大型开发项目的适应性管理

M.W. Siddiqee
{"title":"大型开发项目的适应性管理","authors":"M.W. Siddiqee","doi":"10.1109/IEMC.1990.201277","DOIUrl":null,"url":null,"abstract":"The author discusses the planning, monitoring, and revising of project schedules with reference to a large and complex database development project. A Simple yet effective methodology for managing such projects successfully in an adaptive and flexible manner is presented. A simple computer program developed in house and a standard graphic software package were used on a weakly basis to product summary reports and graphical charts that provided crucial information about and yielded valuable insights into the performance of the project. The fast, low-cost computer program was used also to conduct 'what if' studies both for planning purposes and for comparison of alternatives whenever modification or corrective actions became necessary during the life cycle of the project. Though the analytical tools and computer aids were simple, they provided the essential information needed by managers and supervisors to manage the project effectively.<<ETX>>","PeriodicalId":235761,"journal":{"name":"IEEE International Conference on Engineering Management, Gaining the Competitive Advantage","volume":"591 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1990-10-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Adaptive management of large development projects\",\"authors\":\"M.W. Siddiqee\",\"doi\":\"10.1109/IEMC.1990.201277\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The author discusses the planning, monitoring, and revising of project schedules with reference to a large and complex database development project. A Simple yet effective methodology for managing such projects successfully in an adaptive and flexible manner is presented. A simple computer program developed in house and a standard graphic software package were used on a weakly basis to product summary reports and graphical charts that provided crucial information about and yielded valuable insights into the performance of the project. The fast, low-cost computer program was used also to conduct 'what if' studies both for planning purposes and for comparison of alternatives whenever modification or corrective actions became necessary during the life cycle of the project. Though the analytical tools and computer aids were simple, they provided the essential information needed by managers and supervisors to manage the project effectively.<<ETX>>\",\"PeriodicalId\":235761,\"journal\":{\"name\":\"IEEE International Conference on Engineering Management, Gaining the Competitive Advantage\",\"volume\":\"591 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1990-10-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IEEE International Conference on Engineering Management, Gaining the Competitive Advantage\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IEMC.1990.201277\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE International Conference on Engineering Management, Gaining the Competitive Advantage","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IEMC.1990.201277","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

作者以一个大型复杂的数据库开发项目为例,讨论了项目进度的规划、监控和修订。提出了一种简单而有效的方法,以适应和灵活的方式成功地管理这些项目。内部开发的一个简单的计算机程序和一个标准的图形软件包在弱基础上用于产品总结报告和图形图表,这些图表提供了关于项目绩效的关键信息并产生了有价值的见解。这个快速、低成本的计算机程序还被用于进行“假设”研究,既用于计划目的,也用于在项目生命周期中需要进行修改或纠正措施时对备选方案进行比较。虽然分析工具和计算机辅助工具很简单,但它们提供了经理和主管有效管理项目所需的基本信息
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Adaptive management of large development projects
The author discusses the planning, monitoring, and revising of project schedules with reference to a large and complex database development project. A Simple yet effective methodology for managing such projects successfully in an adaptive and flexible manner is presented. A simple computer program developed in house and a standard graphic software package were used on a weakly basis to product summary reports and graphical charts that provided crucial information about and yielded valuable insights into the performance of the project. The fast, low-cost computer program was used also to conduct 'what if' studies both for planning purposes and for comparison of alternatives whenever modification or corrective actions became necessary during the life cycle of the project. Though the analytical tools and computer aids were simple, they provided the essential information needed by managers and supervisors to manage the project effectively.<>
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信