{"title":"低压电网中客户电表分配阶段的确定:UPGRID项目实现的选择问题","authors":"K. Dobrzyński, Z. Lubośny, J. Klucznik, Radosław Rekowski","doi":"10.1109/ines.2017.8118552","DOIUrl":null,"url":null,"abstract":"The paper presents selected issues on the European UPGRID grant implemented by a consortium of companies from seven European states, including from Poland, on the monitoring and control of low voltage grid using measurement pre-registered data by smart AMI meters. The paper focuses on the issue of lack of information on the assignment of communal meters to individual phases.","PeriodicalId":344933,"journal":{"name":"2017 IEEE 21st International Conference on Intelligent Engineering Systems (INES)","volume":"62 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Identification of the customer meter assignment to phases in LV grid: Selected issues of UPGRID project realization\",\"authors\":\"K. Dobrzyński, Z. Lubośny, J. Klucznik, Radosław Rekowski\",\"doi\":\"10.1109/ines.2017.8118552\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The paper presents selected issues on the European UPGRID grant implemented by a consortium of companies from seven European states, including from Poland, on the monitoring and control of low voltage grid using measurement pre-registered data by smart AMI meters. The paper focuses on the issue of lack of information on the assignment of communal meters to individual phases.\",\"PeriodicalId\":344933,\"journal\":{\"name\":\"2017 IEEE 21st International Conference on Intelligent Engineering Systems (INES)\",\"volume\":\"62 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2017-10-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2017 IEEE 21st International Conference on Intelligent Engineering Systems (INES)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ines.2017.8118552\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 IEEE 21st International Conference on Intelligent Engineering Systems (INES)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ines.2017.8118552","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

本文介绍了由包括波兰在内的七个欧洲国家的公司组成的财团实施的欧洲UPGRID补助金的选定问题,该补助金使用智能AMI仪表的测量预登记数据监测和控制低压电网。本文的重点是缺乏信息的问题,公用仪表分配到个别阶段。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Identification of the customer meter assignment to phases in LV grid: Selected issues of UPGRID project realization
The paper presents selected issues on the European UPGRID grant implemented by a consortium of companies from seven European states, including from Poland, on the monitoring and control of low voltage grid using measurement pre-registered data by smart AMI meters. The paper focuses on the issue of lack of information on the assignment of communal meters to individual phases.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信