working with specification. The main reasons for increasing the verification time are systemic problems in organizing the interaction of project participants. It is determined that the pre-existing holders of archival design specification that provided comprehensive turnkey services have practically disappeared from the market. Contracting organizations appeared in their place, separated from large specialized design organizations. The created contracting organizations work in different versions of the software, therefore they created sets of documents of varying degrees of detail of design decisions. In general, it is recommended to optimize the docking of documents between participants in investment projects. The implementation of the proposed measures becomes possible in the context of the introduction of information technology based on joint teamwork to create an electronic model.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信