{"title":"安全系统具有无害的第一故障:完整的医疗it系统","authors":"G. Parise, C. Mazzetti, L. Parise, F. Fiamingo","doi":"10.1109/IAS.2014.6978479","DOIUrl":null,"url":null,"abstract":"In electrical power systems, such as data centers and hospitals, where service continuity is essential, the electrical operation management must be organized and it is necessary to have an emergency response team available at all times (24/7). In hospitals, for instance, doctors, surgeons, administrators, medical devices are rightly at the forefront, but electrical and technological systems and team of technicians are wrongly considered as ancillaries. The paper emphasizes the importance of the Business Continuity Management (BCM) and highlights how IT-M systems have not to carry out power outage for fault both due to overcurrent and also due to overvoltage. When a fault occurs during a surgical operation, the protection system shall include a count-down time so that emergency response team must solve the problem before the system collapses.","PeriodicalId":446068,"journal":{"name":"2014 IEEE Industry Application Society Annual Meeting","volume":"33 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":"{\"title\":\"Safety system with harmless first fault: Complete & medical IT-system\",\"authors\":\"G. Parise, C. Mazzetti, L. Parise, F. Fiamingo\",\"doi\":\"10.1109/IAS.2014.6978479\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In electrical power systems, such as data centers and hospitals, where service continuity is essential, the electrical operation management must be organized and it is necessary to have an emergency response team available at all times (24/7). In hospitals, for instance, doctors, surgeons, administrators, medical devices are rightly at the forefront, but electrical and technological systems and team of technicians are wrongly considered as ancillaries. The paper emphasizes the importance of the Business Continuity Management (BCM) and highlights how IT-M systems have not to carry out power outage for fault both due to overcurrent and also due to overvoltage. When a fault occurs during a surgical operation, the protection system shall include a count-down time so that emergency response team must solve the problem before the system collapses.\",\"PeriodicalId\":446068,\"journal\":{\"name\":\"2014 IEEE Industry Application Society Annual Meeting\",\"volume\":\"33 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2014-12-08\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"1\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2014 IEEE Industry Application Society Annual Meeting\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/IAS.2014.6978479\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE Industry Application Society Annual Meeting","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IAS.2014.6978479","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

摘要

在电力系统中,如数据中心和医院,其服务连续性至关重要,必须组织电气操作管理,并有必要随时(24/7)配备应急响应小组。例如,在医院里,医生、外科医生、管理人员、医疗设备理所当然地处于最前沿,但电气和技术系统以及技术人员团队却被错误地认为是辅助设备。本文强调了业务连续性管理(BCM)的重要性,并强调了IT-M系统如何不因过流和过压故障而断电。当外科手术中发生故障时,保护系统应包括倒计时时间,以便应急响应小组在系统崩溃之前解决问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Safety system with harmless first fault: Complete & medical IT-system
In electrical power systems, such as data centers and hospitals, where service continuity is essential, the electrical operation management must be organized and it is necessary to have an emergency response team available at all times (24/7). In hospitals, for instance, doctors, surgeons, administrators, medical devices are rightly at the forefront, but electrical and technological systems and team of technicians are wrongly considered as ancillaries. The paper emphasizes the importance of the Business Continuity Management (BCM) and highlights how IT-M systems have not to carry out power outage for fault both due to overcurrent and also due to overvoltage. When a fault occurs during a surgical operation, the protection system shall include a count-down time so that emergency response team must solve the problem before the system collapses.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信