{"title":"台湾大型海上风电场互联点之选择","authors":"Yuan-Kang Wu, Ching-Yin Lee, Chih-Ju Chou, Wei-Ming Liao","doi":"10.1109/CACS.2013.6734175","DOIUrl":null,"url":null,"abstract":"Taiwan is developing the renewable energy actively, in which the wind energy is seen as one of the important resources. However, the suitable locations for wind farm constructions are less on the shore, and the trend of wind farm development in the near future will toward to offshore where the installation capacity of the wind farm could reach hundreds of megawatts. In this work, the choice of interconnected point of the large-scale offshore wind farm to the grid is investigated by using simulation analyses, in which the installation capacity of the offshore wind farm is assumed 864MW. The interconnected point is chosen on the extra-high voltage bus in the west coast of Taiwan. The short circuit current, short circuit capacity, and short circuit ratio (SCR) are used to determine the interconnected points. Besides, the impact of wind speed variation (gust, ramp-up, and ramp-down) on the voltage was also analyzed.","PeriodicalId":186492,"journal":{"name":"2013 CACS International Automatic Control Conference (CACS)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":"{\"title\":\"Choice of interconnected points for large-scale offshore wind farms in Taiwan\",\"authors\":\"Yuan-Kang Wu, Ching-Yin Lee, Chih-Ju Chou, Wei-Ming Liao\",\"doi\":\"10.1109/CACS.2013.6734175\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Taiwan is developing the renewable energy actively, in which the wind energy is seen as one of the important resources. However, the suitable locations for wind farm constructions are less on the shore, and the trend of wind farm development in the near future will toward to offshore where the installation capacity of the wind farm could reach hundreds of megawatts. In this work, the choice of interconnected point of the large-scale offshore wind farm to the grid is investigated by using simulation analyses, in which the installation capacity of the offshore wind farm is assumed 864MW. The interconnected point is chosen on the extra-high voltage bus in the west coast of Taiwan. The short circuit current, short circuit capacity, and short circuit ratio (SCR) are used to determine the interconnected points. Besides, the impact of wind speed variation (gust, ramp-up, and ramp-down) on the voltage was also analyzed.\",\"PeriodicalId\":186492,\"journal\":{\"name\":\"2013 CACS International Automatic Control Conference (CACS)\",\"volume\":\"1 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2013-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"2\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2013 CACS International Automatic Control Conference (CACS)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/CACS.2013.6734175\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 CACS International Automatic Control Conference (CACS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CACS.2013.6734175","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

摘要

台湾正在积极发展可再生能源,其中风能被视为重要资源之一。然而,适合建设风电场的地点在岸上较少,在不久的将来,风力发电场的发展趋势将向海上发展,风力发电场的装机容量可以达到数百兆瓦。本文采用仿真分析的方法,对大型海上风电场的并网点选择进行了研究,假设海上风电场的装机容量为864MW。互联点选在台湾西海岸的特高压母线上。用短路电流、短路容量和短路比(SCR)来确定连接点。此外,还分析了风速变化(阵风、上升和下降)对电压的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Choice of interconnected points for large-scale offshore wind farms in Taiwan
Taiwan is developing the renewable energy actively, in which the wind energy is seen as one of the important resources. However, the suitable locations for wind farm constructions are less on the shore, and the trend of wind farm development in the near future will toward to offshore where the installation capacity of the wind farm could reach hundreds of megawatts. In this work, the choice of interconnected point of the large-scale offshore wind farm to the grid is investigated by using simulation analyses, in which the installation capacity of the offshore wind farm is assumed 864MW. The interconnected point is chosen on the extra-high voltage bus in the west coast of Taiwan. The short circuit current, short circuit capacity, and short circuit ratio (SCR) are used to determine the interconnected points. Besides, the impact of wind speed variation (gust, ramp-up, and ramp-down) on the voltage was also analyzed.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信