{"title":"围桩结构基坑施工对索道的扰动规律研究","authors":"Zhiguo Duan, Qian Li, Kaixuan Zhang, Wenjiang Li","doi":"10.1109/ISTTCA53489.2021.9654664","DOIUrl":null,"url":null,"abstract":"Based on the engineering geological conditions of Shijiazhuang city, this paper analyzes the impact of foundation pit construction of pile enclosing structure on the horizontal deformation of the piles and ground settlement, and the deformation and structural internal force on the adjacent cable tunnel. Based on the above, the influence of the distance between foundation pit and tunnel on the deformation and safety of cable tunnels are also discussed. The research results show that the surface settlement on the side with tunnel is less than that without tunnel after the excavation of the foundation pit. The longitudinal stress of the cable tunnel structure is the main factor to the safety of the structure, and the maximum longitudinal tensile stress is located the tunnel wall foot far away from the foundation pit. There existing no-linear increasing relationship between the distance and the safety factor of the cable tunnel.","PeriodicalId":383266,"journal":{"name":"2021 4th International Symposium on Traffic Transportation and Civil Architecture (ISTTCA)","volume":"32 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Research on the Disturbance Law on the Cable Tunnel Induced by the Foundation Pit Construction of Pile Enclosing Structure\",\"authors\":\"Zhiguo Duan, Qian Li, Kaixuan Zhang, Wenjiang Li\",\"doi\":\"10.1109/ISTTCA53489.2021.9654664\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"Based on the engineering geological conditions of Shijiazhuang city, this paper analyzes the impact of foundation pit construction of pile enclosing structure on the horizontal deformation of the piles and ground settlement, and the deformation and structural internal force on the adjacent cable tunnel. Based on the above, the influence of the distance between foundation pit and tunnel on the deformation and safety of cable tunnels are also discussed. The research results show that the surface settlement on the side with tunnel is less than that without tunnel after the excavation of the foundation pit. The longitudinal stress of the cable tunnel structure is the main factor to the safety of the structure, and the maximum longitudinal tensile stress is located the tunnel wall foot far away from the foundation pit. There existing no-linear increasing relationship between the distance and the safety factor of the cable tunnel.\",\"PeriodicalId\":383266,\"journal\":{\"name\":\"2021 4th International Symposium on Traffic Transportation and Civil Architecture (ISTTCA)\",\"volume\":\"32 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"2021-11-12\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"2021 4th International Symposium on Traffic Transportation and Civil Architecture (ISTTCA)\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.1109/ISTTCA53489.2021.9654664\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 4th International Symposium on Traffic Transportation and Civil Architecture (ISTTCA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISTTCA53489.2021.9654664","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

本文结合石家庄市的工程地质条件,分析围桩结构基坑施工对桩的水平变形和地面沉降的影响,以及对相邻电缆隧道的变形和结构内力的影响。在此基础上,讨论了基坑与隧道间距对电缆隧道变形和安全的影响。研究结果表明:基坑开挖后,有隧道一侧地表沉降小于无隧道一侧地表沉降。缆索隧道结构的纵向应力是影响结构安全的主要因素,而最大的纵向拉应力位于远离基坑的隧道壁脚处。缆索隧道的距离与安全系数呈非线性增长关系。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Research on the Disturbance Law on the Cable Tunnel Induced by the Foundation Pit Construction of Pile Enclosing Structure
Based on the engineering geological conditions of Shijiazhuang city, this paper analyzes the impact of foundation pit construction of pile enclosing structure on the horizontal deformation of the piles and ground settlement, and the deformation and structural internal force on the adjacent cable tunnel. Based on the above, the influence of the distance between foundation pit and tunnel on the deformation and safety of cable tunnels are also discussed. The research results show that the surface settlement on the side with tunnel is less than that without tunnel after the excavation of the foundation pit. The longitudinal stress of the cable tunnel structure is the main factor to the safety of the structure, and the maximum longitudinal tensile stress is located the tunnel wall foot far away from the foundation pit. There existing no-linear increasing relationship between the distance and the safety factor of the cable tunnel.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信