{"title":"含碳估算方法的比较","authors":"N. Rodrigo, S. Perera, S. Senaratne, X. Jin","doi":"10.31705/wcs.2023.30","DOIUrl":null,"url":null,"abstract":"The Australian building sector contributes up to 36% of carbon emissions emphasising the importance of carbon management. Embodied Carbon (EC) and Operational Carbon (OC) are classified as two main types of carbon emissions in buildings. Zero carbon projects have gained popularity nowadays where OC is reduced to zero, which enables EC to increase. The focus should have been to reduce overall emissions. The current EC estimating databases and tools could result in inaccurate EC estimates due to various reasons, such as different system boundaries, different geographical locations, lack of standardisation and so forth. To address prevailing shortfalls, a new methodology, Supply Chain based Embodied carbon Estimating Method (SCEEM), has been introduced. This study aims at comparing EC estimates prepared using SCEEM against existing carbon estimating databases/tools. A case study was selected to collect data and estimate EC using SCEEM as well as selected database, Blackbook, and tool, eToolLCD. The results indicated that the EC estimates prepared for the case study was quite high in the selected database/tool compared to the EC values of SCEEM. The percentage difference between SCEEM vs Blackbook and SCEEM vs eToolLCD, was more than 50% for most of the items within the collected data set. The first principles-based methodology considered in SCEEM ensures the accuracy and consistency of estimates prepared using SCEEM.","PeriodicalId":221447,"journal":{"name":"11th World Construction Symposium - 2023","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Comparison of embodied carbon estimating methods\",\"authors\":\"N. Rodrigo, S. Perera, S. Senaratne, X. Jin\",\"doi\":\"10.31705/wcs.2023.30\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The Australian building sector contributes up to 36% of carbon emissions emphasising the importance of carbon management. Embodied Carbon (EC) and Operational Carbon (OC) are classified as two main types of carbon emissions in buildings. Zero carbon projects have gained popularity nowadays where OC is reduced to zero, which enables EC to increase. The focus should have been to reduce overall emissions. The current EC estimating databases and tools could result in inaccurate EC estimates due to various reasons, such as different system boundaries, different geographical locations, lack of standardisation and so forth. To address prevailing shortfalls, a new methodology, Supply Chain based Embodied carbon Estimating Method (SCEEM), has been introduced. This study aims at comparing EC estimates prepared using SCEEM against existing carbon estimating databases/tools. A case study was selected to collect data and estimate EC using SCEEM as well as selected database, Blackbook, and tool, eToolLCD. The results indicated that the EC estimates prepared for the case study was quite high in the selected database/tool compared to the EC values of SCEEM. The percentage difference between SCEEM vs Blackbook and SCEEM vs eToolLCD, was more than 50% for most of the items within the collected data set. The first principles-based methodology considered in SCEEM ensures the accuracy and consistency of estimates prepared using SCEEM.\",\"PeriodicalId\":221447,\"journal\":{\"name\":\"11th World Construction Symposium - 2023\",\"volume\":\"19 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2023-07-21\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"11th World Construction Symposium - 2023\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.31705/wcs.2023.30\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"11th World Construction Symposium - 2023","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.31705/wcs.2023.30","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

澳大利亚建筑部门贡献了高达36%的碳排放量,强调了碳管理的重要性。隐含碳(EC)和操作碳(OC)被分类为建筑物中两种主要的碳排放类型。如今,零碳项目越来越受欢迎,碳排放减少到零,这使得碳排放增加。重点应该放在减少总排放量上。由于不同的系统边界、不同的地理位置、缺乏标准化等原因,现有的EC估算数据库和工具可能导致EC估算不准确。为了解决普遍存在的不足,引入了一种新的方法,基于供应链的隐含碳估算方法(SCEEM)。本研究旨在比较利用SCEEM编制的碳排放估算与现有的碳估算数据库/工具。选择一个案例研究来收集数据并使用SCEEM以及选定的数据库Blackbook和工具eToolLCD来估计EC。结果表明,与SCEEM的EC值相比,为案例研究准备的EC估计值在选定的数据库/工具中相当高。在收集的数据集中,SCEEM与Blackbook和SCEEM与eToolLCD之间的百分比差异超过50%。在SCEEM中考虑的第一种基于原则的方法确保了使用SCEEM编制的估计的准确性和一致性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Comparison of embodied carbon estimating methods
The Australian building sector contributes up to 36% of carbon emissions emphasising the importance of carbon management. Embodied Carbon (EC) and Operational Carbon (OC) are classified as two main types of carbon emissions in buildings. Zero carbon projects have gained popularity nowadays where OC is reduced to zero, which enables EC to increase. The focus should have been to reduce overall emissions. The current EC estimating databases and tools could result in inaccurate EC estimates due to various reasons, such as different system boundaries, different geographical locations, lack of standardisation and so forth. To address prevailing shortfalls, a new methodology, Supply Chain based Embodied carbon Estimating Method (SCEEM), has been introduced. This study aims at comparing EC estimates prepared using SCEEM against existing carbon estimating databases/tools. A case study was selected to collect data and estimate EC using SCEEM as well as selected database, Blackbook, and tool, eToolLCD. The results indicated that the EC estimates prepared for the case study was quite high in the selected database/tool compared to the EC values of SCEEM. The percentage difference between SCEEM vs Blackbook and SCEEM vs eToolLCD, was more than 50% for most of the items within the collected data set. The first principles-based methodology considered in SCEEM ensures the accuracy and consistency of estimates prepared using SCEEM.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
CiteScore
0.40
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信