{"title":"基于报贩法的电力市场日前实时竞价策略研究","authors":"Z. Wan, Heng Fan","doi":"10.1109/ISME.2010.131","DOIUrl":null,"url":null,"abstract":"The electrical power system has the uncertainty in its operation process, from this brings the demand forecast can with actual demand existence certain deviation. The balanced from the electricity generation and the load demand may brought to be, by using of the day-ahead and real-time electricity market transaction mechanism and the demand real-time adjustment electricity generation. At the same time, to manifest the demand-side fully in the market competition function, a revised bidding strategy was studied for the demand-side under the day-ahead and real-time market, making use of two stage decision method of the newsvendor problem. The example had indicated this method had feasible.","PeriodicalId":348878,"journal":{"name":"2010 International Conference of Information Science and Management Engineering","volume":"36 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-08-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"6","resultStr":"{\"title\":\"Bidding Strategy for Day-Ahead and Real-Time Markets Based on Newsvendor Method in Electricity Markets\",\"authors\":\"Z. Wan, Heng Fan\",\"doi\":\"10.1109/ISME.2010.131\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"The electrical power system has the uncertainty in its operation process, from this brings the demand forecast can with actual demand existence certain deviation. The balanced from the electricity generation and the load demand may brought to be, by using of the day-ahead and real-time electricity market transaction mechanism and the demand real-time adjustment electricity generation. At the same time, to manifest the demand-side fully in the market competition function, a revised bidding strategy was studied for the demand-side under the day-ahead and real-time market, making use of two stage decision method of the newsvendor problem. The example had indicated this method had feasible.\",\"PeriodicalId\":348878,\"journal\":{\"name\":\"2010 International Conference of Information Science and Management Engineering\",\"volume\":\"36 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2010-08-07\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"6\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2010 International Conference of Information Science and Management Engineering\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISME.2010.131\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 International Conference of Information Science and Management Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISME.2010.131","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 6

摘要

电力系统在其运行过程中具有不确定性,由此带来的需求预测会与实际需求存在一定的偏差。利用日前实时电力市场交易机制和需求实时调节发电,可以实现发电量与负荷需求的平衡。同时,为了在市场竞争函数中充分体现需求方,利用报摊问题的两阶段决策方法,研究了日前实时市场下需求方的修正竞价策略。算例表明该方法是可行的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Bidding Strategy for Day-Ahead and Real-Time Markets Based on Newsvendor Method in Electricity Markets
The electrical power system has the uncertainty in its operation process, from this brings the demand forecast can with actual demand existence certain deviation. The balanced from the electricity generation and the load demand may brought to be, by using of the day-ahead and real-time electricity market transaction mechanism and the demand real-time adjustment electricity generation. At the same time, to manifest the demand-side fully in the market competition function, a revised bidding strategy was studied for the demand-side under the day-ahead and real-time market, making use of two stage decision method of the newsvendor problem. The example had indicated this method had feasible.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信