{"title":"杜伊斯堡莱茵河上新纽恩坎普公路桥安装工程的设计与实施","authors":"P. Herrmann, G. Dorrer, Sascha Grubmüller, Johannes Eitelberger","doi":"10.2749/istanbul.2023.0591","DOIUrl":null,"url":null,"abstract":"The existing six-lane highway bridge, which crosses the Rhine River between Duisburg-Neuenkamp and Homberg, was originally opened to traffic in 1970. Due to increased traffic loads and severe fatigue damage it now needs to be replaced. The new design consists of two similar cable-stayed steel superstructures, each carrying four lanes. It has an overall length of 802 m, an overall width of almost 70 m, pylons of 90 m in height, and a central span of 380 m. The installation of the superstructure comprises incremental launching of the approaches, crane assembly of the pylons, and the cantilevered assembly method of the central span. Additionally, the requirement to maintain vehicular traffic on the A40 highway during the construction phase demands transversal launching of the southern bridge structure by 14.4 m after completion. This paper covers the design and implementation of the installation works of the steel structures on site.","PeriodicalId":237396,"journal":{"name":"IABSE Symposium, Istanbul 2023: Long Span Bridges","volume":"115 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Design and Implementation of Installation Works on the New Neuenkamp Highway Bridge over the Rhine in Duisburg\",\"authors\":\"P. Herrmann, G. Dorrer, Sascha Grubmüller, Johannes Eitelberger\",\"doi\":\"10.2749/istanbul.2023.0591\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The existing six-lane highway bridge, which crosses the Rhine River between Duisburg-Neuenkamp and Homberg, was originally opened to traffic in 1970. Due to increased traffic loads and severe fatigue damage it now needs to be replaced. The new design consists of two similar cable-stayed steel superstructures, each carrying four lanes. It has an overall length of 802 m, an overall width of almost 70 m, pylons of 90 m in height, and a central span of 380 m. The installation of the superstructure comprises incremental launching of the approaches, crane assembly of the pylons, and the cantilevered assembly method of the central span. Additionally, the requirement to maintain vehicular traffic on the A40 highway during the construction phase demands transversal launching of the southern bridge structure by 14.4 m after completion. This paper covers the design and implementation of the installation works of the steel structures on site.\",\"PeriodicalId\":237396,\"journal\":{\"name\":\"IABSE Symposium, Istanbul 2023: Long Span Bridges\",\"volume\":\"115 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IABSE Symposium, Istanbul 2023: Long Span Bridges\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2749/istanbul.2023.0591\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IABSE Symposium, Istanbul 2023: Long Span Bridges","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2749/istanbul.2023.0591","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

现有的六车道公路桥横跨莱茵河,连接杜伊斯堡-纽恩坎普和洪堡,最初于1970年通车。由于增加的交通负荷和严重的疲劳损坏,它现在需要更换。新的设计包括两个类似的斜拉钢上部结构,每个承载四个车道。它的总长度为802米,总宽度近70米,塔架高90米,中心跨度380米。上层建筑的安装包括进路的增量下水、塔架的吊车装配和中央跨距的悬臂式装配方法。此外,为了在施工阶段保持A40高速公路上的车辆通行,要求在完工后将南桥结构横向启动14.4米。本文介绍了钢结构现场安装工程的设计与实施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Design and Implementation of Installation Works on the New Neuenkamp Highway Bridge over the Rhine in Duisburg
The existing six-lane highway bridge, which crosses the Rhine River between Duisburg-Neuenkamp and Homberg, was originally opened to traffic in 1970. Due to increased traffic loads and severe fatigue damage it now needs to be replaced. The new design consists of two similar cable-stayed steel superstructures, each carrying four lanes. It has an overall length of 802 m, an overall width of almost 70 m, pylons of 90 m in height, and a central span of 380 m. The installation of the superstructure comprises incremental launching of the approaches, crane assembly of the pylons, and the cantilevered assembly method of the central span. Additionally, the requirement to maintain vehicular traffic on the A40 highway during the construction phase demands transversal launching of the southern bridge structure by 14.4 m after completion. This paper covers the design and implementation of the installation works of the steel structures on site.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信