{"title":"PJSC Gazprom Neft多级水平井重复压裂","authors":"A. Ogorodov, A. Ostashuk, S. Barkalov","doi":"10.2118/191705-18RPTC-MS","DOIUrl":null,"url":null,"abstract":"Since 2011 most newly commissioned wells at Gazprom Neft fields are horizontal (Hz), subjected to multi-stage hydraulic fracturing (multi-stage frac). To date, about 1,300 horizontal wells with multi-stage frac, equipped with packer-port liner assemblies (non-cemented), ball- activated, including about 800 wells equipped with single-action fracturing collars, have been drilled at the Company's fields.","PeriodicalId":242965,"journal":{"name":"Day 2 Tue, October 16, 2018","volume":"36 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Refracturing of Multistage Horizontal Wells in PJSC Gazprom Neft\",\"authors\":\"A. Ogorodov, A. Ostashuk, S. Barkalov\",\"doi\":\"10.2118/191705-18RPTC-MS\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Since 2011 most newly commissioned wells at Gazprom Neft fields are horizontal (Hz), subjected to multi-stage hydraulic fracturing (multi-stage frac). To date, about 1,300 horizontal wells with multi-stage frac, equipped with packer-port liner assemblies (non-cemented), ball- activated, including about 800 wells equipped with single-action fracturing collars, have been drilled at the Company's fields.\",\"PeriodicalId\":242965,\"journal\":{\"name\":\"Day 2 Tue, October 16, 2018\",\"volume\":\"36 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2018-10-15\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Day 2 Tue, October 16, 2018\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2118/191705-18RPTC-MS\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, October 16, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/191705-18RPTC-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Refracturing of Multistage Horizontal Wells in PJSC Gazprom Neft
Since 2011 most newly commissioned wells at Gazprom Neft fields are horizontal (Hz), subjected to multi-stage hydraulic fracturing (multi-stage frac). To date, about 1,300 horizontal wells with multi-stage frac, equipped with packer-port liner assemblies (non-cemented), ball- activated, including about 800 wells equipped with single-action fracturing collars, have been drilled at the Company's fields.