{"title":"博阿维斯塔河上桥梁的修复和加固","authors":"Marcelo Melo, João Luís Casagrande, Leonardo Patrício","doi":"10.2749/prague.2022.1172","DOIUrl":null,"url":null,"abstract":"This work presents the analysis, strengthening and structural rehabilitation of the Bridges over Boa Vista River (North and South lanes on a Highway in the south of Brazil), due to a fire accident caused by a fuel tanker truck explosion. After the accident, both bridges were blocked and the traffic was diverted to secondary roads, leading to major inconvenience to the users and roads administration. Initially a new structure construction was considered, given the apparent damage caused by the large fire. After inspections, laboratory tests and structural analysis, it was concluded that it would be possible to recover the existing structure with the strengthening in specific regions and conduct a load test on the most affected areas. The collaborative work between the Highway operations, inspection team, contractors and structural engineers has reduced the expected reopening time of both bridges from 6 to less than 2 months.","PeriodicalId":168532,"journal":{"name":"IABSE Symposium, Prague 2022: Challenges for Existing and Oncoming Structures","volume":"33 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":"{\"title\":\"Rehabilitation and Strengthening of Bridges over Boa Vista River\",\"authors\":\"Marcelo Melo, João Luís Casagrande, Leonardo Patrício\",\"doi\":\"10.2749/prague.2022.1172\",\"DOIUrl\":null,\"url\":null,\"abstract\":\"This work presents the analysis, strengthening and structural rehabilitation of the Bridges over Boa Vista River (North and South lanes on a Highway in the south of Brazil), due to a fire accident caused by a fuel tanker truck explosion. After the accident, both bridges were blocked and the traffic was diverted to secondary roads, leading to major inconvenience to the users and roads administration. Initially a new structure construction was considered, given the apparent damage caused by the large fire. After inspections, laboratory tests and structural analysis, it was concluded that it would be possible to recover the existing structure with the strengthening in specific regions and conduct a load test on the most affected areas. The collaborative work between the Highway operations, inspection team, contractors and structural engineers has reduced the expected reopening time of both bridges from 6 to less than 2 months.\",\"PeriodicalId\":168532,\"journal\":{\"name\":\"IABSE Symposium, Prague 2022: Challenges for Existing and Oncoming Structures\",\"volume\":\"33 1\",\"pages\":\"0\"},\"PeriodicalIF\":0.0000,\"publicationDate\":\"1900-01-01\",\"publicationTypes\":\"Journal Article\",\"fieldsOfStudy\":null,\"isOpenAccess\":false,\"openAccessPdf\":\"\",\"citationCount\":\"0\",\"resultStr\":null,\"platform\":\"Semanticscholar\",\"paperid\":null,\"PeriodicalName\":\"IABSE Symposium, Prague 2022: Challenges for Existing and Oncoming Structures\",\"FirstCategoryId\":\"1085\",\"ListUrlMain\":\"https://doi.org/10.2749/prague.2022.1172\",\"RegionNum\":0,\"RegionCategory\":null,\"ArticlePicture\":[],\"TitleCN\":null,\"AbstractTextCN\":null,\"PMCID\":null,\"EPubDate\":\"\",\"PubModel\":\"\",\"JCR\":\"\",\"JCRName\":\"\",\"Score\":null,\"Total\":0}","platform":"Semanticscholar","paperid":null,"PeriodicalName":"IABSE Symposium, Prague 2022: Challenges for Existing and Oncoming Structures","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2749/prague.2022.1172","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

摘要

这项工作介绍了由于油罐车爆炸引起的火灾事故而导致的博阿维斯塔河上的桥梁(巴西南部高速公路的南北车道)的分析,加强和结构修复。事故发生后,两座桥梁被封锁,交通被分流到次要道路,给使用者和道路管理带来了很大的不便。考虑到大火造成的明显破坏,最初考虑建造一个新的结构。经过检查、实验室试验和结构分析,得出的结论是,在特定区域进行加固,可以恢复现有结构,并对受影响最严重的地区进行负荷试验。公路运营、检查小组、承包商和结构工程师之间的协同工作将两座桥梁的预计重新开放时间从6个月缩短到不到2个月。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
Rehabilitation and Strengthening of Bridges over Boa Vista River
This work presents the analysis, strengthening and structural rehabilitation of the Bridges over Boa Vista River (North and South lanes on a Highway in the south of Brazil), due to a fire accident caused by a fuel tanker truck explosion. After the accident, both bridges were blocked and the traffic was diverted to secondary roads, leading to major inconvenience to the users and roads administration. Initially a new structure construction was considered, given the apparent damage caused by the large fire. After inspections, laboratory tests and structural analysis, it was concluded that it would be possible to recover the existing structure with the strengthening in specific regions and conduct a load test on the most affected areas. The collaborative work between the Highway operations, inspection team, contractors and structural engineers has reduced the expected reopening time of both bridges from 6 to less than 2 months.
求助全文
通过发布文献求助,成功后即可免费获取论文全文。 去求助
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信