{"title":"基于粒子群优化的发电机重调度缓解拥塞","authors":"S. Deb, A. Goswami","doi":"10.1109/ICPEN.2012.6492332","DOIUrl":null,"url":null,"abstract":"In a deregulated electricity market, transmission congestion results in break system security and increase system cost. Congestion in the transmission lines is one of the technical problems that appear particularly in the deregulated environment. One of the important tasks of Independent System Operator (ISO) is congestion free power system in a deregulated era. Generator rescheduling is one of the techniques adopted by ISO to mitigate transmission congestion in a deregulated electricity market. Rescheduling is done in an Optimal Power Flow (OPF) framework to minimize the overall congestion relief cost. Firstly, generators are chosen based on their generator sensitivity factor (GSF). Secondly, Particle Swarm Optimization is used for rescheduling those selected generators. The proposed algorithm is applied on IEEE 39 Bus New England test system.","PeriodicalId":336723,"journal":{"name":"2012 1st International Conference on Power and Energy in NERIST (ICPEN)","volume":"271 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":"{\"title\":\"Mitigation of congestion by generator rescheduling using Particle Swarm Optimization\",\"authors\":\"S. Deb, A. Goswami\",\"doi\":\"10.1109/ICPEN.2012.6492332\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"In a deregulated electricity market, transmission congestion results in break system security and increase system cost. Congestion in the transmission lines is one of the technical problems that appear particularly in the deregulated environment. One of the important tasks of Independent System Operator (ISO) is congestion free power system in a deregulated era. Generator rescheduling is one of the techniques adopted by ISO to mitigate transmission congestion in a deregulated electricity market. Rescheduling is done in an Optimal Power Flow (OPF) framework to minimize the overall congestion relief cost. Firstly, generators are chosen based on their generator sensitivity factor (GSF). Secondly, Particle Swarm Optimization is used for rescheduling those selected generators. The proposed algorithm is applied on IEEE 39 Bus New England test system.\",\"PeriodicalId\":336723,\"journal\":{\"name\":\"2012 1st International Conference on Power and Energy in NERIST (ICPEN)\",\"volume\":\"271 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2012-12-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"13\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2012 1st International Conference on Power and Energy in NERIST (ICPEN)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ICPEN.2012.6492332\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 1st International Conference on Power and Energy in NERIST (ICPEN)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPEN.2012.6492332","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
Mitigation of congestion by generator rescheduling using Particle Swarm Optimization
In a deregulated electricity market, transmission congestion results in break system security and increase system cost. Congestion in the transmission lines is one of the technical problems that appear particularly in the deregulated environment. One of the important tasks of Independent System Operator (ISO) is congestion free power system in a deregulated era. Generator rescheduling is one of the techniques adopted by ISO to mitigate transmission congestion in a deregulated electricity market. Rescheduling is done in an Optimal Power Flow (OPF) framework to minimize the overall congestion relief cost. Firstly, generators are chosen based on their generator sensitivity factor (GSF). Secondly, Particle Swarm Optimization is used for rescheduling those selected generators. The proposed algorithm is applied on IEEE 39 Bus New England test system.