{"title":"合同裁决","authors":"The Rt Hon. Lord Justice Coulson","doi":"10.1093/oso/9780198822110.003.0007","DOIUrl":null,"url":null,"abstract":"Part II of the Housing Grants (Construction and Regeneration) Act 1996 (‘the 1996 Act’), as amended, requires all construction contracts to have an adjudication procedure that complies with s108: see s108(5). The same section makes plain that if the construction contract in question does not contain adjudication provisions that comply with s108(1)–(4), then the Scheme for Construction Contracts will apply. It is therefore envisaged that the construction contract will include its own adjudication provisions.","PeriodicalId":434490,"journal":{"name":"Coulson on Construction Adjudication","volume":"61 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Contractual Adjudication\",\"authors\":\"The Rt Hon. Lord Justice Coulson\",\"doi\":\"10.1093/oso/9780198822110.003.0007\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Part II of the Housing Grants (Construction and Regeneration) Act 1996 (‘the 1996 Act’), as amended, requires all construction contracts to have an adjudication procedure that complies with s108: see s108(5). The same section makes plain that if the construction contract in question does not contain adjudication provisions that comply with s108(1)–(4), then the Scheme for Construction Contracts will apply. It is therefore envisaged that the construction contract will include its own adjudication provisions.\",\"PeriodicalId\":434490,\"journal\":{\"name\":\"Coulson on Construction Adjudication\",\"volume\":\"61 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2020-12-18\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"Coulson on Construction Adjudication\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1093/oso/9780198822110.003.0007\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"Coulson on Construction Adjudication","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1093/oso/9780198822110.003.0007","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
摘要
经修订的《1996 年住房补贴(建筑与重建)法案》("《1996 年法案》")第 II 部分要求所有建筑合同都必须包含符合第 108 条规定的裁决程序:参见第 108(5)条。该条明确规定,如果有关建筑合同未包含符合第 108(1)-(4) 条规定的裁决条款,则将适用《建筑合同计划》。因此,预计建筑合同将包含自己的裁决条款。
Part II of the Housing Grants (Construction and Regeneration) Act 1996 (‘the 1996 Act’), as amended, requires all construction contracts to have an adjudication procedure that complies with s108: see s108(5). The same section makes plain that if the construction contract in question does not contain adjudication provisions that comply with s108(1)–(4), then the Scheme for Construction Contracts will apply. It is therefore envisaged that the construction contract will include its own adjudication provisions.